Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Living room with a crystal chandelier, a linear fireplace and wide glass doors to a covered terrace at Smart Street, a duplex designed and built by Buildana

North Narrabeen 2101 · Northern Beaches Council

North Narrabeen Builder

Design and construct means one person answers for the drawings, the approval and the build.

A new home in North Narrabeen goes to Northern Beaches Council with a full package: a survey, drawings, reports and a cost estimate. With design and construct, the person preparing that package is the person who will build the house. Here's what council asks for, and what a flood check near the lagoon can change.

Council
Northern Beaches (Narrabeen Ward)
Lagoon flood study
Narrabeen Lagoon Flood Study, 2013
New home, brick veneer, medium finish
$2,820–$3,040/m²
New home, brick veneer, high finish
$3,940–$4,250/m²

Short answer

How does design and construct work for a new home in North Narrabeen?

One contract covers the design, the approval and the build. I start with the planning certificate and a survey, check flood mapping if the lot is near Narrabeen Lagoon, then develop the design with a price at each stage. The application goes to council or a certifier with the reports it needs, and the same builder delivers the home.

Written and reviewed by

Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana

Fact-checked

One contract, priced as it's drawn

With design and construct, the brief, the concept, the approval drawings and the construction sit under one contract with one builder. Each stage is priced before the next begins, so the drawings never get ahead of the budget.

The other route, drawings first and a builder's price at the end, can work well. Its risk is finding out the cost after you've paid for a design council has approved. Where a flood level or the ground adds cost, that risk is bigger.

Each stage is priced before the next one starts.

What Northern Beaches Council asks for with a DA

Council's lodgement requirements for most development applications include a statement of environmental effects, a boundary identification survey, a full set of architectural plans, and the technical reports that apply to the site or the proposal, such as flooding, geotechnical, bushfire, arborist and BASIX.

Council also needs an estimated development cost. Above a set value, it has to be completed by a building industry professional, such as an architect, designer or registered builder, and on the largest jobs a quantity surveyor's report can be used instead. In design and construct, that estimate comes from the person who will build it.

Once accepted, an application is generally exhibited for 14 days, or 21 or 28 days for some proposals, and neighbours can make submissions. Then a DA has a 40-day assessment period. If the design meets the State's complying development standards instead, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise).

  • Statement of environmental effects
  • Boundary identification survey and architectural plans
  • Reports that apply: flooding, geotechnical, bushfire, arborist, BASIX
  • Estimated development cost from a building professional

Building in North Narrabeen?

Send the address and a few lines on what you'd like to build. Oliver will respond within 4 working hours for a free initial conversation.

0476 300 300

No obligation. We only use your details to respond to this enquiry.

Flood mapping near Narrabeen Lagoon

The Narrabeen Lagoon Flood Study, prepared in 2013 for the former Warringah and Pittwater councils and now held by Northern Beaches Council, models flood levels, depths and hazard across the lagoon catchment. The planning certificate says whether your lot is flood affected. If it is, ask council for the flood information for the property before the design starts.

A flood planning level can set the height of habitable floors, which changes the entry, the stairs and the way the garden meets the house. In design and construct, that's priced into the first concept, not discovered at approval.

Which local plan applies depends on the former council area your lot was in. The section 10.7 planning certificate names it, along with the zoning and any bushfire mapping.

What a design and construct home costs

Rawlinsons gives $2,820–$3,040/m² for a medium-finish brick veneer individual house in Sydney and $3,940–$4,250/m² at a high finish, excluding GST, escalated to the ABS September 2026 index. Demolition, site works, a raised floor where a flood level needs one, and landscaping sit on top. For the build itself, the ABS average build for a new NSW house was 2.99 quarters in 2025-26.

Every new home also needs a BASIX certificate, and since 1 October 2023 that means a 7-star NatHERS minimum for the thermal performance of the design.

What I check first in North Narrabeen

These shape the first concept and its price.

  1. 01

    Flood mapping and any flood planning level

  2. 02

    Which LEP and DCP apply, from the planning certificate

  3. 03

    Bush fire prone land mapping

  4. 04

    A boundary identification and detail survey

  5. 05

    Trees that need an arborist's report

  6. 06

    Whether the design can go as complying development

Design and construct in North Narrabeen

Are you a builder in North Narrabeen?

Buildana builds across Sydney from a studio in Fairfield, including the Northern Beaches. Oliver Alameri is the licensed builder, NSW contractor licence 487805C, with more than 15 years' building experience.

Do you prepare the DA?

Under design and construct, yes. The drawings, the consultants' reports and the lodgement are part of the one contract, coordinated by the builder who will build the home.

Is my lot flood affected?

The section 10.7 planning certificate says. If it is, council's flood information for the property sets the levels the design has to meet.

What does a design and construct home cost?

The published Sydney rate for a medium-finish brick veneer house is $2,820–$3,040/m², excluding GST. The design, the lot and your selections move it from there, and design and approval fees are set out in the contract. I don't give a fixed price from a first conversation.

Start with the lot

Tell me the address and what you'd like to build. Oliver will respond within 4 working hours for a free initial conversation.