Skip to content

We’re here to make it feel like home

Buildana construction project in Western Sydney

Home Extension Builder Mascot — Approved in 60 Days

Mascot 2020 extensions with tight approval timelines. CDC where eligible (~15 days), DA via Bayside Council in 40–60 days. Construction 12–24 weeks depending on scope.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

A home extension in Mascot costs $150,000–$600,000+. Rear extension from $150K, second-storey addition from $300K. Buildana manages design, Bayside Council approvals, and construction under one fixed-price contract.

Mascot Home Extensions — Fixed Price

A home extension in Mascot lives or dies on the acoustics. This close to the runway, the highest-value line in the whole scope is not the glazing package for looks — it is the engineered glass, seals and insulation that turn the interior into a genuinely quiet room under the approach.

Near the station the R4 precinct carries tower value, so I check the zoning before any wing, and the post-war fabric gets the asbestos check with the reclaimed sands read before excavation.

At a $1.5M to $2.3M median the wing on the quieter brick streets is well-priced space this close to the airport and the CBD.

We build these fixed-price, licence HBL 487805C. Get our extension scope, with zoning and acoustics resolved, before you commit.

Buildana manages the complete home extension process in Mascot — from design consultation and structural engineering through to DA or CDC approval, and fixed-price construction to handover. Extend your home without the stress.

Read our Home Extension Cost Guide 2026 or explore extension approval pathways in NSW.

  • Home extensions in Mascot from $150K
  • Bayside Council DA and CDC approvals managed
  • Ground floor, rear and second-storey additions
  • M — structural engineering included
  • 1940s–1970s + apartment towers-era homes assessed for extension suitability
  • Connect new to existing — clean, matched finish
  • 6-year structural warranty
  • Free design consultation — near Mascot (T8, in suburb) station
Mascot home extension — matched connection to existing dwelling
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010

Engineer the quiet first

Under the approach the sound is the design problem, so the acoustic package leads the scope — engineered glazing and sealing that make the inside a different world to the outside.

The airport-and-CBD position keeps demand for the finished home real.

Zoning, era and sands

Near the station the R4 tower value gets checked before the wing, so the spend is not stranded under redevelopment territory.

The post-war fabric gets the asbestos check and the sands are read before excavation — all costed up front.

Home extension builder in Mascot — key facts

Suburb
Mascot, NSW 2020
Council / LGA
Bayside Council (Bayside)
Primary zoning
R2 Low
Typical lot size
300–600m²
Soil class
M
Median house price
$1.5M–$2.3M
Home era
1940s–1970s + apartment towers
Typical price range
$150,000 – $600,000+
Typical timeline
6–12 months design to handover
Approval pathway
CDC for most rear extensions, DA for second-storey

Want a real number for YOUR block — not a generic estimate?

Free site assessment, fixed-price contract, line-itemised quote within 48 hours. No high-pressure sales — just a real builder talking real numbers.

Cost Guide

ItemEstimated Range
Single-room addition (bedroom/study)$58,000 – $140,000
Kitchen/living extension$150,000 – $340,000
Master suite + ensuite addition$130,000 – $270,000
Second storey (full or partial)$270,000 – $530,000
Multi-room ground floor wrap$340,000 – $580,000

Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.

Existing structure assessment — Mascot homes of the 1940s–1970s + apartment towers
Extension design (ground floor, first floor, or wrap-around)
Structural engineering for tied-in load paths
Geotechnical assessment (Class M soil — Mascot)
BASIX for the extended total envelope
Bayside Council DA or CDC lodgement
Temporary weatherproofing during build
Full construction — tie-in through to fit-out
Matching or contrasting external finishes
Final inspection and Occupation Certificate

How It Works

From First Call to Final Key

We assess your Mascot home — existing structure, block size (300–600m²), R2 Low zoning, setbacks, FSR, and your space requirements. You'll know what's achievable before spending on detailed design.

Design phase covers the extension layout, junction with existing structure, window and door placement, and external finish to match your Mascot home's streetscape. Multiple design options presented.

Documentation pack covers structural engineering for the new footings sized to match existing depths on Class M soil, BASIX 2025 compliance, shadow diagrams to neighbours' POS, hydraulic, and detailed sections through the wall-tie junction. Approval-grade, not concept-grade.

Fixed-price construction of your extension. New footings engineered for Class M soil, structural connection to existing home, frame, fit-out, and finishes. Weekly updates from your project manager.

Handover documentation covers the new work specifically — OC for the extension, structural certs, BASIX certificate updates, and warranty for the new section plus the junction detailing. Existing house remains under whatever warranty position applied before.

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Add Space to Your Mascot Home

Free design consultation for Mascot 2020. We'll assess your home, design the extension, and provide a fixed-price quote.

Start Your Project