How much does a knock down rebuild cost in Sydney?
The new house is most of it. From Rawlinsons Sydney rates, a 200–230m² single storey costs $565k–$980k + GST to build and a 260–300m² double storey $735k–$1.27M + GST, at a medium to high finish. Demolition, asbestos, footings, services, approvals and outside works come on top and depend on the block.
How long does a knock down rebuild take?
Approval is quicker than most people expect: a complying development certificate must be decided within 20 days where neighbours are notified (10 otherwise), and a DA has a 40-day assessment period. The ABS average build time for new houses in NSW was 2.99 quarters, about 9 months, in 2025-26. Design time depends on your decisions.
Is it cheaper to knock down and rebuild or renovate?
It depends on how much of the house is worth keeping. A renovation that touches most rooms, the structure and the services can approach the cost of a new house without fixing its layout. We price both when it's close.
Can I knock down and build a duplex?
Often, if the lot qualifies. In low and mid-rise housing areas a DA for a dual occupancy can't be refused on lot size or width at 450m² and 12m; elsewhere your council's minimum applies, from 500m² to 700m² in the councils we've checked. Two dwellings and two titles are separate approvals.
Do I need approval to demolish my house?
Yes. Demolition is usually approved together with the new home, either as complying development by a certifier or through a development application to council. Approving both together avoids paying holding costs on an empty block.
What happens if the house has asbestos?
Don't disturb it. Have it identified before demolition, and removed by a licensed asbestos removalist. For more than 10m² of bonded asbestos, the removalist must notify SafeWork NSW at least 5 days before starting.
Do you offer knock down rebuild packages?
No fixed packages. We design and build one-off homes, so the house is drawn for your block and priced from that design, with site costs shown separately. If you're comparing packages, ask what the advertised price leaves out.
Where will I live during the build?
Not on site: the house comes down. Plan rent or family, storage and moving for the length of the approval and build, and talk to your lender about finance during construction.
Do you build knockdown rebuilds across Sydney?
Yes. We're based in Fairfield and build across Sydney, from Western Sydney to the North Shore and Northern Beaches. Send the address and we'll tell you plainly if it's a job we can take on.