Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Premium custom home, brick and render
Bella Vista 2153 · The Hills

Bella Vista Home Builder — Custom Homes, KDR, Duplex

Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · The Hills DA and CDC pathways

Wianamatta Shale soil. Top-tier schools. Norwest Business Park adjacency.

Bella Vista is assessed by The Hills Shire Council. Zoning, flooding, bush fire and heritage are recorded lot by lot on the planning certificate, so that's where every Bella Vista feasibility starts.

Council

The Hills Shire

Postcode

2153

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

DA assessment period

40 days (statutory)

Duplex minimum lot

600–700m² (LEP)

Low and Mid-Rise areas

7 nominated

Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.

Builder perspective

Building in Bella Vista: what gets checked first

Building in Bella Vista starts with the same questions on every site: what the title and the planning certificate say about the lot, what The Hills Shire Council will assess, and what a geotechnical report says about the ground. The Hills Shire assesses a development application on its merits, and a DA has a 40-day assessment period; a design that meets every code standard can go the complying development route instead. Granny flats come under Housing SEPP 2021: complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m²; otherwise the council assesses a DA. The footing system comes from the geotechnical report: the engineer classifies the site under AS 2870 and the slab is designed to that class. Buildana's price comes after the plans, engineering and site checks, as a written contract with an inclusions schedule, so the number reflects the actual lot. Send through a Bella Vista address and Oliver will read the title, zoning and planning certificate before any design conversation starts.

OA

Oliver Alameri — Founder & licensed builder

Licence 487805C · 15+ years' building experience

Talk to Oliver

Bella Vista build context

What's known for Bella Vista, and the document that confirms each lot-specific fact before a price.

Council

The Hills Shire Council

Postcode

2153

Nearest station

Bella Vista (Sydney Metro Northwest, in suburb)

Local landmark

Bella Vista Farm + Sydney Metro station

Zoning

Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer

Lot area and frontage

Title plan, or a detail survey

Site classification (AS 2870)

Geotechnical report for the lot

Age of the house

Built before 1990? Asbestos inspection before demolition

Duplex minimum lot

600–700m² (LEP)

Low and Mid-Rise area

Bella Vista station (800m walk applies)

Median house rent, The Hills (DCJ)

1 bed $420/wk · 2 bed $670/wk

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

Why owners build with Buildana in Bella Vista

What every Buildana job includes, written down.

  • NSW contractor licence 487805C. Every job runs on a written contract with an inclusions schedule, priced once plans, engineering and site checks are done.
  • The Hills Shire controls are checked up front, so the design is drawn for the approval pathway it will actually take.
  • Oliver coordinates the surveyor, geotechnical and structural engineers, BASIX assessor and certifier, so the documents arrive in the right order.
  • Asbestos is identified before demolition, not discovered during it: pre-1990 houses are inspected and licensed removalists do the work.
  • Build rates come from the Rawlinsons construction handbook, escalated with the ABS house construction price index, not a guess.
  • Anchored on the amanah principle: keeping the word given. Local landmark: Bella Vista Farm + Sydney Metro station. Nearest station: Bella Vista (Sydney Metro Northwest, in suburb).

Bella Vista build costs from published rates

Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a Bella Vista lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.

Build typePublished rateBasis
Custom home, per m²$2,820–$4,250/m² + GSTRawlinsons individual house, brick veneer, medium to high finish.
Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²)single storey $565k–$980k + GST, double storey $735k–$1.27M + GSTAt $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra.
Duplex, attached four-bedroom pair$1.4M–$1.7M + GSTBoth dwellings, before site costs and subdivision.
Ground-floor addition, per m²$2,360–$2,840/m² + GSTRawlinsons ground floor addition, framed to brick veneer.
First-floor addition, per m²$3,790–$4,230/m² + GSTRawlinsons full first floor addition.
New bathroom in an addition$34k–$38k + GSTRawlinsons bathroom fit-out and services, each.
New kitchen in an addition$28k–$32k + GSTRawlinsons kitchen fit-out and services, each.
Granny flatFrom the catalogue price of the design you choose, plus site costsCatalogue designs carry their own published price.

Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.

Free Bella Vista feasibility

Thinking about building in Bella Vista? Start with the lot, not a sales pitch.

Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.

Written contract with an inclusions schedule Licence 487805C The Hills Shire DA and CDC pathways explained

Buildana services in Bella Vista

Six services across The Hills, each priced for the lot once plans, engineering and site checks are done.

Knockdown Rebuild

Knockdown rebuild in the right order: asbestos inspection, demolition, geotechnical report, slab design, then the build.

Bella Vista knockdown rebuild approach

Duplex

Duplex feasibility starts with zone, area, frontage and slope, read from the title and the planning certificate.

Bella Vista duplex approach

Granny Flat

Secondary dwellings under Housing SEPP 2021: complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m².

Bella Vista granny flat approach

Custom Home

Custom plans tailored to the land, orientation and budget, priced once the drawings and engineering are done.

Bella Vista custom home approach

Extension

A first-floor addition needs the original footings checked by an engineer, and that happens before the design is finalised.

Bella Vista extension approach

Renovation

Renovations scoped properly: waterproofing, electrical compliance and smoke alarms to current standards.

Bella Vista renovation approach

Approval pathway in Bella Vista

Council: The Hills Shire Council.

The Hills Shire administers local planning controls for Bella Vista, including setbacks, character provisions and heritage overlays. A certifier assesses a proposed rebuild or dual occupancy against the Codes SEPP and site exclusions before confirming CDC eligibility. Where complying development is unavailable, a DA may be required. Secondary dwellings are assessed under Housing SEPP 2021 and applicable complying-development standards; lot size and zoning alone do not guarantee approval.

CDC pathway

Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.

DA pathway

The Hills Shire merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.

Local duplex minimum

As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).

Low and Mid-Rise areas in The Hills

Baulkham Hills town centre, Bella Vista station, Castle Hill station and town centre, Hills Showground station, Kellyville station, Norwest station and town centre, Winston Hills Mall shopping centre. Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). Bella Vista station is on the list; whether a Bella Vista lot is within an 800m walk of it is measured for each lot. Council rules compared

Granny flats

Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to The Hills Shire as a DA.

Bella Vista site considerations

The planning certificate for a Bella Vista address says whether the lot is flood affected, bush fire prone or in a heritage area. Each brings its own consultant (flood engineer, bush fire assessor, heritage advisor) and its own cost, confirmed before the contract.

Soil & footings

A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.

Demolition & asbestos

A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.

Flood, bushfire & heritage

These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.

What to check for a Bella Vista lot, and where

Bella Vista build FAQs

The questions that come up most often on a first Bella Vista site walk.

How long does a custom home build take in Bella Vista?
The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a Bella Vista timeline is set once the design and the approval pathway are known.
Can I build a duplex in Bella Vista?
The Hills LEP 2019, cl 4.1A (Zones R2 and R3, attached): at least 600m². The Hills LEP 2019, cl 4.1A (Zones R2 and R3, detached): at least 700m². As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. Bella Vista station is one of those areas. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
What's the granny flat pathway in Bella Vista?
Secondary dwellings in Bella Vista are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with The Hills Shire. The title, overlays and current controls are checked with the certifier or The Hills Shire before design.
What soil class is typical in Bella Vista?
There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
What does it cost to knock down and rebuild in Bella Vista?
For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
Do you do extensions and renovations in Bella Vista?
Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.
How long does a DA take with The Hills Shire?
NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through The Hills Shire or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in The Hills Shire's fees and charges.
What decides the site costs on a Bella Vista block?
The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by The Hills Shire's tree controls and an arborist, stormwater by The Hills Shire's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.
What do small houses rent for in The Hills?
NSW DCJ Rent and Sales Report, new bonds lodged April to June 2026, houses in The Hills: one bedroom $420 a week (a small sample: DCJ flags 30 or fewer new bonds); two bedrooms $670 a week (81 new bonds). DCJ doesn't report granny flats separately; small houses are the nearest category.

Rents: NSW DCJ Rent and Sales Report, April to June 2026.

Ready to talk about your Bella Vista build?

Oliver will respond within 4 working hours for a free initial conversation about your Bella Vista site, the The Hills Shire pathway and what it could cost to build.