
Mount Kuring-gai Home Builder — Custom Homes, KDR, Duplex
Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · Hornsby DA and CDC pathways
Ku-ring-gai Chase National Park boundary east. Limited commercial; bus to Hornsby for shops.
Mount Kuring-gai shares Hornsby Shire's planning controls with Mount Colah and Berowra. What changes from lot to lot is zoning, area, frontage, slope and soil, and each is checked on paper before design.
Council
Hornsby Shire
Postcode
2080
Build rate (Rawlinsons)
$2,820–$4,250/m² + GST
DA assessment period
40 days (statutory)
Duplex minimum lot
Check the LEP
Low and Mid-Rise areas
5 nominated
Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.
Builder perspective
Building in Mount Kuring-gai: what gets checked first
Mount Kuring-gai is small, bush-wrapped and serious about fire — a builder in Mount Kuring-gai treats the BAL rating as the master control on almost every job. That's the top end of the bushfire scale, and it changes what a house can be made of.
Hawkesbury Sandstone underneath adds rock excavation to price at survey. The reward is space and privacy on big blocks that suit a proper rebuild or a well-sited granny flat. There's no train-side density story here; it's about building safely and well in the bush. We start with the RFS assessment, because everything else follows it.
Oliver Alameri — Founder & licensed builder
Licence 487805C · 15+ years' building experience
Mount Kuring-gai build context
What's known for Mount Kuring-gai, and the document that confirms each lot-specific fact before a price.
Council
Hornsby Shire Council
Postcode
2080
Nearest station
Mount Kuring-gai
Local landmark
Mount Kuring-gai shops + Ku-ring-gai Chase NP + Mount Kuring-gai Public School
Zoning
Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer
Lot area and frontage
Title plan, or a detail survey
Site classification (AS 2870)
Geotechnical report for the lot
Age of the house
Built before 1990? Asbestos inspection before demolition
Duplex minimum lot
Lot size map in the council's LEP
Low and Mid-Rise area
Walking distance to a nominated area, measured for the lot
Build rate (Rawlinsons)
$2,820–$4,250/m² + GST
Why owners build with Buildana in Mount Kuring-gai
What every Buildana job includes, written down.
- Licence 487805C, home building compensation cover where the law requires it, and a written contract with an inclusions schedule.
- Hornsby Shire rules are read before design: a CDC where the design meets every code standard, a DA where it needs merit assessment.
- Oliver coordinates the surveyor, geotechnical and structural engineers, BASIX assessor and certifier, so the documents arrive in the right order.
- Asbestos is identified before demolition, not discovered during it: pre-1990 houses are inspected and licensed removalists do the work.
- Build rates come from the Rawlinsons construction handbook, escalated with the ABS house construction price index, not a guess.
- Anchored on the amanah principle: keeping the word given. Local landmark: Mount Kuring-gai shops + Ku-ring-gai Chase NP + Mount Kuring-gai Public School. Nearest station: Mount Kuring-gai.
Mount Kuring-gai build costs from published rates
Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a Mount Kuring-gai lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.
| Build type | Published rate | Basis |
|---|---|---|
| Custom home, per m² | $2,820–$4,250/m² + GST | Rawlinsons individual house, brick veneer, medium to high finish. |
| Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²) | single storey $565k–$980k + GST, double storey $735k–$1.27M + GST | At $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra. |
| Duplex, attached four-bedroom pair | $1.4M–$1.7M + GST | Both dwellings, before site costs and subdivision. |
| Ground-floor addition, per m² | $2,360–$2,840/m² + GST | Rawlinsons ground floor addition, framed to brick veneer. |
| First-floor addition, per m² | $3,790–$4,230/m² + GST | Rawlinsons full first floor addition. |
| New bathroom in an addition | $34k–$38k + GST | Rawlinsons bathroom fit-out and services, each. |
| New kitchen in an addition | $28k–$32k + GST | Rawlinsons kitchen fit-out and services, each. |
| Granny flat | From the catalogue price of the design you choose, plus site costs | Catalogue designs carry their own published price. |
Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.
Free Mount Kuring-gai feasibility
Thinking about building in Mount Kuring-gai? Start with the lot, not a sales pitch.
Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.
Buildana services in Mount Kuring-gai
Six services across Hornsby, each priced for the lot once plans, engineering and site checks are done.
Knockdown Rebuild
Demolition, asbestos removal by licensed contractors, a slab engineered to the geotechnical report, then the new house, under one written contract.
Mount Kuring-gai knockdown rebuild approachDuplex
Subdividing the finished pair is a separate question from the build, so it's checked against the council's rules before design.
Mount Kuring-gai duplex approachGranny Flat
If the lot and design meet Housing SEPP Schedule 1 the granny flat can be complying development; if not, it goes to the council as a DA.
Mount Kuring-gai granny flat approachCustom Home
Brief-first design: drawn to your block and budget, then engineered and approved.
Mount Kuring-gai custom home approachExtension
Rear and second-storey additions, with the existing slab, frame and roof investigated before pricing.
Mount Kuring-gai extension approachRenovation
Older homes renovated with care: original materials kept where they're worth keeping, replaced where they aren't.
Mount Kuring-gai renovation approachApproval pathway in Mount Kuring-gai
Council: Hornsby Shire Council.
For a Mount Kuring-gai rebuild, the pathway is worth settling before drafting starts. A CDC suits a design that meets every code standard on a lot the codes apply to; a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). A DA through Hornsby Shire lets the design flex; a DA has a 40-day assessment period. Neither clock includes design, engineering or the time to answer requests for more information.
CDC pathway
Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.
DA pathway
Hornsby Shire merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.
Local duplex minimum
Check Hornsby Shire Council's local environmental plan and its lot size maps for the lot.
As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).
Low and Mid-Rise areas in Hornsby
Asquith town centre, Hornsby station, Pennant Hills Market Place shopping centre, Thornleigh Marketplace shopping centre, Waitara station. Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). Council rules compared
Granny flats
Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to Hornsby Shire as a DA.
Mount Kuring-gai site considerations
Three things move a Mount Kuring-gai budget before the house itself: the ground (confirmed by a geotechnical report), the slope (confirmed by a detail survey) and the service connections (confirmed by Sydney Water and the electricity network). Each is priced once that document is in hand, not allowed for by guesswork.
Soil & footings
A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.
Demolition & asbestos
A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.
Flood, bushfire & heritage
These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.
What to check for a Mount Kuring-gai lot, and where
- Zoning, height, floor space ratio and lot size. The zone decides what can be built; the height, floor space ratio and lot size maps set the numbers for the lot. NSW Planning Portal Spatial Viewer
- Setbacks, landscaping, parking and design. These sit in the council's development control plan, which a DA is assessed against. Development control plan, Hornsby Shire Council
- Flooding. Whether the lot is flood affected, and which floor level or design controls follow. The lot's planning certificate records it too. Flood information, Hornsby Shire Council
- Bush fire prone land. Whether the lot is mapped bush fire prone, which brings a bush fire assessment and construction standards. NSW Rural Fire Service
- Heritage. Heritage items and conservation areas, listed in Schedule 5 of the council's local environmental plan. NSW heritage databases
- Low and Mid-Rise exclusions. Lots inside a nominated area can still be excluded, for example by hazards or heritage. NSW Planning, Low and Mid-Rise exclusions
- Development contributions. Section 7.11 or 7.12 contributions depend on the council's plan, the location and the proposal. Contributions plans, Hornsby Shire Council
- Application fees and timing. Each council publishes its application fees in its fees and charges, and tracks its own applications online. Fees and charges, Hornsby Shire Council
Built by Buildana
Smart Street and The Boulevarde
Buildana builds across Hornsby: single and double-storey homes, knockdown rebuilds, duplexes where the lot meets Hornsby Shire's minimums or the state's Low and Mid-Rise standards, and granny flats under the Housing SEPP. It starts with your Mount Kuring-gai site: title, zone, slope, frontage and soil. Then design, then a written price.

Smart Street
A two-storey duplex designed and built by Buildana, pairing a rendered upper floor with dark vertical cladding.

The Boulevarde
An attached two-storey duplex Buildana delivered from start to finish, with tall arched windows and timber-toned joinery.
Projects and case studies
See Smart Street and The Boulevarde, built by Buildana, and studies of other completed Sydney homes.
Read case studiesHornsby hub
Builder hub for Hornsby: every suburb, every service, council pathway notes.
Open Hornsby hubFree Mount Kuring-gai site check
Send your Mount Kuring-gai address: Oliver checks title, zone, slope, frontage and soil before you spend a dollar.
Book a site checkMount Kuring-gai build FAQs
The questions that come up most often on a first Mount Kuring-gai site walk.
- How long does a custom home build take in Mount Kuring-gai?
- The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a Mount Kuring-gai timeline is set once the design and the approval pathway are known.
- Can I build a duplex in Mount Kuring-gai?
- The local minimum lot size for a duplex is set in Hornsby Shire Council's local environmental plan; the lot size map for the address shows it. As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
- What's the granny flat pathway in Mount Kuring-gai?
- Secondary dwellings in Mount Kuring-gai are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with Hornsby Shire. The title, overlays and current controls are checked with the certifier or Hornsby Shire before design.
- What soil class is typical in Mount Kuring-gai?
- There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
- What does it cost to knock down and rebuild in Mount Kuring-gai?
- For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
- Do you do extensions and renovations in Mount Kuring-gai?
- Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.
- How long does a DA take with Hornsby Shire?
- NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through Hornsby Shire or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in Hornsby Shire's fees and charges.
- What decides the site costs on a Mount Kuring-gai block?
- The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by Hornsby Shire's tree controls and an arborist, stormwater by Hornsby Shire's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.
Nearby Hornsby suburbs we build in
Other Hornsby suburbs, assessed by the same council: Hornsby Shire Council.
Ready to talk about your Mount Kuring-gai build?
Oliver will respond within 4 working hours for a free initial conversation about your Mount Kuring-gai site, the Hornsby Shire pathway and what it could cost to build.