
Five Dock 2046 · City of Canada Bay
New Homes in Five Dock, Designed and Built
One contract from the first sketch to the keys. That's design and build in Five Dock.
Design and build puts the design, engineering, approval and construction of your new Five Dock home with one builder. You deal with Oliver from the first site visit, so buildability and cost are checked while the drawings are still changing, not after they're finished.
Short answer
What does design and build mean for a new home in Five Dock?
One builder takes the home from brief to handover: survey, design, engineering, approval and construction. In Five Dock, approval is complying development through a certifier where the lot and design meet the Housing Code, or a development application to the City of Canada Bay. Near Five Dock town centre, Low and Mid-Rise rules may also allow two homes instead of one.
Written and reviewed by Oliver Alameri
Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana
Fact-checked
How design and build runs
With separate designers and builders, you often find out what the drawings cost only when they go to tender. With design and build, the builder is at the table from the start, so the layout, structure and finishes are checked against the budget at each stage.
It also means one point of responsibility. If something in the design doesn't work on site, it's my problem to solve, not something passed between a designer and a builder.
- Site visit, brief and budget
- Detail survey and section 10.7 planning certificate
- Concept design, then design development
- Engineering, BASIX and approval drawings
- CDC or DA, then construction drawings
- Written contract, HBC cover, then the build
The cheapest time to change a design is before it's approved.
One home or two near Five Dock town centre
Five Dock town centre is one of the NSW Government's Low and Mid-Rise Housing areas. Since 28 February 2025, residential land within 800m walking distance of a listed area gets State standards for dual occupancies: a lot of at least 450m² and 12m wide, a floor space ratio of 0.65:1 and a height of 9.5m.
So on some Five Dock lots, the first design question is whether you build one home or a pair. Heritage, flood and other exclusions still apply lot by lot, and walking distance isn't the same as a straight line on a map. I check both before you commit to either.

Planning a new home in Five Dock?
Send the address and a rough brief. Oliver will respond within 4 working hours for a free initial conversation.
0476 300 300What the certificate decides
The section 10.7 planning certificate for your lot shows its zoning, whether it's a heritage item or in a heritage conservation area, and any flood or other mapping. It decides which approval path is open before any design is drawn.
The Housing Code applies to one- and two-storey homes on lots in the R1, R2, R3, R4 and RU5 zones of at least 200m² and 6m wide. A design that meets every standard can go through a private certifier, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). Anything outside the code goes to the City of Canada Bay as a DA, and a DA has a 40-day assessment period.
What it costs to build
Rawlinsons gives $2,820–$3,040/m² for a medium-finish brick veneer individual house in Sydney and $3,940–$4,250/m² at a high finish, excluding GST, escalated to the ABS September 2026 index. Design fees, approvals, demolition and site works sit on top and depend on the lot.
Your deposit is capped at 10%, and for work of $20,000 or more including GST you get home building compensation cover before any money is taken. For the build itself, the ABS average build for a new NSW house was 2.99 quarters in 2025-26.
What I check first for a new Five Dock home
These shape the design before a line is drawn.
- 01
Zoning, heritage and flood on the planning certificate
- 02
Walking distance to Five Dock town centre
- 03
Lot width and area against the Housing Code
- 04
Whether one home or two suits the lot and your plans
- 05
Levels, trees and neighbours from the detail survey
- 06
Restrictions on the title under section 88B
New homes in Five Dock
Is design and build the same as design and construct?
In practice, yes. Both mean one builder is responsible for the design and the construction under one contract. Our design and construct page explains how we run it.
Can I build two homes instead of one in Five Dock?
Possibly. Within 800m walking distance of Five Dock town centre, the State's dual occupancy standards apply. Elsewhere, the council's own minimum lot size applies. Exclusions apply lot by lot, so check the certificate first.
There's an old house on my lot. Where do I start?
With the same design and approval, because demolition is normally approved together with the new home. Our Five Dock knockdown rebuild page covers the demolition side in detail.
Do I need a CDC or a DA?
A CDC if the lot and design meet every Housing Code standard; otherwise a DA to the City of Canada Bay. A heritage listing or conservation area usually means a DA.
Sources and references
Costs are from the Rawlinsons handbook with the local cost index applied; rules and timeframes are checked against the sources below.
- City of Canada Bay
- Rawlinsons Australian Construction Handbook, Rawlhouse Publishing
- Environmental Planning and Assessment Act 1979 (NSW)
- State Environmental Planning Policy (Exempt and Complying Development Codes) 2008
- BASIX, NSW Planning Portal
- Home Building Act 1989 (NSW)
- Search heritage databases, NSW Environment and Heritage
- NSW Planning Portal Spatial Viewer (zoning, FSR and hazard maps)
- Low and Mid-Rise Housing areas, NSW Planning
- HBCF: what am I covered for?, icare NSW
One builder, start to finish
Tell me about the lot and the home you want. Oliver will respond within 4 working hours for a free initial conversation.