Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Architectural custom home with landscaped frontage
South Maroota 2756 · The Hills

South Maroota Home Builder — Custom Homes, KDR, Duplex

Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · The Hills DA and CDC pathways

Bushfire-prone significant. Hawkesbury River foreshore proximity. Cattai Creek riparian setbacks.

South Maroota (2756) is in The Hills. Before a design or a price, Buildana checks the title, the planning certificate and the site, so the advice fits the lot.

Council

The Hills Shire

Postcode

2756

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

DA assessment period

40 days (statutory)

Duplex minimum lot

600–700m² (LEP)

Low and Mid-Rise areas

7 nominated

Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.

Builder perspective

Building in South Maroota: what gets checked first

Every South Maroota feasibility begins with paperwork: the title plan, the planning certificate for the address and, before any slab design, a geotechnical report. The Hills Shire runs the planning, and under NSW law a DA has a 40-day assessment period. That is a deadline for a decision, not a promise. New house versus a large renovation is a cost question: Rawlinsons rates for a new Sydney house run $2,820–$4,250/m² + GST, an addition has its own rates, and the condition of the existing house decides which makes sense. Flooding, bush fire and heritage are mapped lot by lot, so the planning certificate for the address is the first document to read. Every Buildana job runs on a written contract with an inclusions schedule, priced once plans, engineering and site checks are done. The right first step on a South Maroota site is a feasibility, not a quote: the lot decides what makes sense.

OA

Oliver Alameri — Founder & licensed builder

Licence 487805C · 15+ years' building experience

Talk to Oliver

South Maroota build context

What's known for South Maroota, and the document that confirms each lot-specific fact before a price.

Council

The Hills Shire Council

Postcode

2756

Nearest station

No rail (rural)

Local landmark

South Maroota rural roads + Hawkesbury foreshore

Zoning

Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer

Lot area and frontage

Title plan, or a detail survey

Site classification (AS 2870)

Geotechnical report for the lot

Age of the house

Built before 1990? Asbestos inspection before demolition

Duplex minimum lot

600–700m² (LEP)

Low and Mid-Rise area

Walking distance to a nominated area, measured for the lot

Median house rent, The Hills (DCJ)

1 bed $420/wk · 2 bed $670/wk

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

Why owners build with Buildana in South Maroota

What every Buildana job includes, written down.

  • Licence 487805C, home building compensation cover where the law requires it, and a written contract with an inclusions schedule.
  • The Hills Shire rules are read before design: a CDC where the design meets every code standard, a DA where it needs merit assessment.
  • One point of contact: Oliver sequences the survey, geotechnical report, engineering and BASIX so each informs the next.
  • If the house was built before 1990, an asbestos inspection comes before demolition, and removal is by a SafeWork NSW licensed contractor.
  • Changes to the scope are agreed in writing before the work is done, as NSW home building law requires.
  • Anchored on the amanah principle: keeping the word given. Local landmark: South Maroota rural roads + Hawkesbury foreshore. Nearest station: No rail (rural).

South Maroota build costs from published rates

Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a South Maroota lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.

Build typePublished rateBasis
Custom home, per m²$2,820–$4,250/m² + GSTRawlinsons individual house, brick veneer, medium to high finish.
Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²)single storey $565k–$980k + GST, double storey $735k–$1.27M + GSTAt $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra.
Duplex, attached four-bedroom pair$1.4M–$1.7M + GSTBoth dwellings, before site costs and subdivision.
Ground-floor addition, per m²$2,360–$2,840/m² + GSTRawlinsons ground floor addition, framed to brick veneer.
First-floor addition, per m²$3,790–$4,230/m² + GSTRawlinsons full first floor addition.
New bathroom in an addition$34k–$38k + GSTRawlinsons bathroom fit-out and services, each.
New kitchen in an addition$28k–$32k + GSTRawlinsons kitchen fit-out and services, each.
Granny flatFrom the catalogue price of the design you choose, plus site costsCatalogue designs carry their own published price.

Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.

Free South Maroota feasibility

Thinking about building in South Maroota? Start with the lot, not a sales pitch.

Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.

Written contract with an inclusions schedule Licence 487805C The Hills Shire DA and CDC pathways explained

Buildana services in South Maroota

Six services across The Hills, each priced for the lot once plans, engineering and site checks are done.

Knockdown Rebuild

One builder from demolition to handover: the old house out, footings designed for the site classification, the new house built and certified.

South Maroota knockdown rebuild approach

Duplex

Attached or detached duplexes where the lot meets the council's minimum or the state's Low and Mid-Rise standards, checked before design.

South Maroota duplex approach

Granny Flat

Granny flat designs come from a priced catalogue, so the design's cost is known before site costs are added.

South Maroota granny flat approach

Custom Home

From sketch to handover: design, engineering, approval and build with one builder accountable.

South Maroota custom home approach

Extension

Adding to an existing home is harder than starting fresh, so the structure is checked before a price is written.

South Maroota extension approach

Renovation

Kitchens, bathrooms and whole-house renovations with an itemised scope and a written contract.

South Maroota renovation approach

Approval pathway in South Maroota

Council: The Hills Shire Council.

In South Maroota, the approval pathway depends on whether the design meets every standard of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008. If it does, a complying development certificate (CDC) can come from The Hills Shire or a private certifier: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). If it doesn't, the design goes to The Hills Shire as a development application (DA): a DA has a 40-day assessment period. Both are deadlines for a decision; missing information, referrals and design changes add time.

CDC pathway

Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.

DA pathway

The Hills Shire merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.

Local duplex minimum

As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).

Low and Mid-Rise areas in The Hills

Baulkham Hills town centre, Bella Vista station, Castle Hill station and town centre, Hills Showground station, Kellyville station, Norwest station and town centre, Winston Hills Mall shopping centre. Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). Council rules compared

Granny flats

Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to The Hills Shire as a DA.

South Maroota site considerations

Stormwater is set by The Hills Shire's requirements and designed by a civil or hydraulic engineer; tree removal or protection by The Hills Shire's tree controls and an arborist's report; access and crane needs by the street itself. None of these is a suburb-wide number, so each is checked for the South Maroota lot.

Soil & footings

A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.

Demolition & asbestos

A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.

Flood, bushfire & heritage

These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.

What to check for a South Maroota lot, and where

South Maroota build FAQs

The questions that come up most often on a first South Maroota site walk.

What do small houses rent for in The Hills?
NSW DCJ Rent and Sales Report, new bonds lodged April to June 2026, houses in The Hills: one bedroom $420 a week (a small sample: DCJ flags 30 or fewer new bonds); two bedrooms $670 a week (81 new bonds). DCJ doesn't report granny flats separately; small houses are the nearest category.
How long does a custom home build take in South Maroota?
The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a South Maroota timeline is set once the design and the approval pathway are known.
Can I build a duplex in South Maroota?
The Hills LEP 2019, cl 4.1A (Zones R2 and R3, attached): at least 600m². The Hills LEP 2019, cl 4.1A (Zones R2 and R3, detached): at least 700m². As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
What's the granny flat pathway in South Maroota?
Secondary dwellings in South Maroota are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with The Hills Shire. The title, overlays and current controls are checked with the certifier or The Hills Shire before design.
What soil class is typical in South Maroota?
There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
What does it cost to knock down and rebuild in South Maroota?
For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
Do you do extensions and renovations in South Maroota?
Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.
How long does a DA take with The Hills Shire?
NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through The Hills Shire or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in The Hills Shire's fees and charges.
What decides the site costs on a South Maroota block?
The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by The Hills Shire's tree controls and an arborist, stormwater by The Hills Shire's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.

Rents: NSW DCJ Rent and Sales Report, April to June 2026.

Ready to talk about your South Maroota build?

Oliver will respond within 4 working hours for a free initial conversation about your South Maroota site, the The Hills Shire pathway and what it could cost to build.