
Jordan Springs Home Builder — Custom Homes, KDR, Duplex
Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · Penrith DA and CDC pathways
Modern infrastructure throughout.
Jordan Springs (2747) is in Penrith. Before a design or a price, Buildana checks the title, the planning certificate and the site, so the advice fits the lot.
Council
Penrith City
Postcode
2747
Build rate (Rawlinsons)
$2,820–$4,250/m² + GST
DA assessment period
40 days (statutory)
Duplex minimum lot
Check the LEP
Low and Mid-Rise areas
1 nominated
Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.
Builder perspective
Building in Jordan Springs: what gets checked first
Every Jordan Springs feasibility begins with paperwork: the title plan, the planning certificate for the address and, before any slab design, a geotechnical report. Approval runs through Penrith City or a certifier: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise), and a DA has a 40-day assessment period. New house versus a large renovation is a cost question: Rawlinsons rates for a new Sydney house run $2,820–$4,250/m² + GST, an addition has its own rates, and the condition of the existing house decides which makes sense. Site costs are the part of a budget no desktop estimate can settle: soil, slope, trees, stormwater and services are each confirmed by the engineer, surveyor, arborist or authority responsible. Buildana is a Fairfield-based builder holding NSW contractor licence 487805C, and Oliver Alameri, with 15+ years' building experience, runs every job himself. If you're sitting on a Jordan Springs block, or about to buy one, send the address and Oliver will tell you what's realistic on it and which checks come next.
Oliver Alameri — Founder & licensed builder
Licence 487805C · 15+ years' building experience
Jordan Springs build context
What's known for Jordan Springs, and the document that confirms each lot-specific fact before a price.
Council
Penrith City Council
Postcode
2747
Nearest station
St Marys + future Western Sydney Airport rail
Local landmark
Jordan Springs Town Centre + Jordan Springs lake + Penrith Lakes precinct
Zoning
Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer
Lot area and frontage
Title plan, or a detail survey
Site classification (AS 2870)
Geotechnical report for the lot
Age of the house
Built before 1990? Asbestos inspection before demolition
Duplex minimum lot
Lot size map in the council's LEP
Low and Mid-Rise area
Walking distance to a nominated area, measured for the lot
Build rate (Rawlinsons)
$2,820–$4,250/m² + GST
Why owners build with Buildana in Jordan Springs
What every Buildana job includes, written down.
- Licence 487805C, home building compensation cover where the law requires it, and a written contract with an inclusions schedule.
- Penrith City rules are read before design: a CDC where the design meets every code standard, a DA where it needs merit assessment.
- One point of contact: Oliver sequences the survey, geotechnical report, engineering and BASIX so each informs the next.
- If the house was built before 1990, an asbestos inspection comes before demolition, and removal is by a SafeWork NSW licensed contractor.
- Changes to the scope are agreed in writing before the work is done, as NSW home building law requires.
- Anchored on the amanah principle: keeping the word given. Local landmark: Jordan Springs Town Centre + Jordan Springs lake + Penrith Lakes precinct. Nearest station: St Marys + future Western Sydney Airport rail.
Jordan Springs build costs from published rates
Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a Jordan Springs lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.
| Build type | Published rate | Basis |
|---|---|---|
| Custom home, per m² | $2,820–$4,250/m² + GST | Rawlinsons individual house, brick veneer, medium to high finish. |
| Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²) | single storey $565k–$980k + GST, double storey $735k–$1.27M + GST | At $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra. |
| Duplex, attached four-bedroom pair | $1.4M–$1.7M + GST | Both dwellings, before site costs and subdivision. |
| Ground-floor addition, per m² | $2,360–$2,840/m² + GST | Rawlinsons ground floor addition, framed to brick veneer. |
| First-floor addition, per m² | $3,790–$4,230/m² + GST | Rawlinsons full first floor addition. |
| New bathroom in an addition | $34k–$38k + GST | Rawlinsons bathroom fit-out and services, each. |
| New kitchen in an addition | $28k–$32k + GST | Rawlinsons kitchen fit-out and services, each. |
| Granny flat | From the catalogue price of the design you choose, plus site costs | Catalogue designs carry their own published price. |
Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.
Free Jordan Springs feasibility
Thinking about building in Jordan Springs? Start with the lot, not a sales pitch.
Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.
Buildana services in Jordan Springs
Six services across Penrith, each priced for the lot once plans, engineering and site checks are done.
Knockdown Rebuild
The new house is costed from published Rawlinsons rates; demolition and site costs are confirmed for the lot before the contract.
Jordan Springs knockdown rebuild approachDuplex
Two homes on one lot with separate services, fire separation and sound insulation designed to the National Construction Code.
Jordan Springs duplex approachGranny Flat
A granny flat built as a proper home: its own kitchen, bathroom, BASIX certificate and statutory warranty.
Jordan Springs granny flat approachCustom Home
Architect-led design sized to the block, the streetscape and the brief, not a catalogue plan.
Jordan Springs custom home approachExtension
Extensions that tie into the existing roof line, brickwork and slab so the addition reads as part of the house.
Jordan Springs extension approachRenovation
Structural changes, waterproofing and finishes in one contract with a licensed builder.
Jordan Springs renovation approachApproval pathway in Jordan Springs
Council: Penrith City Council.
The approval question on a Jordan Springs build is whether the design complies with every clause of the Codes SEPP, or needs merit assessment by Penrith City. Complying development: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). Development application: a DA has a 40-day assessment period. Application fees are in Penrith City's fees and charges, and contributions depend on its contributions plans.
CDC pathway
Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.
DA pathway
Penrith City merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.
Local duplex minimum
Check Penrith City Council's local environmental plan and its lot size maps for the lot.
As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).
Low and Mid-Rise areas in Penrith
Penrith station and town centre. Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). Council rules compared
Granny flats
Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to Penrith City as a DA.
Jordan Springs site considerations
Site costs in Jordan Springs come from the lot, not the suburb. The footings depend on the site classification, which a geotechnical engineer sets under AS 2870 and the structural engineer designs to. Demolition depends on the existing house: if it was built before 1990, a licensed asbestos assessor confirms what's there before a licensed removalist takes it out.
Soil & footings
A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.
Demolition & asbestos
A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.
Flood, bushfire & heritage
These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.
What to check for a Jordan Springs lot, and where
- Zoning, height, floor space ratio and lot size. The zone decides what can be built; the height, floor space ratio and lot size maps set the numbers for the lot. NSW Planning Portal Spatial Viewer
- Setbacks, landscaping, parking and design. These sit in the council's development control plan, which a DA is assessed against. Development control plan, Penrith City Council
- Flooding. Whether the lot is flood affected, and which floor level or design controls follow. The lot's planning certificate records it too. Flood information, Penrith City Council
- Bush fire prone land. Whether the lot is mapped bush fire prone, which brings a bush fire assessment and construction standards. NSW Rural Fire Service
- Heritage. Heritage items and conservation areas, listed in Schedule 5 of the council's local environmental plan. NSW heritage databases
- Low and Mid-Rise exclusions. Lots inside a nominated area can still be excluded, for example by hazards or heritage. NSW Planning, Low and Mid-Rise exclusions
- Development contributions. Section 7.11 or 7.12 contributions depend on the council's plan, the location and the proposal. Contributions plans, Penrith City Council
- Application fees and timing. Each council publishes its application fees in its fees and charges, and tracks its own applications online. Fees and charges, Penrith City Council
Built by Buildana
Smart Street and The Boulevarde
Buildana builds across Penrith: single and double-storey homes, knockdown rebuilds, duplexes where the lot meets Penrith City's minimums or the state's Low and Mid-Rise standards, and granny flats under the Housing SEPP. It starts with your Jordan Springs site: title, zone, slope, frontage and soil. Then design, then a written price.

Smart Street
A two-storey duplex designed and built by Buildana, pairing a rendered upper floor with dark vertical cladding.

The Boulevarde
An attached two-storey duplex Buildana delivered from start to finish, with tall arched windows and timber-toned joinery.
Projects and case studies
See Smart Street and The Boulevarde, built by Buildana, and studies of other completed Sydney homes.
Read case studiesPenrith hub
Builder hub for Penrith: every suburb, every service, council pathway notes.
Open Penrith hubFree Jordan Springs site check
Send your Jordan Springs address: Oliver checks title, zone, slope, frontage and soil before you spend a dollar.
Book a site checkJordan Springs build FAQs
The questions that come up most often on a first Jordan Springs site walk.
- What soil class is typical in Jordan Springs?
- There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
- What does it cost to knock down and rebuild in Jordan Springs?
- For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
- Do you do extensions and renovations in Jordan Springs?
- Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.
- How long does a DA take with Penrith City?
- NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through Penrith City or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in Penrith City's fees and charges.
- What decides the site costs on a Jordan Springs block?
- The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by Penrith City's tree controls and an arborist, stormwater by Penrith City's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.
- How long does a custom home build take in Jordan Springs?
- The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a Jordan Springs timeline is set once the design and the approval pathway are known.
- Can I build a duplex in Jordan Springs?
- The local minimum lot size for a duplex is set in Penrith City Council's local environmental plan; the lot size map for the address shows it. As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
- What's the granny flat pathway in Jordan Springs?
- Secondary dwellings in Jordan Springs are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with Penrith City. The title, overlays and current controls are checked with the certifier or Penrith City before design.
Nearby Penrith suburbs we build in
Other Penrith suburbs, assessed by the same council: Penrith City Council.
Ready to talk about your Jordan Springs build?
Oliver will respond within 4 working hours for a free initial conversation about your Jordan Springs site, the Penrith City pathway and what it could cost to build.