Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Contemporary custom home facade
Kogarah 2217 · Georges River

Kogarah Home Builder — Custom Homes, KDR, Duplex

Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · Georges River DA and CDC pathways

Kogarah is the medical and education precinct of the LGA — St George Hospital, St George Private and Kogarah CBD around the station. Strong healthcare-staff and student tenant demand.

Around St George Hospital and Kogarah Town Square and Kogarah CBD, Kogarah lots vary street by street. Georges River sets the local controls; the state codes decide whether a design can go the complying development route.

Council

Georges River

Postcode

2217

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

DA assessment period

40 days (statutory)

Duplex minimum lot

Check the LEP

Low and Mid-Rise areas

7 nominated

Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.

Builder perspective

Building in Kogarah: what gets checked first

Kogarah (2217) is in the Georges River local government area, so Georges River Council sets the local planning controls and assesses any development application. Georges River runs the planning, and under NSW law a DA has a 40-day assessment period. That is a deadline for a decision, not a promise. A knockdown rebuild, an extension or a granny flat each suit a different lot; which one fits Kogarah depends on the house that's there now and what the planning certificate allows. Flooding, bush fire and heritage are mapped lot by lot, so the planning certificate for the address is the first document to read. Every Buildana job runs on a written contract with an inclusions schedule, priced once plans, engineering and site checks are done. The right first step on a Kogarah site is a feasibility, not a quote: the lot decides what makes sense.

OA

Oliver Alameri — Founder & licensed builder

Licence 487805C · 15+ years' building experience

Talk to Oliver

Kogarah build context

What's known for Kogarah, and the document that confirms each lot-specific fact before a price.

Council

Georges River Council

Postcode

2217

Nearest station

Kogarah

Local landmark

St George Hospital + Kogarah Town Square + Kogarah CBD

Zoning

Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer

Lot area and frontage

Title plan, or a detail survey

Site classification (AS 2870)

Geotechnical report for the lot

Age of the house

Built before 1990? Asbestos inspection before demolition

Duplex minimum lot

Lot size map in the council's LEP

Low and Mid-Rise area

Kogarah station and town centre (800m walk applies)

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

Why owners build with Buildana in Kogarah

What every Buildana job includes, written down.

  • Licensed NSW builder (licence 487805C): the price comes as a written contract with an inclusions schedule, after plans, engineering and site checks.
  • Georges River pathway explained plainly: a CDC from a certifier or the council if the design complies, a DA if it doesn't.
  • One point of contact: Oliver sequences the survey, geotechnical report, engineering and BASIX so each informs the next.
  • If the house was built before 1990, an asbestos inspection comes before demolition, and removal is by a SafeWork NSW licensed contractor.
  • Changes to the scope are agreed in writing before the work is done, as NSW home building law requires.
  • Anchored on the amanah principle: keeping the word given. Local landmark: St George Hospital + Kogarah Town Square + Kogarah CBD. Nearest station: Kogarah.

Kogarah build costs from published rates

Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a Kogarah lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.

Build typePublished rateBasis
Custom home, per m²$2,820–$4,250/m² + GSTRawlinsons individual house, brick veneer, medium to high finish.
Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²)single storey $565k–$980k + GST, double storey $735k–$1.27M + GSTAt $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra.
Duplex, attached four-bedroom pair$1.4M–$1.7M + GSTBoth dwellings, before site costs and subdivision.
Ground-floor addition, per m²$2,360–$2,840/m² + GSTRawlinsons ground floor addition, framed to brick veneer.
First-floor addition, per m²$3,790–$4,230/m² + GSTRawlinsons full first floor addition.
New bathroom in an addition$34k–$38k + GSTRawlinsons bathroom fit-out and services, each.
New kitchen in an addition$28k–$32k + GSTRawlinsons kitchen fit-out and services, each.
Granny flatFrom the catalogue price of the design you choose, plus site costsCatalogue designs carry their own published price.

Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.

Free Kogarah feasibility

Thinking about building in Kogarah? Start with the lot, not a sales pitch.

Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.

Written contract with an inclusions schedule Licence 487805C Georges River DA and CDC pathways explained

Buildana services in Kogarah

Six services across Georges River, each priced for the lot once plans, engineering and site checks are done.

Knockdown Rebuild

One builder from demolition to handover: the old house out, footings designed for the site classification, the new house built and certified.

Kogarah knockdown rebuild approach

Duplex

Attached or detached duplexes where the lot meets the council's minimum or the state's Low and Mid-Rise standards, checked before design.

Kogarah duplex approach

Granny Flat

Granny flat designs come from a priced catalogue, so the design's cost is known before site costs are added.

Kogarah granny flat approach

Custom Home

From sketch to handover: design, engineering, approval and build with one builder accountable.

Kogarah custom home approach

Extension

Adding to an existing home is harder than starting fresh, so the structure is checked before a price is written.

Kogarah extension approach

Renovation

Kitchens, bathrooms and whole-house renovations with an itemised scope and a written contract.

Kogarah renovation approach

Approval pathway in Kogarah

Council: Georges River Council.

In Kogarah, the approval pathway depends on whether the design meets every standard of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008. If it does, a complying development certificate (CDC) can come from Georges River or a private certifier: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). If it doesn't, the design goes to Georges River as a development application (DA): a DA has a 40-day assessment period. Both are deadlines for a decision; missing information, referrals and design changes add time.

CDC pathway

Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.

DA pathway

Georges River merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.

Local duplex minimum

Check Georges River Council's local environmental plan and its lot size maps for the lot.

As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).

Low and Mid-Rise areas in Georges River

Kogarah station and town centre, Beverly Hills station, Hurstville station and town centre, Mortdale station and town centre, Oatley station, Penshurst station, Riverwood station and town centre. Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). Kogarah station and town centre is on the list; whether a Kogarah lot is within an 800m walk of it is measured for each lot. Council rules compared

Granny flats

Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to Georges River as a DA.

Kogarah site considerations

Stormwater is set by Georges River's requirements and designed by a civil or hydraulic engineer; tree removal or protection by Georges River's tree controls and an arborist's report; access and crane needs by the street itself. None of these is a suburb-wide number, so each is checked for the Kogarah lot.

Soil & footings

A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.

Demolition & asbestos

A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.

Flood, bushfire & heritage

These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.

What to check for a Kogarah lot, and where

Kogarah build FAQs

The questions that come up most often on a first Kogarah site walk.

Do you do extensions and renovations in Kogarah?
Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.
How long does a DA take with Georges River?
NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through Georges River or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in Georges River's fees and charges.
What decides the site costs on a Kogarah block?
The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by Georges River's tree controls and an arborist, stormwater by Georges River's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.
How long does a custom home build take in Kogarah?
The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a Kogarah timeline is set once the design and the approval pathway are known.
Can I build a duplex in Kogarah?
The local minimum lot size for a duplex is set in Georges River Council's local environmental plan; the lot size map for the address shows it. As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. Kogarah station and town centre is one of those areas. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
What's the granny flat pathway in Kogarah?
Secondary dwellings in Kogarah are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with Georges River. The title, overlays and current controls are checked with the certifier or Georges River before design.
What soil class is typical in Kogarah?
There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
What does it cost to knock down and rebuild in Kogarah?
For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.

Nearby Georges River suburbs we build in

Other Georges River suburbs, assessed by the same council: Georges River Council.

Ready to talk about your Kogarah build?

Oliver will respond within 4 working hours for a free initial conversation about your Kogarah site, the Georges River pathway and what it could cost to build.