Demolition, asbestos, the new home, site works, approvals, GST and the rent you pay while it happens. Every line shown, nothing rolled into a “from” price.

Data updated May 2026NSW Builder LIC 487805C · Sydney

Your knock down rebuild

240 m²

Where the money goes

Demolition incl. asbestos removal
Licensed demolisher, clearance certificate, service disconnections, skip and tip fees
$58,000
New home, 240 m² at $2,968/m²
Standard finish, double storey
$712,320
Site works
Earthworks, scaffold, fencing, temporary services, soil test
$52,801
Design, engineering, surveys, BASIX
$52,976
Approvals (CDC), s7.12 levy, HBCF insurance
Fairfield LGA, typical 20–40 days
$24,873
Contingency 8.5%
Knock down rebuilds carry the highest unknowns of any residential job
$76,582
GST 10%
$97,755
Project cost inc. GST$1,075,307
Rent while you build, 11 months$35,200

Your knock down rebuild estimate

$1,110,507

Likely range $1,032,772 – $1,199,348, including rent

All-in per m²
$4,480
Contract to keys
11 months
Approval
20–40 days
Demolition share
5%

Guide only. Rates are May 2026 Sydney figures reconciled against Rawlinsons and Buildana's own knock down rebuilds. Your soil test, survey and design decide the fixed price.

Want this as a fixed price for your street?

Send us the address. We check the zoning, the sewer, the trees and the soil before we quote, so the number you get is the number you build to.

How the knock down rebuild estimate is built

Most knock down rebuild “from” prices are the house only. They leave out the part that makes a KDR a KDR: getting rid of the existing one. This calculator starts there. Demolition is a fixed line, with asbestos removal added unless the house is post-1990, because on Sydney's fibro and brick-veneer stock the hygienist finds it far more often than not.

The new home is priced per square metre at a knock down rebuild rate, which sits a little above a vacant-block custom home because the site is never quite clean, then scaled for finish level, storeys, slope and access. Site works take 6.5% of the build plus fixed allowances for retaining and reactive clay. Approvals use the selected council's typical CDC or DA fee, the s7.12 levy at 1% of the build, and HBCF insurance. Contingency sits at 8.5%, GST at 10%, and rent while you build is shown as its own line so you can see the true cost of the year out of the house.

What it cannot know is your soil and your survey. Those two documents, about $7,000 between them, are the difference between this range and a fixed price. We run both before we quote. If the numbers here look workable, that is the next step, and the knock down rebuild cost guide walks through every line in more depth.