Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

White contemporary home with clean lines beside mature trees and a green lawn

St Johns Park 2176 · Fairfield City

Builders in St Johns Park: Building Around Big Trees

That gum tree out the back has more say in your design than you think.

St Johns Park grew up in the 1970s and 80s, and so did its trees. Fifty years on, a lot of blocks have a eucalypt, a jacaranda or a big brush box right where the new house wants to go. Keep it or remove it, it needs planning, and sometimes council's permission.

Postcode
2176
Built
1970s–1980s
Blocks
450–700m²
Tree zone rule
12 × trunk diameter

Short answer

Can I build near, or remove, a big tree in St Johns Park?

Removing a significant tree normally needs Fairfield Council's permission, often with replacement planting. Keeping it means working around a tree protection zone of about 12 times the trunk diameter, which limits digging and footings close by. Sort the tree before design starts. A mid-spec rebuild is about $2,820–$3,040/m² excluding GST on Rawlinsons' Sydney rate.

Written and reviewed by

Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana

Fact-checked

Can I just cut it down?

Often, no. Fairfield Council protects many trees on private land, and removing or heavily pruning a protected one without approval can mean a fine. Size, species and location all matter, and the rules sit in council's tree management controls.

If the tree is in the way of a new house that needs a DA, removal can be dealt with inside the DA. For complying development, the certifier can't approve tree removal, so a separate permit from council is usually needed first. Leaving that until the week before demolition stalls the whole job.

Neighbour's tree overhanging the boundary? Its roots and canopy still count. We have to design around them too.

Sort the tree before the excavator is booked, not the week after.
Demolition rubble on a suburban street with a large bare tree left standing among houses
A retained tree needs protecting from the first day of demolition, not just during the build.

Keeping it: what a tree protection zone means

If the tree stays, an arborist measures it and sets out zones under the Australian Standard for protecting trees on development sites, AS 4970. The tree protection zone has a radius of twelve times the trunk diameter, measured at chest height.

So a tree with a 50cm trunk has a protection zone of six metres around it. Inside that zone, digging, trenching and slab work are restricted. A small encroachment is usually acceptable. A big one needs the arborist to show the tree will survive, often with root investigation.

It shapes the design. The slab might stop short. Footings near the tree might switch to piers that bridge the roots. Services get rerouted so the plumber isn't trenching through the root plate.

  • Arborist report identifying the species, health and protection zones
  • Fencing around the protection zone before demolition starts
  • Piered footings or a stepped-back slab near roots
  • Services routed around the root zone
  • No storage of bricks, soil or machinery under the canopy

Big tree, tight block? Let's plan around it.

Send me your St Johns Park address and a photo of the tree. I'll tell you whether it's likely protected, how it affects the design, and what an arborist will need to look at.

0476 300 300

No obligation. We only use your details to respond to this enquiry.

Removing it: permits, replacement and cost

If removal is the right call, council may require a replacement tree somewhere on the lot. Plan for it in the landscape design so it doesn't end up jammed against the new house.

Removal of a big tree on a suburban block needs a qualified arborist crew, often with a crane or a cherry picker if access is tight. We get a quote once the permit is in hand and put it in the contract as its own line.

Stumps matter too. A large stump left in the ground rots, and the void becomes a soft spot under a slab. Grinding and backfilling with compacted material goes in the site preparation price.

Builder working high on a timber house frame with tall trees rising behind the structure
With the tree planned for early, framing goes ahead without surprises.

The rest of a St Johns Park rebuild

Most homes here are 1970s and 80s brick veneer, often single storey. Families typically replace them with a two-storey home that keeps a proper backyard, which also makes it easier to keep a good tree.

Expect reactive clay, and a slab designed from a geotech report. Where a tree has been removed, the engineer also considers how the ground will recover moisture over the following years, because that can move a slab.

For budgeting, the Rawlinsons Sydney rate for a medium-finish brick veneer house, escalated to the ABS September 2026 index, is about $2,820–$3,040/m² excluding GST. Tree work, demolition and asbestos are extra lines, priced before you sign.

Tree questions to answer before design

Six things to know about every significant tree near the build.

  1. 01

    Species, height and trunk diameter of each tree near the house footprint

  2. 02

    Whether council's controls protect it, and what approval is needed

  3. 03

    Neighbouring trees whose roots or canopy cross the boundary

  4. 04

    The tree protection zone radius, from an arborist report

  5. 05

    Whether removal needs a replacement planting

  6. 06

    Access for a removal crew if the tree has to go

St Johns Park questions

St Johns Park postcode?

It's 2176, part of Fairfield City, between Bonnyrigg, Greenfield Park, Canley Heights and Wakeley.

Do I need permission to remove a tree in St Johns Park?

Frequently, yes. Fairfield Council protects many trees on private land. For a DA the removal can be assessed with the application. For complying development, you'll usually need a separate council permit before work starts.

Can I build close to a big tree?

Sometimes. An arborist sets the tree protection zone, which is twelve times the trunk diameter as a radius. A minor encroachment is usually fine. More than that needs design changes like piered footings and an arborist's sign-off.

Does removing a tree affect my new slab?

It can. Clay soil around a removed tree can swell as it regains moisture. The engineer accounts for that when designing the slab, which is another reason to get the geotech after the tree plan is settled.

A good tree is worth designing around.

And when one has to go, it's worth doing properly. Either way, it starts with a look at your St Johns Park block.