
Bondi Beach 2026 · Waverley Council
Home Builders Bondi Beach
A new home near the surf is built for the salt air, the street and the lot size as much as for the view.
A new home in Bondi Beach is a coastal job. Waverley Council's heritage controls cover the beachfront, most of Campbell Parade and part of Military Road, and the State's fast-track rules only open up on lots of at least 200m² and 6m wide. Here's how I'd approach it, and how to choose whoever builds it.
Short answer
What do I need to know before building a home in Bondi Beach?
Check three things on the planning certificate: whether the lot is in a heritage conservation area, whether it's in the coastal zone, and the zoning. Then check the lot size, because complying development under the Housing Code needs at least 200m² and 6m width. Most other cases go to Waverley Council as a development application, so plan the design and timing around that.
Written and reviewed by Oliver Alameri
Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana
Fact-checked
The Bondi Beach Conservation Area
Waverley Council's Bondi Beach Conservation Area takes in the crescent of the beach, most of Campbell Parade, part of Military Road and the buildings on those streets, and extends onto parts of the north and south headlands. Waverley has other conservation areas too, and individually listed heritage items inside and outside them.
In or next to a conservation area, a new home is assessed on how it fits the street's form, scale, materials and siting, not only on its own design. That suits a considered, architectural house. It doesn't suit a design that ignores its neighbours.
Near the beach, the street is part of the design brief.
Small lots and the approval route
Complying development under the State's Housing Code is only available for one- and two-storey homes on lots of at least 200m² and 6m wide in the R1 to R4 and RU5 zones, and it has its own heritage and hazard exclusions. A smaller or narrower lot, or one inside a conservation area, generally means a development application to Waverley Council.
A DA has a 40-day assessment period. Shadow diagrams, privacy and the neighbours' views often take the most work on a tight site, so they belong in the first design, not the response to objections.
- Lot area and width against the Housing Code
- Conservation area and heritage items nearby
- Coastal zone mapping on the planning certificate
Planning a new home in Bondi Beach?
Send the address, and the architect's drawings if you have them. Oliver will respond within 4 working hours for a free initial conversation.
0476 300 300Building for the coast
Land near the ocean can be mapped in the coastal zone under the State's Resilience and Hazards SEPP, which adds matters council must consider. The planning certificate shows whether your lot is affected.
Close to the surf, salt is a design input. Fixings, flashings, window hardware, balustrades and exposed metal need a grade suited to the site's exposure, and the engineer and suppliers set it. Choosing them once costs less than replacing them in a few years.

Choosing a builder for an architectural home
There isn't a best builder, only the right one for your design and site. Ask any builder for their licence number and check it on Service NSW's licence check. Buildana's NSW contractor licence is 487805C.
Residential building work over $5,000 needs a written contract. For work of $20,000 or more including GST, the builder must have home building compensation cover before taking money or starting work, and you can confirm it on Service NSW's HBC Check. The deposit is capped at 10%. A builder who wants more up front, or won't put it in writing, has answered your question.
What the house costs
Rawlinsons gives $3,940–$4,250/m² for a high-finish brick veneer individual house in Sydney and $5,200–$5,600/m² for a prestige full-brick house with partial air-conditioning, excluding GST, escalated to the ABS September 2026 index. Demolition, shoring next to neighbours, coastal-grade materials and street access sit on top. For the build itself, the ABS average build for a new NSW house was 2.99 quarters in 2025-26.
What I check first in Bondi Beach
On a small coastal lot, these decide the design.
- 01
Conservation area and heritage items, on the lot and nearby
- 02
Lot area and width against the Housing Code
- 03
Coastal zone and other hazards on the planning certificate
- 04
Shared walls, boundary walls and the neighbours' footings
- 05
Where a skip, deliveries and trades can go on the street
- 06
Restrictions on the title under section 88B
Building in Bondi Beach
Do you build custom homes in Bondi Beach?
Yes. Buildana builds across Sydney from a studio in Fairfield, including the Eastern Suburbs. Send the address and I'll tell you plainly whether it's a job I'd take on.
Can I use complying development on a small Bondi Beach lot?
Only if the lot is at least 200m² and 6m wide, in a residential zone the Housing Code covers, and not excluded by heritage or hazards. Otherwise it's a development application to Waverley Council.
Is my street in the Bondi Beach Conservation Area?
The section 10.7 planning certificate tells you, and Waverley's planning maps show conservation areas and heritage items for an address.
Can you build an architect's design?
Send the drawings. I'll read them as a builder and tell you what's missing before they can be priced properly. I don't give a fixed price from a first conversation.
Sources and references
Costs are from the Rawlinsons handbook with the local cost index applied; rules and timeframes are checked against the sources below.
- Waverley Council
- Rawlinsons Australian Construction Handbook, Rawlhouse Publishing
- Environmental Planning and Assessment Act 1979 (NSW)
- State Environmental Planning Policy (Exempt and Complying Development Codes) 2008
- Home Building Act 1989 (NSW)
- Search heritage databases, NSW Environment and Heritage
- NSW Planning Portal Spatial Viewer (zoning, FSR and hazard maps)
- State Environmental Planning Policy (Resilience and Hazards) 2021
- Coastal Management Act 2016 (NSW)
- Licence check, Verify NSW (Service NSW)
- HBCF: what am I covered for?, icare NSW
- HBCF Certificates Register, Verify NSW
Start with the lot
Tell me the address and what you'd like to build. Oliver will respond within 4 working hours for a free initial conversation.