Custom Home Builders Lane Cove
In Lane Cove, the council's sustainability rules shape a new home before anyone picks a window.
Lane Cove Council's development control plan has a whole part on environmental sustainability, Part S, last amended in July 2024. For a new house that goes to council, it covers energy, glazing, shade, materials and stormwater. If you've been searching for a Passive House builder, a lot of that thinking is already in the rules. Here's how I build to them.
Short answer
What does Lane Cove Council ask of a new custom home?
Beyond the Lane Cove LEP 2009 and the usual DCP controls, Part S of the Lane Cove DCP applies to new development above its cost-of-works threshold. It asks for an all-electric building with no natural gas, rooftop solar, limits on glazing per facade, external shading, low-reflectivity glass, FSC-certified new timber and no silica-based engineered stone. Each item needs evidence lodged with the DA.
Written and reviewed by Oliver Alameri
Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana
Fact-checked
Part S: the sustainability chapter of the DCP
The Lane Cove Local Environmental Plan 2009 came into force on 19 February 2010, and the development control plan that supports it on 22 February 2010. Of the DCP's many parts, Part S, Environmental Sustainability, is the one that changes how a new house is designed, and its current version is the amendment of 18 July 2024.
Its stated aim is for new buildings to work towards net zero by 2035, improve the resilience and health of the people in them, and manage water better. It applies to new development over a cost-of-works threshold, which a new house will normally exceed. Where it conflicts with another part of the DCP, Part S prevails unless that part says otherwise.
Part S isn't a box to tick at the end. It's a brief to design from at the start.
All-electric, with the roof doing some of the work
New development is to use only electricity for normal operations. Bottled gas is allowed for an outdoor barbecue, and that's about it. Council wants a statement at DA stage confirming there's no natural gas service, and the BASIX certificate is checked to make sure gas isn't being relied on to pass.
A new house of three storeys or less also needs a rooftop solar system, sized either by roof coverage or by output per square metre of site. Where existing trees shade part of the roof badly enough, that part is exempt, and the control doesn't allow you to remove trees to make room. Part S also asks you to consider a battery, and prefers low global-warming refrigerants in air conditioning and heat pumps where they're available on similar terms.
- No natural gas connection
- Rooftop solar sized to the Part S formula
- A battery considered, not required
- Low global-warming refrigerants where available
Building in Lane Cove?
Send the address and any sketches you have. Oliver will respond within 4 working hours for a free initial conversation.
0476 300 300Windows, shade and heat
This is where Part S meets Passive House thinking. Each major facade has a window-to-wall ratio limit, checked both outside and inside, with walls facing your private open space left out of the calculation. Glass on the north, east and west should have external shading where it isn't already shaded by neighbours or balconies, and glass reflectivity is capped.
For a house, windows should sit on more than one side of the home to promote cross ventilation, with openings sized to the NCC's natural ventilation rules. On the ground, a set share of a low-density site has to be planting, green roof, highly reflective roofing, shaded paving or water, so a site covered in pale paving won't pass.
Passive House certification is a voluntary standard, assessed separately from BASIX. Part S doesn't require it. But a design aimed at it, with modest shaded glazing, cross ventilation and a well-insulated envelope, sits comfortably inside Part S.
Materials, the old house and the stormwater
Newly sourced timber is to be FSC certified. Products made with formaldehyde, chlorinated polymers or halogenated flame retardants should be swapped for alternatives where they exist, and silica-based engineered stone must not be used. That last one changes the kitchen and bathroom schedule, so it goes in the selections early.
Part S also asks designers to minimise demolition where possible, use prefabricated elements where they suit and standardise details to cut waste on site. On a knockdown, it's worth asking whether part of the existing structure can stay.
Stormwater has to be held back with a detention system, with porous surfaces used as much as possible. Parts J and O of the DCP deal with landscaping, tree preservation and stormwater, and the LEP maps show any heritage listing, foreshore building line, riparian land or acid sulphate soils on the lot.
What a Lane Cove home costs, and the approval
Rawlinsons gives $2,940–$3,170/m² for a medium-finish full-brick individual house in Sydney and $3,940–$4,250/m² for a high-finish brick veneer house, excluding GST, escalated to the ABS September 2026 index. Solar, any battery, demolition and site works are priced separately.
Part S is written for development applications, and a DA has a 40-day assessment period. If the house qualifies as complying development under the Housing Code, a certifier assesses it against the code's standards instead, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The ABS average build for a new NSW house was 2.99 quarters in 2025-26.
What I check first in Lane Cove
Before any drawings, these shape the house.
- 01
Zoning, heritage and foreshore building line on the LEP maps
- 02
Which Part S controls apply and what evidence they need
- 03
Roof area clear of tree shade for the solar
- 04
Glazing on each facade against the window-to-wall limit
- 05
Trees protected under Part J of the DCP
- 06
Stormwater detention and where it can discharge
Custom homes in Lane Cove
Do you build custom homes in Lane Cove and Longueville?
Yes. Buildana builds across Sydney from a studio in Fairfield, including the Lane Cove Council area, which takes in Longueville. Oliver Alameri is the licensed builder, NSW contractor licence 487805C. Send the address and I'll tell you plainly what the lot and the DCP allow.
Can a new Lane Cove home have gas?
Under Part S, new development is to use only electricity for normal operations. Bottled gas is allowed for an outdoor barbecue. Anything that genuinely can't run on electricity needs evidence that no electric alternative exists.
Do you build Passive House homes?
Passive House is a voluntary standard, certified separately. If your designer is working to it, I build to their details, including the airtightness and insulation, and price them properly. Part S and BASIX apply either way.
What does a custom home cost in Lane Cove?
The published Sydney rate for a medium-finish full-brick house is $2,940–$3,170/m², excluding GST. The design, the lot and your selections move it from there. I don't give a fixed price from a first conversation.
Sources and references
Costs are from the Rawlinsons handbook with the local cost index applied; rules and timeframes are checked against the sources below.
- Lane Cove Council
- Rawlinsons Australian Construction Handbook, Rawlhouse Publishing
- Environmental Planning and Assessment Act 1979 (NSW)
- State Environmental Planning Policy (Exempt and Complying Development Codes) 2008
- BASIX, NSW Planning Portal
- Water Management Act 2000 (NSW)
- Search heritage databases, NSW Environment and Heritage
- NSW Planning Portal Spatial Viewer (zoning, FSR and hazard maps)
- Nationwide House Energy Rating Scheme (NatHERS)
- National Construction Code, ABCB
Start with the lot and Part S
Tell me the address and what you'd like to build. Oliver will respond within 4 working hours for a free initial conversation.