We’re here to make it feel like home

Knock down rebuild builders · Sydney

Knock down and rebuild in Sydney.

Keep the street, the school and the neighbours. Replace the house with one designed for the block and for how you live now, with demolition, approvals and the build handled by one licensed builder.

Free initial conversation. Response within 4 working hours.

NowSame block
NextNew home
Same address, new house. Diagram, not a design.
To build a 200–230m² single storey
$565k–$980k + GST
A CDC must be decided within
20 days where neighbours are notified
NSW average to build a new house
2.99 quarters, ABS 2025-26

The decision before the design

Why knock down and rebuild?

Most people who rebuild like where they live and have outgrown the house. A renovation keeps the old structure, its levels, its services and often its problems. A rebuild starts again on land you already own, without the stamp duty and moving costs of buying elsewhere.

It isn't always the right answer. If the house is sound and the layout nearly works, renovating or extending can cost less. We'll tell you which way the numbers point for your house.

  • The house you have: whether its structure, services and layout are worth keeping.
  • The block underneath: survey, soil, slope, trees, easements and the planning controls.
  • The home you need: rooms, outdoor space, budget, and where you'll live during the build.

What a knock down rebuild costs

The house,
then the block.

To build the new house: a 200–230m² single storey costs $565k–$980k + GST and a 260–300m² double storey $735k–$1.27M + GST, medium to high finish brick veneer, from Rawlinsons Sydney rates. Demolition, asbestos, site costs and approvals sit on top and depend on the block.

Rawlinsons Ed. 29 Sydney individual-house rates, brick veneer, $2,820–$4,250/m² before GST, escalated to the ABS September 2026 index. Area measured to the inner face of external walls.

Read the full knock down rebuild cost guide

To build the new house, medium to high finish
HouseExcl. GSTIncl. GST
Single storey, 200–230m²$565k–$980k$622k–$1.08M
Double storey, 260–300m²$735k–$1.27M$809k–$1.4M

Then, depending on the block

Demolition and clearing
Depends on the size and construction of the house, access, and how much is buried: old footings, pipes and tanks.
Asbestos
Common in homes built or renovated before 1990. Licensed removal and clearance, priced after a hazardous materials survey.
Site, footings and services
Slope, soil class, rock and fill set the footings. Sewer, water and power connections are renewed for the new home.
Approvals and consultants
Survey, soil test, design, engineering, BASIX, certification, and council contributions where they apply.
Outside the house
Driveway, fencing, landscaping and paving, which a house price often leaves out.
Living elsewhere
Rent, storage and moving for the length of the build.
Try the knock down rebuild calculator

How long it takes

Four clocks you
can actually check.

Design time is yours. These are set by law, or measured by the ABS. Read how long a knockdown rebuild takes, stage by stage.

  • 20 days

    Complying development

    A certifier must decide a CDC within 20 days where neighbours are notified first, or 10 days otherwise.

    EP&A Regulation 2021, s 133
  • 40 days

    Development application

    The assessment period for most DAs. If council hasn't decided by then, you can treat it as refused and appeal.

    EP&A Regulation 2021, s 91
  • 5 days

    Asbestos notice

    Licensed removal of more than 10m² of bonded asbestos can't start until 5 days after SafeWork NSW is notified.

    SafeWork NSW
  • 2.99 quarters

    Building the house

    The ABS average from commencement to completion for new houses in NSW in 2025-26: about 9 months.

    ABS, Building Activity, Australia, June 2026

The knock down rebuild process

Seven steps,
one builder.

We design and build one-off homes, so the house is drawn for your block. Demolition, approvals and construction stay with us, under one contract.

  1. Site visit and brief

    We walk the house and the block with you, talk through what you need, and say plainly whether rebuilding, renovating or extending makes most sense.

  2. Investigations

    Survey, soil test, planning certificate and, for an older house, a hazardous materials survey. They define the site work before the design is fixed.

  3. Design and price

    The new home is designed for the lot, its orientation and its fall, and priced as the design develops, with site costs separated from the house.

  4. Approval

    Demolition and the new home are usually approved together: by a certifier as complying development if the design meets the code, or by a development application to council.

  5. Contract and move out

    A written fixed-price contract, home building compensation cover, and time to arrange where you'll live. Services are disconnected before demolition.

  6. Demolition and build

    Licensed asbestos removal first, then demolition and site clearing, then the slab, frame, roof and fit-out, with the certifier's critical stage inspections along the way.

  7. Handover

    The final inspection, the occupation certificate and the keys, with your warranties and maintenance information.

The completed Smart Street duplex frontage by Buildana
Smart Street, a completed Buildana duplex. Shown for finish, not as a before-and-after rebuild.

Read the block first

The old footprint
isn't the new permission.

A new house is assessed against today's controls, not the ones the old house was built under. Setbacks, height, floor area and the approval path all come from current information for your lot.

  • Planning certificate: zoning, heritage, flood and bushfire mapping for your lot.
  • Survey and soil test: levels, boundaries and the site class that sets the slab.
  • Trees, easements and services: what has to be protected, moved or reconnected.
  • Access: room for demolition machinery, trucks and deliveries, and the neighbours either side.

Knock down rebuild duplex

One home,
or two?

On a large enough lot, a knockdown rebuild can put two homes where one stood. In NSW low and mid-rise housing areas, a DA for a dual occupancy can't be refused on lot size or width at 450m² and 12m. Elsewhere your council's plan sets the minimum, and it's often higher.

Building two homes and selling them separately are different approvals: check the title options before you design. See how we work as duplex builders in Sydney, or check the minimum land size for a duplex.

Our finished work

What the new home
can feel like.

Eight views of Buildana's completed Smart Street duplex. They show our design and finish, not a before-and-after record of a single-home knockdown rebuild.

Choosing knock down rebuild specialists

Comparing builders
and packages.

We don't sell fixed packages; we price a design for your block. Whoever you choose, these four checks protect you.

  • Check the licence

    Look up the builder's contractor licence on Verify NSW before you sign anything.

    Verify NSW
  • Ask for the insurance certificate

    Residential building work over $20,000 needs home building compensation cover. Ask for the certificate before paying a deposit.

    icare NSW
  • Keep the deposit to 10%

    In NSW the deposit on residential building work can't be more than 10% of the contract price.

    NSW Government
  • Read what the price leaves out

    Demolition, asbestos, footings for your soil, service connections, the driveway and landscaping are where package prices and real totals part ways.

    Knock down rebuild cost guide

Bring the address

Send the address. We'll look at the whole change.

Oliver will respond within 4 working hours for a free initial conversation about the house, the block and what you'd build in its place.

The first conversation is free. Reports, consultants and detailed feasibility are scoped and priced separately.

Our studio in Fairfield
Shop 1 - 46 Court Road Fairfield
0476 300 300 Buildana Pty Ltd / NSW contractor licence 487805C

Start your project conversation

Name, mobile and email are required. Share whatever project information you have; the other fields are optional.

Your project

Have a survey or drawings? Mention them above and we can discuss what to review. Please leave sensitive financial or identity documents out of your enquiry.

No obligation. Rather talk? 0476 300 300

Knock down rebuild
questions.

How much does a knock down rebuild cost in Sydney?

The new house is most of it. From Rawlinsons Sydney rates, a 200–230m² single storey costs $565k–$980k + GST to build and a 260–300m² double storey $735k–$1.27M + GST, at a medium to high finish. Demolition, asbestos, footings, services, approvals and outside works come on top and depend on the block.

How long does a knock down rebuild take?

Approval is quicker than most people expect: a complying development certificate must be decided within 20 days where neighbours are notified (10 otherwise), and a DA has a 40-day assessment period. The ABS average build time for new houses in NSW was 2.99 quarters, about 9 months, in 2025-26. Design time depends on your decisions.

Is it cheaper to knock down and rebuild or renovate?

It depends on how much of the house is worth keeping. A renovation that touches most rooms, the structure and the services can approach the cost of a new house without fixing its layout. We price both when it's close.

Can I knock down and build a duplex?

Often, if the lot qualifies. In low and mid-rise housing areas a DA for a dual occupancy can't be refused on lot size or width at 450m² and 12m; elsewhere your council's minimum applies, from 500m² to 700m² in the councils we've checked. Two dwellings and two titles are separate approvals.

Do I need approval to demolish my house?

Yes. Demolition is usually approved together with the new home, either as complying development by a certifier or through a development application to council. Approving both together avoids paying holding costs on an empty block.

What happens if the house has asbestos?

Don't disturb it. Have it identified before demolition, and removed by a licensed asbestos removalist. For more than 10m² of bonded asbestos, the removalist must notify SafeWork NSW at least 5 days before starting.

Do you offer knock down rebuild packages?

No fixed packages. We design and build one-off homes, so the house is drawn for your block and priced from that design, with site costs shown separately. If you're comparing packages, ask what the advertised price leaves out.

Where will I live during the build?

Not on site: the house comes down. Plan rent or family, storage and moving for the length of the approval and build, and talk to your lender about finance during construction.

Do you build knockdown rebuilds across Sydney?

Yes. We're based in Fairfield and build across Sydney, from Western Sydney to the North Shore and Northern Beaches. Send the address and we'll tell you plainly if it's a job we can take on.

Knock down rebuild
across Sydney.

From our Fairfield studio we build across Sydney. Suburb pages cover the local council, mapping and site conditions.

Find your suburb