Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

Home Extensions & Additions Turrella — Live In, Build On

We extend homes across Turrella 2205, often while owners stay in place, working to Bayside Council's rules and keeping the house weathertight during the build.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Home extension build rates in Turrella: Ground floor $2,360–$2,840/m² + GST; first floor $3,790–$4,230/m² + GST (Rawlinsons Sydney). Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Buildana manages design, Bayside Council approvals and construction, with a fixed-price contract once design and scope are set.

Turrella Home Extensions & Additions

A home extension in Turrella is one of the better-value moves in the Wolli Creek pocket — inter-war and post-war homes on 400 to 650m² blocks against the valley green, where the wing opens toward the reserve and the entry pricing keeps the maths genuinely additive.

On the reserve-side lots the riparian setbacks shape the rear, acoustic design covers the overlays, and the older fabric gets licensed handling where we open it.

We build these under NSW contractor licence 487805C. Get our extension scope, with the setbacks mapped, before you commit.

Buildana manages the complete home extension process in Turrella — from design consultation and structural engineering through to DA or CDC approval, and construction to handover, with a fixed-price contract once design and scope are set. Extend your home without the stress.

Read our Home Extension Cost Guide 2026 or explore extension approval pathways in NSW.

  • Rawlinsons Sydney rates: ground floor $2,360–$2,840/m² + GST, first floor $3,790–$4,230/m² + GST
  • Bayside Council DA and CDC approvals managed
  • Ground floor, rear and second-storey additions
  • M — structural engineering included
  • 1930s–1970s-era homes assessed for extension suitability
  • Connect new to existing — clean, matched finish
  • 6-year structural warranty
  • Free design consultation — near Turrella (T4, in suburb) station
Extended family home in Turrella — R2 Low block
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

Value in the valley pocket

The Wolli Creek setting is the quiet asset, and the wing opens toward it — designed within the riparian setbacks on the reserve-side lots, with the station keeping daily life practical.

The lower entry price is what makes the addition punch above its cost here.

Sound and fabric handled

Acoustic design covers the flight-path overlays where they apply, drawn into the plan rather than bolted on.

The older fabric comes out under licence, all of it in the quote from the start.

Home extension builder in Turrella — key facts

Suburb
Turrella, NSW 2205
Council / LGA
Bayside Council (Bayside)
Primary zoning
R2 Low
Typical lot size
400–650m²
Soil class
M
Home era
1930s–1970s
Typical price range
Ground floor $2,360–$2,840/m² + GST; first floor $3,790–$4,230/m² + GST (Rawlinsons Sydney)
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period
Approval pathway
CDC for most rear extensions, DA for second-storey

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Cost Guide

ItemEstimated Range
Adding a master suite (1930s–1970s Turrella home)$2,360–$2,840/m² + GST
Ensuite for the new suite$37k–$42k inc GST
Second storey for teenagers/office$3,790–$4,230/m² + GST
Full rear + roof tie-in (entertainer's zone)Depends on roof tie-in and structure

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

Concept design first — you see the plan before committing
Bayside Council CDC for eligible ground-floor additions — a CDC must be decided within 20 days where neighbours are notified (10 days otherwise)
DA path for second-storey or non-complying designs — a DA has a 40-day assessment period
Construction programmed around liveability — staged weatherproofing
Second-storey works sequenced around the roof tie-in

How It Works

From First Call to Final Key

Walk through your Turrella home with our designer and structural engineer. We measure, photograph, and check the bones — footings, frame condition, roof structure.

⏱

Our designer works with your existing home's layout — connecting new living areas to existing rooms, matching materials and roof pitch, and maximising natural light. You approve floor plans and 3D renders before we proceed.

⏱

Most rear extensions in Turrella qualify for CDC — cleaner, faster, no neighbour notification. Second-storey additions typically need DA through Bayside Council because of overshadowing and privacy assessments.

⏱

Extension built from new footings to completion — connecting structurally to your existing home. Class M soil design managed.

⏱

Walk through the completed extension, confirm finishes, collect your OC. NSW statutory warranties apply to eligible residential work, including work at the junction with the existing home.

⏱

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Start a Turrella Home Extension

Free design consultation for Turrella 2205. We'll assess your home and talk through extension options and the approval pathway, then provide a fixed-price contract once design and scope are set.

Start Your Project