Lane Cove West 2066 · Lane Cove
House Demolition & Knockdown Rebuild Lane Cove West
Demolition is one line in a Lane Cove West rebuild. Get it in the right order.
Most people searching for house demolition in Lane Cove West are planning what comes next: a new home on the same block, between Burns Bay Road and the Lane Cove River. Demolition is approved with that new home, done after the services are cut and any asbestos is out, and finished in days. The order is what matters.
Short answer
How does house demolition work in Lane Cove West?
Demolition is normally approved together with the new home, under a complying development certificate or a development application to Lane Cove Council. Before the machines arrive, services are disconnected, a hazardous materials survey identifies any asbestos, and licensed removalists take it out. The house then comes down, the site is cleared, and the new build starts.
Written and reviewed by Oliver Alameri
Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana
Fact-checked
The demolition sequence
Demolition can be approved on its own, but on a knockdown rebuild it's usually part of the approval for the new house. Knocking down before the new design is approved leaves you holding an empty block, so the approval comes first.
Then, in order: electricity, gas and water are disconnected or made safe, and the sewer is capped. A hazardous materials survey identifies asbestos and other materials. Licensed asbestos removal is completed and cleared. Only then does the structure come down and the site get cleared to the level the new build needs.
- Approval for demolition and the new home
- Services disconnected and the sewer capped
- Hazardous materials survey and licensed asbestos removal
- Demolition, site clearing, then the new slab or footings
Neighbours, trees and the street
Lane Cove West is a suburb of close neighbours and established trees. A dilapidation report on the adjoining houses before demolition records their condition, which protects both sides if a question comes up later. Lane Cove Council controls tree removal and pruning, so trees to be kept need protection fencing and any to be removed need approval.
Machinery, trucks and skips need a plan for the street, including where they park and when they can work.
The house comes down in days. The neighbours live next to it for the whole build.
Knocking down in Lane Cove West?
Tell us about the house and the block. We'll respond within 4 working hours for a free initial conversation.
0476 300 300Slopes to the river, and the new home
Many streets fall towards the Lane Cove River and its bushland reserves. On a sloping block, the new design decides whether you cut into the slope, build on piers or step the floor levels, and a geotechnical report on what's under the old house matters as much as the demolition.
For the new home itself, Rawlinsons prices a medium-finish brick veneer individual house at $2,820–$3,040/m² and a high-finish one at $3,940–$4,250/m², excluding GST, Sydney, escalated to the ABS September 2026 index. Demolition, site works and the slope sit on top.
What I check first on a Lane Cove West rebuild
Before demolition is booked, these shape the job.
- 01
Planning certificate: bushfire, heritage and other mapping
- 02
Asbestos and other hazardous materials in the old house
- 03
Services to disconnect, and the sewer connection
- 04
Trees to keep, protect or apply to remove
- 05
Slope, rock and the geotechnical report
- 06
Neighbours' condition, recorded before work starts
Demolition and rebuilding in Lane Cove West
Do I need approval to demolish a house in Lane Cove West?
Yes. Demolition needs approval, either a complying development certificate if it meets the code or development consent from Lane Cove Council. On a knockdown rebuild it's usually approved together with the new home.
Who removes asbestos before demolition?
A licensed asbestos removalist. The material is identified first in a hazardous materials survey, and removal is cleared before demolition continues.
Can I demolish first and design later?
You can apply for demolition alone, but it's rarely a good idea: you pay holding costs on an empty block while the new design is approved. We usually approve and sequence both together.
Do you build in Lane Cove and the lower North Shore?
Yes. We're based in Fairfield and work across Sydney. Send the address and we'll tell you plainly if it's a job we can take on.
Sources and references
Costs are from the Rawlinsons handbook with the local cost index applied; rules and timeframes are checked against the sources below.
- Lane Cove Council
- Rawlinsons Australian Construction Handbook, Rawlhouse Publishing
- Environmental Planning and Assessment Act 1979 (NSW)
- State Environmental Planning Policy (Exempt and Complying Development Codes) 2008
- Asbestos, SafeWork NSW
- Building on bush fire prone land, NSW RFS
- Building or renovating a home, NSW Government
- Search heritage databases, NSW Environment and Heritage
- NSW Planning Portal Spatial Viewer (zoning, FSR and hazard maps)