We’re here to make it feel like home

Buildana construction project in Western Sydney

Duplex Builders St Marys — Dual Occupancy Design & Build

Two homes on one lot in St Marys 2760, where the zoning, lot size and frontage allow. Build allowance: $1.4M–$1.7M + GST for an attached four-bedroom pair, before site costs.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Building a duplex in St Marys costs $1.4M–$1.7M + GST for an attached four-bedroom pair, before site costs; demolition, Penrith City Council contributions, subdivision and land are extra. Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Buildana manages feasibility, approvals, construction and subdivision, with a fixed-price contract once design and scope are set.

St Marys Duplex Construction

A duplex in St Marys works on the R2 side streets, and Penrith's low duplex minimum helps the case. Lots run 450 to 750m2 against a 450m2 minimum under the Penrith DCP, so a large share qualify, though R3 and R4 redevelopment is ramping around the station ahead of the Western Sydney Airport rail link. A Torrens-title duplex on a qualifying side-street block is a sound investor play.

The ground is Wianamatta Shale, so footings and the slab are engineered to suit, and the older fibro and brick stock nearly always carries asbestos, stripped under licence. Industrial-legacy contamination on the eastern edge needs checking where it applies.

What I would check first on your St Marys block: the zoning, the area against the low 450m2 minimum, and any eastern-edge contamination overlay.

We build these under NSW contractor licence 487805C. Send me the block and I will tell you what it carries.

Buildana manages the full duplex development process in St Marys — from feasibility assessment and architectural design through to DA or CDC approval, and construction to dual handover, under a fixed-price contract once design and scope are set. One builder, one contract, two homes.

Read our Complete Duplex Building Guide or explore our duplex builders in Sydney service and completed projects.

  • Build cost $1.4M–$1.7M + GST for an attached four-bedroom pair, before site costs
  • Penrith City Council DA and CDC approvals managed
  • R2 and R3 zones — established dual occ. provisions
  • Low and Mid-Rise Housing Policy: lots from 450m² and at least 12m wide
  • M — engineered dual-slab design included
  • Strata or Torrens title subdivision available
  • 6-year structural warranty per dwelling
  • Free feasibility check — near St Marys station
Duplex development by Buildana in St Marys 2760
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

R2 side streets, low minimum

St Marys lots run 450 to 750m2 against a 450m2 Penrith minimum, so a large share of side-street blocks qualify.

R3 and R4 redevelopment is ramping around the station ahead of the airport rail link, so the side streets are where a duplex fits.

Shale, fibro and contamination

The Wianamatta Shale means footings and slab engineered to suit, with older fibro stripped of asbestos under licence.

Industrial-legacy contamination on the eastern edge is checked where it applies before design.

Duplex builder in St Marys — key facts

Suburb
St Marys, NSW 2760
Council / LGA
Penrith City Council (City of Penrith)
Primary zoning
R2
Typical lot size
450–750m² typical (Cranebrook/Werrington/Cambridge Park/Kingswood/St Marys); 250–450m² master-planned (Jordan Springs/Caddens/Glenmore Park new release)
Soil class
M
Home era
1950s–1980s + 2010s+ R4 apartments
Typical price range
$1.4M–$1.7M + GST for an attached four-bedroom pair, before site costs
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26
Approval pathway
CDC for compliant dual-occupancy, else DA

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Cost Guide

ItemEstimated Range
Vacant R2/R3 block in St Marys (build)$1.4M–$1.7M + GST for an attached four-bedroom pair
KDR duplex (demolish 1950s–1980s + 2010s+ R4 apartments home + build both)Build cost plus demolition, asbestos and service disconnections
Torrens title, to sell or refinance one sideDepends on survey, council and service authority requirements
Corner block / dual-frontage designPriced per site

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

Feasibility first — a yes/no before you spend real money on design
Design and engineering run as a single dual-package, not two separate jobs
Penrith City Council DA or CDC lodged once for both dwellings
Dual slab poured in a single site mobilisation — no second set-up
Trade crews sized for dual build — roofers, plasterers, tilers don't bottleneck
Dual handover together — both titles ready to settle or lease

How It Works

From First Call to Final Key

Feasibility covers the planning side and the financial side. Yes-or-no on whether the block supports dual occupancy under Penrith City Council controls, plus indicative end values, build cost, and likely yield.

⏱

Dual occupancy floor plans designed for your St Marys block — attached or detached configuration, vehicle access, private open space, and full Penrith City Council compliance..

⏱

Full approval management: Statement of Environmental Effects, plans, reports, and all supporting documentation lodged with Penrith City Council or private certifier. We handle RFIs and conditions.

⏱

Construction follows a tight programme: dual slabs in one mobilisation, paired frame stand, simultaneous lock-up, then trades rotate between sides for fit-out so no day is lost waiting on availability. The schedule is engineered, not optimistic.

⏱

Both dwellings handed over with individual Occupation Certificates. Subdivision lodged for separate titles.

⏱

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Duplex in St Marys — Book Site Assessment

Free duplex feasibility assessment for St Marys 2760. We'll check your block against the planning rules and explain the approval pathway and build costs.

Start Your Project