
Builder Greenwich, Lane Cove
Greenwich is the harbour-fall peninsula between Greenwich Point, Manns Point and Bay Road on Sydney Harbour. Federation mansions, inter-war heritage and contemporary harbour-fall builds on 500–1,200m² blocks. Heritage Conservation Areas cover most streets. Sandstone-dominant with substantial harbour fall. North Sydney LGA boundary east at Wollstonecraft. Greenwich ferry wharf. Premium for direct harbour outlook.
Council
Lane Cove
Median price
$3.5M–$8.0M
Typical lot
500–1,200m²
Soil class
M (sandstone ridges) / H–E (river fall)
Greenwich build context
- Council
- Lane Cove Council
- Postcode
- 2065
- Primary zoning
- R2 Low Density / R3 Medium (Lane Cove village)
- Typical lot size
- 500–1,200m²
- Predominant home era
- 1880s–1940s heritage
- Soil class
- M (sandstone ridges) / H–E (river fall)
- Duplex minimum lot
- 550m²
- Median price band
- $3.5M–$8.0M
- Granny flat rental
- $650–$900/week
Why owners build with Buildana in Greenwich
- Licensed NSW builder — registered HBL, full insurance, fixed-price contracts. Honest scope, no soft-start variations.
- Lane Cove Council approval pathway managed end-to-end — CDC where compliant, full DA where merit pathway is the right call.
- Engineering and approvals managed in-house — structural, BASIX, RFS where required, council referrals.
- Asbestos clearance handled by SafeWork NSW licensed contractors — pre-1990 fibro stock priced into the contract.
- Fixed-price contract from demolition through to handover — Rawlinsons-aligned costing, no surprise variations.
- Local landmark — Greenwich Wharf & Manns Point. Train: Wollstonecraft (1.5 km, ferry).
Buildana services in Greenwich
All six core services delivered across the Lane Cove — see the Greenwich build context reflected in each.
Knockdown Rebuild
Demolition, asbestos clearance, foundation engineering and construction under one fixed-price contract — managed end-to-end.
See Greenwich knockdown rebuild approachDuplex
Attached or detached duplex on R2/R3 lots that meet local DCP minimum lot size — twin-slab engineering and approvals managed.
See Greenwich duplex approachGranny Flat
SEPP ARH complying-development pathway — 60m² maximum, no DA on most compliant R2 lots, 4–6 month pre-construction window.
See Greenwich granny flat approachCustom Home
Architect-led design, contemporary or heritage-respectful detailing — sized to the streetscape and the brief, not a template.
See Greenwich custom home approachExtension
Rear and second-storey additions on established housing stock — structural integration and roof tie-ins costed honestly upfront.
See Greenwich extension approachRenovation
Full-house refresh, kitchens, bathrooms, exterior render and roof restoration — fixed-price scope from day one.
See Greenwich renovation approachNearby suburbs we build in
Adjacent Lane Cove suburbs covered by the same Lane Cove Council pathway.
Ready to talk about your Greenwich build?
Free site assessment, honest feasibility, fixed-price contract. Lane Cove site context priced upfront — no surprise variations.