We’re here to make it feel like home

Open living and dining room with a fireplace, a dropped circular ceiling, high windows and wide doors to a covered terrace at Smart Street, a duplex designed and built by Buildana

Kensington 2033 · Randwick City Council

Custom Home Builders Kensington

In Kensington, the rules a new house is judged by depend on the day the DA is lodged.

Randwick City Council has updated both of its main planning documents. The updated LEP started on 1 September 2023 and the DCP's Stage 2 Review on 27 July 2026. If you're planning a new home in Kensington, the lodgement date decides which rules apply, so the design and the paperwork need to be timed together.

Council
Randwick City
Local plans
Randwick LEP 2012 and Randwick DCP
New home, brick veneer, medium finish
$2,820–$3,040/m²
New home, full brick, medium finish
$2,940–$3,170/m²

Short answer

Which planning rules apply to a new home in Kensington?

The Randwick LEP 2012, as updated on 1 September 2023, applies to any DA lodged on or after that date. The Randwick DCP Stage 2 Review started on 27 July 2026; DAs lodged before then and not yet decided are assessed under the earlier DCP. The planning certificate shows zoning, heritage and other controls, including whether the lot is in a conservation area.

Written and reviewed by

Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana

Fact-checked

Two dates that decide the rules

The Randwick Local Environmental Plan 2012 commenced on 15 February 2013. A comprehensive amendment was notified on 18 August 2023 and started on 1 September 2023. Council says any DA lodged, meaning submitted with fees paid, on or after that date is assessed against the updated LEP.

The development control plan changed more recently. The Randwick DCP Stage 2 Review started on 27 July 2026. A DA lodged before then and not yet decided is assessed as if the review hadn't started, except for applications relying on the affordable housing, co-living or low and mid-rise housing provisions of the State's Housing SEPP. If your design was drawn before July 2026 and hasn't been lodged, check it against the new DCP first.

Lodge on the right side of the date, with a design drawn for the rules on that side.

The parts of the DCP a house is assessed against

The reviewed DCP is organised in parts. Part B holds the general controls, including local character areas, heritage, sustainability and resilience, landscaping and biodiversity, tree preservation and water management. Part C1 covers low density residential development. Part D1 has location-specific controls for Kensington and Kingsford.

Not every part applies to every lot. Which ones apply to yours depends on the zoning, the mapping and what you're building. I read them against the survey before the design is fixed, because a tree, a character area or a stormwater requirement can move the house on the lot.

  • Part B: character, heritage, trees and water
  • Part C1: low density residential
  • Part D1: Kensington and Kingsford

Building in Kensington?

Send the address and any drawings you already have. Oliver will respond within 4 working hours for a free initial conversation.

0476 300 300

No obligation. We only use your details to respond to this enquiry.

West Kensington and other heritage checks

Randwick City Council lists West Kensington among its heritage conservation areas and publishes a map and statement of significance for each one. Council describes a conservation area's values as things like its historical origins, subdivision pattern, consistent building materials or the common age of its buildings. A new home inside one is designed to respect them.

Demolishing a building in a heritage conservation area needs development consent under the LEP's heritage clause. Complying development generally can't be used in a conservation area, except for a detached outbuilding or a swimming pool, so a new house there goes to council as a DA, and a DA has a 40-day assessment period. Outside one, check for nearby heritage items too, and whether the DCP's Sydney Airport part or any flood controls apply to the lot.

Rebuilding on a Kensington lot

If there's a house on the lot now, its demolition is normally approved with the new home. An older house needs an asbestos check before it comes down, and any asbestos is removed by a licensed removalist.

Rawlinsons gives $2,820–$3,040/m² for a medium-finish brick veneer individual house in Sydney and $2,940–$3,170/m² in full brick, excluding GST, escalated to the ABS September 2026 index. Demolition, asbestos removal, site works and services sit on top. For the build itself, the ABS average build for a new NSW house was 2.99 quarters in 2025-26.

What I check first in Kensington

Before any design work, these decide which rules apply and how.

  1. 01

    When the DA will be lodged, against the LEP and DCP start dates

  2. 02

    Heritage items and the West Kensington conservation area map

  3. 03

    Which DCP parts apply to the lot

  4. 04

    Trees protected under the DCP

  5. 05

    Sydney Airport and flood controls that may apply

  6. 06

    Asbestos in the existing house before demolition

Custom homes in Kensington

Do you build custom homes in Kensington?

Yes. Buildana builds one-off homes and rebuilds across Sydney from a studio in Fairfield, including Randwick City. Oliver Alameri is the licensed builder, NSW contractor licence 487805C. Send the address and I'll tell you plainly what the lot allows.

My drawings were done before 27 July 2026. Which DCP applies?

If the DA was lodged before that date and hasn't been decided, council assesses it as if the Stage 2 Review hadn't started. If it hasn't been lodged yet, the reviewed DCP applies, so check the design against it before lodging.

Can I use complying development in West Kensington?

Generally not for a new house. Complying development can't usually be carried out in a heritage conservation area, except for a detached outbuilding or a swimming pool, so the house goes to council as a DA.

What does a custom home cost in Kensington?

The published Sydney rate for a medium-finish brick veneer house is $2,820–$3,040/m², excluding GST. The design, the lot and your selections move it from there. I don't give a fixed price from a first conversation.

Start with the dates and the lot

Tell me the address and what you'd like to build. Oliver will respond within 4 working hours for a free initial conversation.