Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Two-storey custom home, Sydney
St Marys 2760 · Penrith

St Marys Home Builder — Custom Homes, KDR, Duplex

Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · Penrith DA and CDC pathways

Older fibro/brick stock on side streets ripe for KDR. Industrial-legacy contamination overlays on the eastern edge.

NSW Planning has nominated 1 Low and Mid-Rise area in Penrith. Whether a St Marys lot can use the state's dual occupancy standards depends on its walking distance from one and on the exclusions.

Council

Penrith City

Postcode

2760

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

DA assessment period

40 days (statutory)

Duplex minimum lot

Check the LEP

Low and Mid-Rise areas

1 nominated

Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.

Builder perspective

Building in St Marys: what gets checked first

St Marys shares Penrith City's planning controls with Werrington and Colyton, but each lot still has to be read on its own. Penrith City is the consent authority for a DA; a DA has a 40-day assessment period, and requests for more information or referrals add time. A knockdown rebuild suits a house whose structure, layout or condition no longer justifies renovating; demolition, asbestos and site costs sit on top of the build price. The footing system comes from the geotechnical report: the engineer classifies the site under AS 2870 and the slab is designed to that class. Buildana was founded in 2025 by Oliver Alameri, a licensed builder (licence 487805C) with 15+ years' experience, and Oliver is the person you deal with from the first call to handover. The conversation that saves the most money on a St Marys project happens before design: planning controls, site checks and a cost range from published rates.

OA

Oliver Alameri — Founder & licensed builder

Licence 487805C · 15+ years' building experience

Talk to Oliver

St Marys build context

What's known for St Marys, and the document that confirms each lot-specific fact before a price.

Council

Penrith City Council

Postcode

2760

Nearest station

St Marys

Local landmark

St Marys Village + Queen Street + Western Sydney Airport rail (under construction)

Zoning

Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer

Lot area and frontage

Title plan, or a detail survey

Site classification (AS 2870)

Geotechnical report for the lot

Age of the house

Built before 1990? Asbestos inspection before demolition

Duplex minimum lot

Lot size map in the council's LEP

Low and Mid-Rise area

Walking distance to a nominated area, measured for the lot

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

Why owners build with Buildana in St Marys

What every Buildana job includes, written down.

  • Licensed NSW builder (licence 487805C): the price comes as a written contract with an inclusions schedule, after plans, engineering and site checks.
  • Penrith City pathway explained plainly: a CDC from a certifier or the council if the design complies, a DA if it doesn't.
  • Oliver coordinates the surveyor, geotechnical and structural engineers, BASIX assessor and certifier, so the documents arrive in the right order.
  • Asbestos is identified before demolition, not discovered during it: pre-1990 houses are inspected and licensed removalists do the work.
  • Build rates come from the Rawlinsons construction handbook, escalated with the ABS house construction price index, not a guess.
  • Anchored on the amanah principle: keeping the word given. Local landmark: St Marys Village + Queen Street + Western Sydney Airport rail (under construction). Nearest station: St Marys.

St Marys build costs from published rates

Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a St Marys lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.

Build typePublished rateBasis
Custom home, per m²$2,820–$4,250/m² + GSTRawlinsons individual house, brick veneer, medium to high finish.
Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²)single storey $565k–$980k + GST, double storey $735k–$1.27M + GSTAt $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra.
Duplex, attached four-bedroom pair$1.4M–$1.7M + GSTBoth dwellings, before site costs and subdivision.
Ground-floor addition, per m²$2,360–$2,840/m² + GSTRawlinsons ground floor addition, framed to brick veneer.
First-floor addition, per m²$3,790–$4,230/m² + GSTRawlinsons full first floor addition.
New bathroom in an addition$34k–$38k + GSTRawlinsons bathroom fit-out and services, each.
New kitchen in an addition$28k–$32k + GSTRawlinsons kitchen fit-out and services, each.
Granny flatFrom the catalogue price of the design you choose, plus site costsCatalogue designs carry their own published price.

Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.

Free St Marys feasibility

Thinking about building in St Marys? Start with the lot, not a sales pitch.

Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.

Written contract with an inclusions schedule Licence 487805C Penrith City DA and CDC pathways explained

Buildana services in St Marys

Six services across Penrith, each priced for the lot once plans, engineering and site checks are done.

Knockdown Rebuild

Demolition, asbestos removal by licensed contractors, a slab engineered to the geotechnical report, then the new house, under one written contract.

St Marys knockdown rebuild approach

Duplex

Subdividing the finished pair is a separate question from the build, so it's checked against the council's rules before design.

St Marys duplex approach

Granny Flat

If the lot and design meet Housing SEPP Schedule 1 the granny flat can be complying development; if not, it goes to the council as a DA.

St Marys granny flat approach

Custom Home

Brief-first design: drawn to your block and budget, then engineered and approved.

St Marys custom home approach

Extension

Rear and second-storey additions, with the existing slab, frame and roof investigated before pricing.

St Marys extension approach

Renovation

Older homes renovated with care: original materials kept where they're worth keeping, replaced where they aren't.

St Marys renovation approach

Approval pathway in St Marys

Council: Penrith City Council.

For a St Marys rebuild, the pathway is worth settling before drafting starts. A CDC suits a design that meets every code standard on a lot the codes apply to; a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). A DA through Penrith City lets the design flex; a DA has a 40-day assessment period. Neither clock includes design, engineering or the time to answer requests for more information.

CDC pathway

Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.

DA pathway

Penrith City merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.

Local duplex minimum

Check Penrith City Council's local environmental plan and its lot size maps for the lot.

As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).

Low and Mid-Rise areas in Penrith

Penrith station and town centre. Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). Council rules compared

Granny flats

Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to Penrith City as a DA.

St Marys site considerations

Three things move a St Marys budget before the house itself: the ground (confirmed by a geotechnical report), the slope (confirmed by a detail survey) and the service connections (confirmed by Sydney Water and the electricity network). Each is priced once that document is in hand, not allowed for by guesswork.

Soil & footings

A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.

Demolition & asbestos

A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.

Flood, bushfire & heritage

These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.

What to check for a St Marys lot, and where

St Marys build FAQs

The questions that come up most often on a first St Marys site walk.

What does it cost to knock down and rebuild in St Marys?
For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
Do you do extensions and renovations in St Marys?
Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.
How long does a DA take with Penrith City?
NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through Penrith City or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in Penrith City's fees and charges.
What decides the site costs on a St Marys block?
The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by Penrith City's tree controls and an arborist, stormwater by Penrith City's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.
How long does a custom home build take in St Marys?
The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a St Marys timeline is set once the design and the approval pathway are known.
Can I build a duplex in St Marys?
The local minimum lot size for a duplex is set in Penrith City Council's local environmental plan; the lot size map for the address shows it. As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
What's the granny flat pathway in St Marys?
Secondary dwellings in St Marys are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with Penrith City. The title, overlays and current controls are checked with the certifier or Penrith City before design.
What soil class is typical in St Marys?
There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.

Nearby Penrith suburbs we build in

Other Penrith suburbs, assessed by the same council: Penrith City Council.

Ready to talk about your St Marys build?

Oliver will respond within 4 working hours for a free initial conversation about your St Marys site, the Penrith City pathway and what it could cost to build.