Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Contemporary custom home facade
Spit Junction 2088 · Mosman

Spit Junction Home Builder — Custom Homes, KDR, Duplex

Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · Mosman DA and CDC pathways

Heritage Conservation Areas cover several side streets. Sandstone soil on the ridge.

Around Mosman Square and Spit Junction shops, Spit Junction lots vary street by street. Mosman Municipal sets the local controls; the state codes decide whether a design can go the complying development route.

Council

Mosman Municipal

Postcode

2088

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

DA assessment period

40 days (statutory)

Duplex minimum lot

Check the LEP

Low and Mid-Rise areas

1 nominated

Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.

Builder perspective

Building in Spit Junction: what gets checked first

Spit Junction (2088) is in the Mosman local government area, so Mosman Council sets the local planning controls and assesses any development application. Mosman Municipal runs the planning, and under NSW law a DA has a 40-day assessment period. That is a deadline for a decision, not a promise. A knockdown rebuild, an extension or a granny flat each suit a different lot; which one fits Spit Junction depends on the house that's there now and what the planning certificate allows. Site costs are the part of a budget no desktop estimate can settle: soil, slope, trees, stormwater and services are each confirmed by the engineer, surveyor, arborist or authority responsible. Every Buildana job runs on a written contract with an inclusions schedule, priced once plans, engineering and site checks are done. The right first step on a Spit Junction site is a feasibility, not a quote: the lot decides what makes sense.

OA

Oliver Alameri — Founder & licensed builder

Licence 487805C · 15+ years' building experience

Talk to Oliver

Spit Junction build context

What's known for Spit Junction, and the document that confirms each lot-specific fact before a price.

Council

Mosman Council

Postcode

2088

Nearest station

North Sydney

Local landmark

Mosman Square & Spit Junction shops

Zoning

Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer

Lot area and frontage

Title plan, or a detail survey

Site classification (AS 2870)

Geotechnical report for the lot

Age of the house

Built before 1990? Asbestos inspection before demolition

Duplex minimum lot

Lot size map in the council's LEP

Low and Mid-Rise area

Spit Junction town centre (Military Road and Spit Road) (800m walk applies)

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

Why owners build with Buildana in Spit Junction

What every Buildana job includes, written down.

  • Licensed NSW builder (licence 487805C): the price comes as a written contract with an inclusions schedule, after plans, engineering and site checks.
  • Mosman Municipal pathway explained plainly: a CDC from a certifier or the council if the design complies, a DA if it doesn't.
  • One point of contact: Oliver sequences the survey, geotechnical report, engineering and BASIX so each informs the next.
  • If the house was built before 1990, an asbestos inspection comes before demolition, and removal is by a SafeWork NSW licensed contractor.
  • Changes to the scope are agreed in writing before the work is done, as NSW home building law requires.
  • Anchored on the amanah principle: keeping the word given. Local landmark: Mosman Square & Spit Junction shops. Nearest station: North Sydney.

Spit Junction build costs from published rates

Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a Spit Junction lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.

Build typePublished rateBasis
Custom home, per m²$2,820–$4,250/m² + GSTRawlinsons individual house, brick veneer, medium to high finish.
Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²)single storey $565k–$980k + GST, double storey $735k–$1.27M + GSTAt $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra.
Duplex, attached four-bedroom pair$1.4M–$1.7M + GSTBoth dwellings, before site costs and subdivision.
Ground-floor addition, per m²$2,360–$2,840/m² + GSTRawlinsons ground floor addition, framed to brick veneer.
First-floor addition, per m²$3,790–$4,230/m² + GSTRawlinsons full first floor addition.
New bathroom in an addition$34k–$38k + GSTRawlinsons bathroom fit-out and services, each.
New kitchen in an addition$28k–$32k + GSTRawlinsons kitchen fit-out and services, each.
Granny flatFrom the catalogue price of the design you choose, plus site costsCatalogue designs carry their own published price.

Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.

Free Spit Junction feasibility

Thinking about building in Spit Junction? Start with the lot, not a sales pitch.

Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.

Written contract with an inclusions schedule Licence 487805C Mosman Municipal DA and CDC pathways explained

Buildana services in Spit Junction

Six services across Mosman, each priced for the lot once plans, engineering and site checks are done.

Knockdown Rebuild

One builder from demolition to handover: the old house out, footings designed for the site classification, the new house built and certified.

Spit Junction knockdown rebuild approach

Duplex

Attached or detached duplexes where the lot meets the council's minimum or the state's Low and Mid-Rise standards, checked before design.

Spit Junction duplex approach

Granny Flat

Granny flat designs come from a priced catalogue, so the design's cost is known before site costs are added.

Spit Junction granny flat approach

Custom Home

From sketch to handover: design, engineering, approval and build with one builder accountable.

Spit Junction custom home approach

Extension

Adding to an existing home is harder than starting fresh, so the structure is checked before a price is written.

Spit Junction extension approach

Renovation

Kitchens, bathrooms and whole-house renovations with an itemised scope and a written contract.

Spit Junction renovation approach

Approval pathway in Spit Junction

Council: Mosman Council.

In Spit Junction, the approval pathway depends on whether the design meets every standard of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008. If it does, a complying development certificate (CDC) can come from Mosman Municipal or a private certifier: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). If it doesn't, the design goes to Mosman Municipal as a development application (DA): a DA has a 40-day assessment period. Both are deadlines for a decision; missing information, referrals and design changes add time.

CDC pathway

Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.

DA pathway

Mosman Municipal merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.

Local duplex minimum

Check Mosman Council's local environmental plan and its lot size maps for the lot.

As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).

Low and Mid-Rise areas in Mosman

Spit Junction town centre (Military Road and Spit Road). Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). Spit Junction town centre (Military Road and Spit Road) is on the list; whether a Spit Junction lot is within an 800m walk of it is measured for each lot. Council rules compared

Granny flats

Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to Mosman Municipal as a DA.

Spit Junction site considerations

Stormwater is set by Mosman Municipal's requirements and designed by a civil or hydraulic engineer; tree removal or protection by Mosman Municipal's tree controls and an arborist's report; access and crane needs by the street itself. None of these is a suburb-wide number, so each is checked for the Spit Junction lot.

Soil & footings

A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.

Demolition & asbestos

A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.

Flood, bushfire & heritage

These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.

What to check for a Spit Junction lot, and where

  • Zoning, height, floor space ratio and lot size. The zone decides what can be built; the height, floor space ratio and lot size maps set the numbers for the lot. NSW Planning Portal Spatial Viewer
  • Setbacks, landscaping, parking and design. These sit in the council's development control plan, which a DA is assessed against. Development control plan, Mosman Council
  • Flooding. Whether the lot is flood affected, and which floor level or design controls follow. The lot's planning certificate records it too. Flood information, Mosman Council
  • Bush fire prone land. Whether the lot is mapped bush fire prone, which brings a bush fire assessment and construction standards. NSW Rural Fire Service
  • Heritage. Heritage items and conservation areas, listed in Schedule 5 of the council's local environmental plan. NSW heritage databases
  • Low and Mid-Rise exclusions. Lots inside a nominated area can still be excluded, for example by hazards or heritage. NSW Planning, Low and Mid-Rise exclusions
  • Development contributions. Section 7.11 or 7.12 contributions depend on the council's plan, the location and the proposal. Contributions plans, Mosman Council
  • Application fees and timing. Each council publishes its application fees in its fees and charges, and tracks its own applications online. Fees and charges, Mosman Council

Spit Junction build FAQs

The questions that come up most often on a first Spit Junction site walk.

Can I build a duplex in Spit Junction?
The local minimum lot size for a duplex is set in Mosman Council's local environmental plan; the lot size map for the address shows it. As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. Spit Junction town centre (Military Road and Spit Road) is one of those areas. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
What's the granny flat pathway in Spit Junction?
Secondary dwellings in Spit Junction are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with Mosman Municipal. The title, overlays and current controls are checked with the certifier or Mosman Municipal before design.
What soil class is typical in Spit Junction?
There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
What does it cost to knock down and rebuild in Spit Junction?
For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
Do you do extensions and renovations in Spit Junction?
Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.
How long does a DA take with Mosman Municipal?
NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through Mosman Municipal or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in Mosman Municipal's fees and charges.
What decides the site costs on a Spit Junction block?
The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by Mosman Municipal's tree controls and an arborist, stormwater by Mosman Municipal's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.
How long does a custom home build take in Spit Junction?
The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a Spit Junction timeline is set once the design and the approval pathway are known.

Nearby Mosman suburbs we build in

Other Mosman suburbs, assessed by the same council: Mosman Council.

Ready to talk about your Spit Junction build?

Oliver will respond within 4 working hours for a free initial conversation about your Spit Junction site, the Mosman Municipal pathway and what it could cost to build.