Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

Home Extension Builders Ermington — Licensed NSW Builder

Extensions to 1950s–1970s + 2010s+ apartments-era homes in Ermington 2115 need structural sign-off, footings for the site and a careful join to the existing house. We engineer and document it properly.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Home extension build rates in Ermington: Ground floor $2,360–$2,840/m² + GST; first floor $3,790–$4,230/m² + GST (Rawlinsons Sydney). Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Buildana manages design, City of Parramatta Council approvals and construction, with a fixed-price contract once design and scope are set.

Extending Homes in Ermington

A home extension in Ermington grows the mid-century home between river and Metro — 450 to 700m² blocks where the wing adds what the 1950s-1970s plans never had.

The riverfront renewal has lifted the suburb's ceiling, the R3/R4 pockets get the zoning check, and the era fabric gets licensed handling.

The wing beats the friction of upsizing in a corridor still repricing upward.

We build these under NSW contractor licence 487805C. Get our extension scope, with the zoning checked, before you commit.

Buildana manages the complete home extension process in Ermington — from design consultation and structural engineering through to DA or CDC approval, and construction to handover, with a fixed-price contract once design and scope are set. Extend your home without the stress.

Read our Home Extension Cost Guide 2026 or explore extension approval pathways in NSW.

  • Rawlinsons Sydney rates: ground floor $2,360–$2,840/m² + GST, first floor $3,790–$4,230/m² + GST
  • City of Parramatta Council DA and CDC approvals managed
  • Ground floor, rear and second-storey additions
  • M — structural engineering included
  • 1950s–1970s + 2010s+ apartments-era homes assessed for extension suitability
  • Connect new to existing — clean, matched finish
  • 6-year structural warranty
  • Free design consultation — near Bus to Rydalmere (Parramatta Light Rail, 2 km) station
Home extension by Buildana in Ermington 2115
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

The corridor is repricing

Ermington's riverfront renewal and Metro access keep lifting the suburb's ceiling — and the extended mid-century home rides that repricing while the original compact plans do not.

The wing adds the open living and bedrooms the era never drew.

Zoning and era handled

The renewal pockets carry R3/R4 value checked before any big wing, and the era fabric gets licensed handling.

Zoning check and licensed removal are both costed into the fixed price.

Home extension builder in Ermington — key facts

Suburb
Ermington, NSW 2115
Council / LGA
City of Parramatta Council (City of Parramatta)
Primary zoning
R2 Low
Typical lot size
450–700m²
Soil class
M
Home era
1950s–1970s + 2010s+ apartments
Typical price range
Ground floor $2,360–$2,840/m² + GST; first floor $3,790–$4,230/m² + GST (Rawlinsons Sydney)
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period
Approval pathway
CDC for most rear extensions, DA for second-storey

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Concept design first — you see the plan before committing
City of Parramatta Council CDC for eligible ground-floor additions — a CDC must be decided within 20 days where neighbours are notified (10 days otherwise)
DA path for second-storey or non-complying designs — a DA has a 40-day assessment period
Construction programmed around liveability — staged weatherproofing
Second-storey works sequenced around the roof tie-in

How It Works

From First Call to Final Key

Walk through your Ermington home with our designer and structural engineer. We measure, photograph, and check the bones — footings, frame condition, roof structure.

⏱

Our designer works with your existing home's layout — connecting new living areas to existing rooms, matching materials and roof pitch, and maximising natural light. You approve floor plans and 3D renders before we proceed.

⏱

Most rear extensions in Ermington qualify for CDC — cleaner, faster, no neighbour notification. Second-storey additions typically need DA through City of Parramatta Council because of overshadowing and privacy assessments.

⏱

Extension built from new footings to completion — connecting structurally to your existing home. Class M soil design managed.

⏱

Walk through the completed extension, confirm finishes, collect your OC. NSW statutory warranties apply to eligible residential work, including work at the junction with the existing home.

⏱

Quality Promise

We extend Ermington homes with a structural engineer on every job. Second storey, rear addition, multi-room — engineered and priced upfront.

Fixed-price contract once design and scope are setNCC 2025 and BASIX compliantFull City of Parramatta Council complianceMatched old-to-new connectionWeekly progress updates6-year structural warranty

Cost Guide

ItemEstimated Range
Adding a master suite (1950s–1970s + 2010s+ apartments Ermington home)$2,360–$2,840/m² + GST
Ensuite for the new suite$37k–$42k inc GST
Second storey for teenagers/office$3,790–$4,230/m² + GST
Full rear + roof tie-in (entertainer's zone)Depends on roof tie-in and structure

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Ermington Extension — Free Consultation

Free design consultation for Ermington 2115. We'll assess your home and talk through extension options and the approval pathway, then provide a fixed-price contract once design and scope are set.

Start Your Project