Builders in Cabramatta West: Renovate the Old Red Brick
Old brick, good bones. Here's what's behind the walls.
Cabramatta West is full of solid red-brick homes from the 1960s to the 80s, a kilometre from the station on quiet R2 streets. Plenty of them are worth keeping. The trick is knowing what forty or fifty years has done to the parts you can't see.
Short answer
Should I renovate or knock down a 1960s brick house in Cabramatta West?
If it's double brick on sound footings, renovating usually makes sense, but budget for rewiring, new pipes and a sewer check after fifty-odd years. A brick ground-floor addition runs $1,835 to $1,980 per m² on Rawlinsons' Sydney schedule, with a kitchen adding $19,500 to $22,000. Knock down when layout, services and structure all need replacing at once.
Written and reviewed by Oliver Alameri
Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana
Fact-checked
Double brick or veneer? Knock on the wall.
The houses here split roughly by decade. A lot of the 1960s homes are full double brick: two skins of masonry carrying the roof, cool in summer and very hard to kill. By the late 70s and 80s most were brick veneer, a timber frame with a single brick skin tied to it.
It matters because it changes what renovation costs. Opening a double-brick wall for a wider doorway means a steel lintel, propping and a bit of dust. Moving a load-bearing wall in veneer is a different job entirely. I check which one you have on the first visit, usually by looking at the wall thickness at a window reveal.
Either way, the shell is rarely the problem. What fails in these houses is everything running through it.
The brick will outlast all of us. The wiring and the pipes won't.
What fifty years does to wiring, pipes and sewer
Pull the cover off a 1960s switchboard and you'll often find ceramic fuses and no safety switches. Any serious renovation brings the whole board up to current standard, and in older houses that usually means rewiring rooms as well. Budget for it from day one.
Plumbing tells a similar story. Galvanised steel water pipes corrode from the inside and lose pressure. The old sewer lines are often clay pipe, and a big gum or a jacaranda near the boundary will have sent roots through the joints years ago. A camera inspection costs very little and saves a lot of arguments later.
Then the roof. Original terracotta tiles tend to last; the battens, flashings and valleys under them sometimes haven't. We get up there before we quote.
- Switchboard and wiring condition, including whether safety switches exist at all
- Galvanised water pipes and pressure at the taps
- Sewer camera inspection from the boundary trap to the house
- Asbestos in eaves, wet-area walls and any fibro additions from the 70s

Is your house worth keeping? Let's find out.
I'll walk through it with you, check the services and the structure, and tell you honestly whether renovating, extending or adding a granny flat gives you the most for your money.
0476 300 300Extending a brick house so the join doesn't show
Most Cabramatta West owners want the same thing: a big open kitchen and family room across the back, opening to the yard. The original layout has a small kitchen and a closed-in back porch where that should be.
Rawlinsons prices a ground-floor addition of 75 to 125 square metres in full brick at $1,835 to $1,980 per square metre in Sydney, before a kitchen or bathroom. The new kitchen itself, cabinets plus plumbing and power, is another $19,500 to $22,000 on the same schedule. Those are shell figures, so demolition of the old porch, asbestos and any footing upgrade get priced once we've seen your site.
Matching old red brick is the part people underestimate. Exact matches from the 60s rarely exist now. We source blended or recycled reds that sit close, and accept the new work will look slightly fresh for a few years until it weathers in.

The granny flat that walks to the station
A kilometre from Cabramatta station is a real selling point for a tenant. A two-bedroom granny flat in 2166 rents for about $380 to $500 a week, and a lot of these blocks have the depth to fit one behind the house without losing the whole yard.
On lots of 450m² or more, a granny flat up to 60m² can usually be approved as complying development under the Housing SEPP, which Fairfield certifiers turn around in weeks rather than months. Parts of the suburb near the creek corridor carry flood mapping, so we check the planning certificate before we draw anything.

Before you renovate in Cabramatta West
The walk-through takes about an hour. These are the things I'm looking at while I'm there.
- 01
Double brick or brick veneer, which decides how freely we can move walls
- 02
Age and state of the switchboard, wiring and any safety switches
- 03
Water pressure and whether galvanised pipes are still in the walls
- 04
A sewer camera run to find root damage before new bathrooms connect to it
- 05
Roof battens, flashings and valleys under the original tiles
- 06
Room behind the house for a granny flat, and any flood mapping on the lot
What Cabramatta West owners ask me
Should I renovate or knock down my 1960s brick house?
If it's double brick with a sound roof, renovating and extending is usually the better value. If the plan is wrong in every room and the services all need replacing, a rebuild can make more sense. I'll give you both numbers side by side.
Do I need to rewire an old house when renovating?
In most 1960s and 70s houses, yes, at least partly. New kitchens, air conditioning and extensions add load that the original board and wiring were never designed for, and the switchboard has to meet current safety standards.
Can I build a duplex in Cabramatta West?
It's mainly R2 low density here, where a dual occupancy depends on the lot's area and frontage under current rules. Some blocks qualify and some don't. We check yours against the controls before anyone draws a plan.
How close is Cabramatta West to the station?
Most of the suburb is within about a kilometre of Cabramatta station, which is why granny flats and rentals here stay in demand.
Sources and references
Costs are from the Rawlinsons handbook with the local cost index applied; rules and timeframes are checked against the sources below.
- Fairfield City Council
- Rawlinsons Australian Construction Handbook, Rawlhouse Publishing
- State Environmental Planning Policy (Exempt and Complying Development Codes) 2008
- State Environmental Planning Policy (Housing) 2021
- Asbestos, SafeWork NSW
- NSW Planning Portal Spatial Viewer (zoning, FSR and hazard maps)
Keep the brick. Fix what's inside it.
An hour on site is enough for me to tell you what your Cabramatta West house needs, what it will cost, and whether it's worth doing at all.