Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Single-storey custom home with portico
Smithfield 2164 · Fairfield

Smithfield Home Builder — Custom Homes, Knockdown Rebuild, Duplex

Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · Fairfield DA and CDC pathways

Smithfield features a mix of residential streets and the adjacent Smithfield–Wetherill Park industrial area. Residential blocks are well-sized for knockdown rebuilds and custom homes.

Around Smithfield RSL and Stockland Wetherill Park, Smithfield lots vary street by street. Fairfield City sets the local controls; the state codes decide whether a design can go the complying development route.

What happens next: send the address and a rough brief to start a free initial conversation.

Council

Fairfield City

Postcode

2164

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

Most local DAs

40-day deemed-refusal period

Duplex minimum lot

Mapped in the LEP

Low and Mid-Rise areas

3 nominated

Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index. DA period: most local DAs have a 40-day assessment period before deemed refusal may be appealed, not a decision deadline.

Builder perspective

Building in Smithfield: what gets checked first

Smithfield (2164) is in the Fairfield local government area, so Fairfield City Council sets the local planning controls and assesses any development application. Approval runs through Fairfield City or a certifier: a CDC generally has a 20-day determination period where statutory neighbour notification applies, or 10 days otherwise; eligible Pattern Book applications have a 10-day period even where notification applies, and most local DAs have a 40-day assessment period before deemed refusal may be appealed, not a decision deadline. A knockdown rebuild, an extension or a granny flat each suit a different lot; which one fits Smithfield depends on the house that's there now and what the planning certificate allows. If the existing house was built before 1990 it may contain asbestos; a licensed assessor confirms what's there, and a licensed removalist takes it out before demolition. Buildana is a Fairfield-based builder holding NSW contractor licence 487805C, and Oliver Alameri, with 15+ years' building experience, runs every job himself. If you're sitting on a Smithfield block, or about to buy one, send the address and Oliver will tell you what's realistic on it and which checks come next.

OA

Oliver Alameri — Founder & licensed builder

Licence 487805C · 15+ years' building experience

Check my Smithfield site

Smithfield build context

What's known for Smithfield, and the document that confirms each lot-specific fact before a price.

Council

Fairfield City Council

Postcode

2164

Nearest station

Fairfield

Local landmark

Smithfield RSL & Stockland Wetherill Park

Zoning

Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer

Lot area and frontage

Title plan, or a detail survey

Site classification (AS 2870)

Geotechnical report for the lot

Age of the house

Built before 1990? Asbestos inspection before demolition

Duplex minimum lot

Mapped in the LEP

Low and Mid-Rise area

Fairfield station and town centre (800m walk applies)

Median house rent, Fairfield (DCJ)

1 bed $420/wk · 2 bed $550/wk

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

Why owners build with Buildana in Smithfield

What every Buildana job includes, written down.

  • Licensed NSW builder (licence 487805C): the price comes as a written contract with an inclusions schedule, after plans, engineering and site checks.
  • Fairfield City pathway explained plainly: a CDC from a certifier or the council if the design complies, a DA if it doesn't.
  • One point of contact: Oliver sequences the survey, geotechnical report, engineering and BASIX so each informs the next.
  • If the house was built before 1990, an asbestos inspection comes before demolition, and removal is by a SafeWork NSW licensed contractor.
  • Changes to the scope are agreed in writing before the work is done, as NSW home building law requires.
  • Anchored on the amanah principle: keeping the word given. Local landmark: Smithfield RSL & Stockland Wetherill Park. Nearest station: Fairfield.

Smithfield build costs from published rates

Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a Smithfield lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.

Build typePublished rateBasis
Custom home, per m²$2,820–$4,250/m² + GSTRawlinsons individual house, brick veneer, medium to high finish.
Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²)single storey $565k–$980k + GST, double storey $735k–$1.27M + GSTAt $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra.
Duplex, attached four-bedroom pair$1.4M–$1.7M + GSTBoth dwellings, before site costs and subdivision.
Ground-floor addition, per m²$2,360–$2,840/m² + GSTRawlinsons ground floor addition, framed to brick veneer.
First-floor addition, per m²$3,790–$4,230/m² + GSTRawlinsons full first floor addition.
New bathroom in an addition$34k–$38k + GSTRawlinsons bathroom fit-out and services, each.
New kitchen in an addition$28k–$32k + GSTRawlinsons kitchen fit-out and services, each.
Granny flatFrom the catalogue price of the design you choose, plus site costsCatalogue designs carry their own published price.

Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.

Free Smithfield feasibility

Thinking about building in Smithfield? Start with the lot, not a sales pitch.

Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.

Written contract with an inclusions schedule Licence 487805C Fairfield City DA and CDC pathways explained

Buildana services in Smithfield

Six services across Fairfield, each priced for the lot once plans, engineering and site checks are done.

Knockdown Rebuild

The new house is costed from published Rawlinsons rates; demolition and site costs are confirmed for the lot before the contract.

Smithfield knockdown rebuild approach

Duplex

Two homes on one lot with separate services, fire separation and sound insulation designed to the National Construction Code.

Smithfield duplex approach

Granny Flat

A granny flat built as a proper home: its own kitchen, bathroom, BASIX certificate and statutory warranty.

Smithfield granny flat approach

Custom Home

Architect-led design sized to the block, the streetscape and the brief, not a catalogue plan.

Smithfield custom home approach

Extension

Extensions that tie into the existing roof line, brickwork and slab so the addition reads as part of the house.

Smithfield extension approach

Renovation

Structural changes, waterproofing and finishes in one contract with a licensed builder.

Smithfield renovation approach

Approval pathway in Smithfield

Council: Fairfield City Council.

The approval question on a Smithfield build is whether the design complies with every clause of the Codes SEPP, or needs merit assessment by Fairfield City. Complying development: a CDC generally has a 20-day determination period where statutory neighbour notification applies, or 10 days otherwise; eligible Pattern Book applications have a 10-day period even where notification applies. Development application: most local DAs have a 40-day assessment period before deemed refusal may be appealed, not a decision deadline. Application fees are in Fairfield City's fees and charges, and contributions depend on its contributions plans.

CDC pathway

Council or private certifier. Under the EP&A Regulation, a CDC generally has a 20-day determination period where statutory neighbour notification applies, or 10 days otherwise; eligible Pattern Book applications have a 10-day period even where notification applies. The design must meet every standard of the codes.

DA pathway

Fairfield City merit assessment. Under the EP&A Regulation, most local DAs have a 40-day assessment period before deemed refusal may be appealed, not a decision deadline. Used where the design needs to flex.

Local duplex minimum

As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).

Low and Mid-Rise areas in Fairfield

Cabramatta station and town centre, Canley Vale station, Fairfield station and town centre. For eligible dual-occupancy proposals within an 800m walk of a nominated Low and Mid-Rise area, 450m² and 12m are non-refusal standards for lot area and width. Zoning, exclusions and other controls still apply, and these standards do not guarantee approval (NSW Planning). Fairfield station and town centre is on the list; whether a Smithfield lot is within an 800m walk of it is measured for each lot. Council rules compared

Granny flats

Under Housing SEPP 2021, Schedule 1, complying development generally needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². The lot-size requirement has an exception where the secondary dwelling is entirely within an existing house; other applicable standards still apply. If the proposal does not meet every CDC requirement, a DA with Fairfield City may still be possible. Read the granny flat lot-size guide.

Smithfield site considerations

Site costs in Smithfield come from the lot, not the suburb. The footings depend on the site classification, which a geotechnical engineer sets under AS 2870 and the structural engineer designs to. Demolition depends on the existing house: if it was built before 1990, a licensed asbestos assessor confirms what's there before a licensed removalist takes it out.

Worker setting timber formwork for a footing in a red clay trench
Design inspiration / Not a Buildana project

Soil & footings

A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.

Black-and-white view of danger asbestos hazard tape across temporary mesh fencing, with a house and trees behind
Design inspiration / Not a Buildana project

Demolition & asbestos

A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.

Scale rule resting on a site plan marked with a proposed building outline
Design inspiration / Not a Buildana project

Flood, bushfire & heritage

These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.

What to check for a Smithfield lot, and where

Free initial conversation

Check my Smithfield site

Send the address and a rough brief to start a free initial conversation about the Fairfield City approval pathway, the checks the lot may need and published cost rates. A written price follows once plans, engineering and site checks are done.

  • Read against your block, not a brochure: zoning, slope and council controls first
  • NSW contractor licence 487805C
  • A free initial conversation. No sales pressure.
Prefer to talk? 0476 300 300

No obligation. We only use your details to respond to this enquiry.

Smithfield build FAQs

The questions that come up most often on a first Smithfield site walk.

Can I build a duplex in Smithfield?
Fairfield LEP 2013, cl 4.1A: Set by the Lot Size for Dual Occupancy Development Map, so it varies by area. As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, for eligible dual-occupancy proposals within an 800m walk of a nominated Low and Mid-Rise area, 450m² and 12m are non-refusal standards for lot area and width. Zoning, exclusions and other controls still apply, and these standards do not guarantee approval. Fairfield station and town centre is one of those areas. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
What's the granny flat pathway in Smithfield?
Secondary dwellings in Smithfield are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development generally needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². The lot-size requirement has an exception where the secondary dwelling is entirely within an existing house; other applicable standards still apply, including setbacks, site coverage and landscaping where applicable. If every CDC requirement is not met, a DA with Fairfield City may still be possible. The title, overlays and current controls are checked with the certifier or Fairfield City before design.
What soil class is typical in Smithfield?
There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
What does it cost to knock down and rebuild in Smithfield?
For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
Do you do extensions and renovations in Smithfield?
Yes: ground-floor and first-floor additions and larger home renovations, including kitchens and bathrooms within the wider project rather than as standalone room-only jobs. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.
How long does a DA take with Fairfield City?
NSW law sets the clock: most local DAs have a 40-day assessment period before deemed refusal may be appealed, not a decision deadline, and a CDC generally has a 20-day determination period where statutory neighbour notification applies, or 10 days otherwise; eligible Pattern Book applications have a 10-day period even where notification applies for complying development through Fairfield City or a private certifier. Neither period guarantees approval or a decision by a particular date; requests for more information, referrals and design changes can add time. Application fees are in Fairfield City's fees and charges.
What decides the site costs on a Smithfield block?
The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by Fairfield City's tree controls and an arborist, stormwater by Fairfield City's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.
What do small houses rent for in Fairfield?
NSW DCJ Rent and Sales Report, new bonds lodged April to June 2026, houses in Fairfield: one bedroom $420 a week (a small sample: DCJ flags 30 or fewer new bonds); two bedrooms $550 a week (97 new bonds). DCJ doesn't report granny flats separately; small houses are the nearest category.
How long does a custom home build take in Smithfield?
The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC generally has a 20-day determination period where statutory neighbour notification applies, or 10 days otherwise; eligible Pattern Book applications have a 10-day period even where notification applies; most local DAs have a 40-day assessment period before deemed refusal may be appealed, not a decision deadline. Design, engineering and requests for more information add time before either clock runs, so a Smithfield timeline is set once the design and the approval pathway are known.

Rents: NSW DCJ Rent and Sales Report, April to June 2026.

Ready to talk about your Smithfield build?

Oliver will respond within 4 working hours for a free initial conversation about your Smithfield site, the Fairfield City pathway and what it could cost to build.