Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Single-storey custom home with portico
Kirribilli 2061 · North Sydney

Kirribilli Home Builder — Custom Homes, KDR, Duplex

Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · North Sydney DA and CDC pathways

Kirribilli sits at the northern end of the Harbour Bridge — Kirribilli House (PM's residence) and Admiralty House (Governor-General) at the tip. Heritage Conservation Areas cover the entire suburb effectively. Substantial harbour fall on most streets. Sandstone-dominant; engineered foundations standard.

Around Kirribilli House, Admiralty House and Luna Park, Kirribilli lots vary street by street. North Sydney sets the local controls; the state codes decide whether a design can go the complying development route.

Council

North Sydney

Postcode

2061

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

DA assessment period

40 days (statutory)

Duplex minimum lot

Check the LEP

Low and Mid-Rise areas

8 nominated

Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.

Builder perspective

Building in Kirribilli: what gets checked first

Kirribilli (2061) is in the North Sydney local government area, so North Sydney Council sets the local planning controls and assesses any development application. Approval runs through North Sydney or a certifier: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise), and a DA has a 40-day assessment period. A knockdown rebuild, an extension or a granny flat each suit a different lot; which one fits Kirribilli depends on the house that's there now and what the planning certificate allows. Slope drives retaining walls, drainage and the slab design, which is why a detail survey comes before any design or price. Buildana is a Fairfield-based builder holding NSW contractor licence 487805C, and Oliver Alameri, with 15+ years' building experience, runs every job himself. If you're sitting on a Kirribilli block, or about to buy one, send the address and Oliver will tell you what's realistic on it and which checks come next.

OA

Oliver Alameri — Founder & licensed builder

Licence 487805C · 15+ years' building experience

Talk to Oliver

Kirribilli build context

What's known for Kirribilli, and the document that confirms each lot-specific fact before a price.

Council

North Sydney Council

Postcode

2061

Nearest station

Milsons Point

Local landmark

Kirribilli House, Admiralty House & Luna Park

Zoning

Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer

Lot area and frontage

Title plan, or a detail survey

Site classification (AS 2870)

Geotechnical report for the lot

Age of the house

Built before 1990? Asbestos inspection before demolition

Duplex minimum lot

Lot size map in the council's LEP

Low and Mid-Rise area

Milsons Point station (800m walk applies)

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

Why owners build with Buildana in Kirribilli

What every Buildana job includes, written down.

  • Licensed NSW builder (licence 487805C): the price comes as a written contract with an inclusions schedule, after plans, engineering and site checks.
  • North Sydney pathway explained plainly: a CDC from a certifier or the council if the design complies, a DA if it doesn't.
  • One point of contact: Oliver sequences the survey, geotechnical report, engineering and BASIX so each informs the next.
  • If the house was built before 1990, an asbestos inspection comes before demolition, and removal is by a SafeWork NSW licensed contractor.
  • Changes to the scope are agreed in writing before the work is done, as NSW home building law requires.
  • Anchored on the amanah principle: keeping the word given. Local landmark: Kirribilli House, Admiralty House & Luna Park. Nearest station: Milsons Point.

Kirribilli build costs from published rates

Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a Kirribilli lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.

Build typePublished rateBasis
Custom home, per m²$2,820–$4,250/m² + GSTRawlinsons individual house, brick veneer, medium to high finish.
Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²)single storey $565k–$980k + GST, double storey $735k–$1.27M + GSTAt $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra.
Duplex, attached four-bedroom pair$1.4M–$1.7M + GSTBoth dwellings, before site costs and subdivision.
Ground-floor addition, per m²$2,360–$2,840/m² + GSTRawlinsons ground floor addition, framed to brick veneer.
First-floor addition, per m²$3,790–$4,230/m² + GSTRawlinsons full first floor addition.
New bathroom in an addition$34k–$38k + GSTRawlinsons bathroom fit-out and services, each.
New kitchen in an addition$28k–$32k + GSTRawlinsons kitchen fit-out and services, each.
Granny flatFrom the catalogue price of the design you choose, plus site costsCatalogue designs carry their own published price.

Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.

Free Kirribilli feasibility

Thinking about building in Kirribilli? Start with the lot, not a sales pitch.

Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.

Written contract with an inclusions schedule Licence 487805C North Sydney DA and CDC pathways explained

Buildana services in Kirribilli

Six services across North Sydney, each priced for the lot once plans, engineering and site checks are done.

Knockdown Rebuild

The new house is costed from published Rawlinsons rates; demolition and site costs are confirmed for the lot before the contract.

Kirribilli knockdown rebuild approach

Duplex

Two homes on one lot with separate services, fire separation and sound insulation designed to the National Construction Code.

Kirribilli duplex approach

Granny Flat

A granny flat built as a proper home: its own kitchen, bathroom, BASIX certificate and statutory warranty.

Kirribilli granny flat approach

Custom Home

Architect-led design sized to the block, the streetscape and the brief, not a catalogue plan.

Kirribilli custom home approach

Extension

Extensions that tie into the existing roof line, brickwork and slab so the addition reads as part of the house.

Kirribilli extension approach

Renovation

Structural changes, waterproofing and finishes in one contract with a licensed builder.

Kirribilli renovation approach

Approval pathway in Kirribilli

Council: North Sydney Council.

The approval question on a Kirribilli build is whether the design complies with every clause of the Codes SEPP, or needs merit assessment by North Sydney. Complying development: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). Development application: a DA has a 40-day assessment period. Application fees are in North Sydney's fees and charges, and contributions depend on its contributions plans.

CDC pathway

Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.

DA pathway

North Sydney merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.

Local duplex minimum

Check North Sydney Council's local environmental plan and its lot size maps for the lot.

As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).

Low and Mid-Rise areas in North Sydney

Cremorne town centre, Crows Nest station, Milsons Point station, Neutral Bay town centre, Victoria Cross station, Waverton station, Wollstonecraft station, St Leonards station. Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). Milsons Point station is on the list; whether a Kirribilli lot is within an 800m walk of it is measured for each lot. Council rules compared

Granny flats

Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to North Sydney as a DA.

Kirribilli site considerations

Site costs in Kirribilli come from the lot, not the suburb. The footings depend on the site classification, which a geotechnical engineer sets under AS 2870 and the structural engineer designs to. Demolition depends on the existing house: if it was built before 1990, a licensed asbestos assessor confirms what's there before a licensed removalist takes it out.

Soil & footings

A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.

Demolition & asbestos

A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.

Flood, bushfire & heritage

These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.

What to check for a Kirribilli lot, and where

Kirribilli build FAQs

The questions that come up most often on a first Kirribilli site walk.

What decides the site costs on a Kirribilli block?
The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by North Sydney's tree controls and an arborist, stormwater by North Sydney's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.
How long does a custom home build take in Kirribilli?
The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a Kirribilli timeline is set once the design and the approval pathway are known.
Can I build a duplex in Kirribilli?
The local minimum lot size for a duplex is set in North Sydney Council's local environmental plan; the lot size map for the address shows it. As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. Milsons Point station is one of those areas. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
What's the granny flat pathway in Kirribilli?
Secondary dwellings in Kirribilli are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with North Sydney. The title, overlays and current controls are checked with the certifier or North Sydney before design.
What soil class is typical in Kirribilli?
There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
What does it cost to knock down and rebuild in Kirribilli?
For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
Do you do extensions and renovations in Kirribilli?
Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.
How long does a DA take with North Sydney?
NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through North Sydney or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in North Sydney's fees and charges.

Nearby North Sydney suburbs we build in

Other North Sydney suburbs, assessed by the same council: North Sydney Council.

Ready to talk about your Kirribilli build?

Oliver will respond within 4 working hours for a free initial conversation about your Kirribilli site, the North Sydney pathway and what it could cost to build.