House Demolition & Knockdown Rebuild Linley Point

Demolition and a new home in Linley Point 2066, approved together and built under one contract. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300

Linley Point KDR — Single Contract, New Home

A knockdown rebuild in Linley Point is a premium river-fall project on the peninsula extending into the Lane Cove and Parramatta Rivers — Federation mansions, inter-war heritage and contemporary river-fall builds on 700 to 1,500m² blocks with substantial fall. A rebuild lets you design a substantial home around a genuine river outlook.

The sandstone-dominant ground means significant rock excavation, and combined with the substantial fall, a rebuild needs suspended slabs and substantial retaining. I get a real geotech so the rock, fall and retaining are all costed properly, because on a Linley Point block that is the bulk of the substructure budget.

Heritage Conservation Areas cover most streets, so a rebuild generally goes down the DA path. The pre-war stock can carry asbestos and lead paint, so a licensed strip-out leads the demolition.

We rebuild under NSW contractor licence 487805C. Get our feasibility, with the rock and fall costed, before you commit.

Buildana manages the complete knockdown rebuild process in Linley Point — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home designed for your Linley Point block
  • Lane Cove Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • M — engineered slab design included
  • Typical blocks 700–1,500m² in Linley Point
  • Single and two-storey designs available
  • Statutory home warranties
  • Free site assessment — near Wollstonecraft (5 km, ferry from Greenwich) station
Knockdown-rebuild project by Buildana in Linley Point 2066
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

A premium river-fall peninsula

Linley Point is the river-fall peninsula extending into the Lane Cove and Parramatta Rivers, with Federation mansions and contemporary river-fall builds on 700 to 1,500m² blocks. A rebuild here designs a substantial home around a genuine river outlook.

It is a premium harbourside pocket where a considered rebuild rewards the setting.

Rock and river fall

The sandstone-dominant ground means significant rock excavation, and with the substantial fall, a rebuild needs suspended slabs and substantial retaining. I get a real geotech so the rock, fall and retaining are all costed properly — on a Linley Point block, that is the bulk of the substructure budget.

Heritage Conservation Areas cover most streets, so a rebuild generally goes down the DA path. The pre-war stock can carry asbestos and lead paint, so a licensed strip-out leads the demolition.

Knockdown-rebuild builder in Linley Point — key facts

Suburb
Linley Point, NSW 2066
Council / LGA
Lane Cove Council (Lane Cove)
Primary zoning
R2 Low Density
Typical lot size
700–1,500m²
Soil class
M
Home era
1900s–1950s heritage
Typical price range
To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Knockdown Rebuild in Linley Point

Free KDR site assessment for Linley Point 2066. We'll assess your block and talk through demolition, approvals and the build.