Site preparation and earthworks

Site preparation in Sydney.

What is under the ground decides the slab, the drainage and a real share of the budget. We find out before the price is fixed.

Discuss my site
  1. Existing house and structuresDemolition, asbestos, trees
  2. Topsoil and old fillStripping, uncontrolled fill
  3. Services below the surfaceSewer, water, power, gas, stormwater
  4. Natural groundSoil class, moisture, bearing
  5. Rock or groundwaterBreaking, dewatering, footing depth
What we look at, from the surface down
Excavators, red clay spoil heaps and service pipes on a residential estate during site preparation
Design referenceTroy MortierLicence

Reference photograph of residential site preparation, not a Buildana project.

The ground goes first. In the programme and the budget.

Site preparation turns a block into a platform a home can be built on: the old house gone, services located, the ground tested, levels cut and filled, retaining and drainage in place, and the footprint set out. It happens before anyone sees a wall go up, which is why it is easy to underestimate.

Buildana plans and manages site preparation as part of the homes and developments we build across Sydney, from knockdown rebuilds to duplexes. Licensed specialists do the regulated work, such as asbestos removal, demolition and surveying. We bring the survey, geotechnical report and engineering together so the site work is priced from evidence, not an allowance.

  • Investigate

    survey, geotechnical report and located services.

  • Clear

    demolition, asbestos, trees and anything else in the way.

  • Shape

    excavation, fill, retaining, drainage and set-out for the slab.

Site preparation cost breakdown

Every line has a cause.
Find it before you price it.

Site costs vary more than any other part of a new build because every block is different underground. Rather than a single allowance, each line below is tied to a site condition and to the report or professional that confirms it.

What drives each site preparation cost
Cost itemDriven byConfirmed by
Survey and set-outBoundaries, levels, easements and the building positionRegistered surveyor
Geotechnical investigationSoil reactivity, fill, rock and groundwaterGeotechnical engineer
Service location and connectionsWhere sewer, water, power and stormwater run, and how farService locator and authorities
Demolition and asbestosSize and construction of the existing buildingsLicensed demolisher and asbestos removalist
Trees and clearingProtected trees, root zones and vegetationCouncil and arborist
Excavation and rockCut depth, slope and what is found belowDesign levels and geotechnical report
Spoil disposal and fillVolume and waste classification of material leaving or arrivingWaste classification and compaction testing
Retaining and drainageLevel changes, stormwater design and any on-site detentionStructural and hydraulic engineers

We price these items after the survey and geotechnical report, and show them separately in the scope. Published per-metre rates cannot tell you what your block holds.

AS 2870 site classification

The soil class
sets the slab.

Much of Western Sydney sits on reactive clay that swells when wet and shrinks when dry. The geotechnical engineer classifies the site under AS 2870, and the footing and slab are designed to suit. The further along the scale, the stiffer the design needs to be.

  1. ALittle or no movement
  2. SSlight
  3. MModerate
  4. H1High
  5. H2Very high
  6. EExtreme

Class P sits outside the scale: problem sites such as uncontrolled fill, soft ground or sites affected by trees, which need specific engineering.

Mini excavator beside a deep service trench in a suburban backyard
Design referenceAnnie SprattLicence

Reference photograph of a service trench, not a Buildana project.

Before and below the dig

Three things that are
regulated, not optional.

Asbestos before demolition
Older houses often contain asbestos in fibro, eaves, floor coverings or roofing. In NSW, friable asbestos and more than 10m² of non-friable asbestos must be removed by a licensed removalist before the house comes down. SafeWork NSW: asbestos
Services before excavation
Underground assets are located before digging, through Before You Dig Australia and on-site location, so trenches and footings avoid live services. Before You Dig Australia
Spoil before it leaves
Excavated soil is classified under the NSW EPA waste classification guidelines and taken to a facility that can lawfully accept it. Clean natural material and contaminated material are handled very differently. NSW EPA: classifying waste

From the old house
to a slab-ready site.

  1. 01

    Survey and investigate

    A registered surveyor records levels and boundaries. A geotechnical engineer tests the soil. Underground services are located before anyone digs.

  2. 02

    Engineer and price

    Footing, slab, retaining and stormwater design follow the reports, so the site work can be scoped and priced rather than left as an allowance.

  3. 03

    Demolish and clear

    Asbestos is assessed and removed by licensed contractors, then demolition, tree removal and clearing proceed under the applicable approvals.

  4. 04

    Excavate and shape

    Cut and fill to the design levels, rock removal where needed, spoil classified and taken to an appropriate facility, fill placed and compacted.

  5. 05

    Drain, retain and set out

    Retaining walls, stormwater and any on-site detention go in, and the building footprint is set out for footings and slab.

Site preparation for: Knockdown rebuild sites, from demolition to slab / New homes, duplexes and granny flats / Townhouse and multi-dwelling sites / Sloping, rocky or reactive-clay blocks / Battle-axe and restricted-access lots.

Start with the block

Send the address. We will look at the ground.

Oliver will respond within 4 working hours for a free initial conversation about your site and the build it needs to support.

Tell us what is on the site now and what you plan to build. A survey, geotechnical report or sewer diagram helps if you already have one.

Our studio in Fairfield
Shop 1 - 46 Court Road Fairfield
0476 300 300 Buildana Pty Ltd / NSW contractor licence 487805C

Start your project conversation

Name, mobile and email are required. Share whatever project information you have; the other fields are optional.

Your project

Have a survey or drawings? Mention them above and we can discuss what to review. Please leave sensitive financial or identity documents out of your enquiry.

No obligation. Rather talk? 0476 300 300

Site preparation questions,
answered plainly.

What does site preparation include?

Typically a site survey, a geotechnical investigation, locating underground services, demolition and clearing, asbestos removal where present, excavation and filling to design levels, rock removal, spoil disposal, retaining walls, stormwater drainage and setting out the building. The exact list depends on the block and the design.

How much does site preparation cost in Sydney?

It depends on what the ground and the existing site require. A flat, clear block with good access needs far less than a sloping lot with rock, asbestos in an old house or a long run to the sewer. We price site work after the survey and geotechnical report, and show each item separately rather than as one allowance.

What makes up a site preparation cost breakdown?

Investigations (survey, geotechnical report, service location), demolition and asbestos, tree removal, excavation and rock, spoil classification and disposal, imported fill and compaction, retaining walls, stormwater and any on-site detention, and service connections. Each one is driven by a specific site condition, so each should be visible in the scope.

Do I need a geotechnical report before building?

The footing and slab design needs reliable site classification information. A geotechnical investigation tests the soil and gives the engineer the reactivity class and other ground conditions. It is one of the first things we organise on a new build.

What do soil classes A, S, M, H and E mean?

They are site classifications from AS 2870, the Australian standard for residential slabs and footings. They describe how much reactive clay may move with changes in moisture, from Class A (little or no movement) through S, M, H1 and H2 to E (extreme). Class P applies to problem sites, such as uncontrolled fill or soft ground. Higher classes need stiffer footing and slab designs.

Who removes asbestos before demolition?

In NSW, friable asbestos and more than 10m² of non-friable asbestos must be removed by a licensed asbestos removalist. Houses built before the late 1980s often contain it in fibro sheeting, eaves, floor coverings or roofing. It is identified before demolition and removed under the work health and safety requirements.

What happens to the soil that is dug out?

Excavated material has to be classified under the NSW EPA waste classification guidelines and taken to a facility that can lawfully accept it, unless it can be reused on site. Clean natural material and contaminated material are treated very differently, which is why classification matters to the cost.

Do you do site preparation on its own?

Site preparation is part of the homes and developments we build. If you are planning a new home, knockdown rebuild, duplex or granny flat, send the address and we will talk through the site work it will need.