
Russell Lea 2046 · City of Canada Bay
Custom Home Builders Russell Lea
Design and build means one contract, and one builder answerable from the first sketch to the keys.
Canada Bay's Bay Run history notes that Russell Lea was once an estate, Dunmore Park, later Woodsdown Park and then Russell Lea. Most people who reach this page are searching for design and build. So here is what that contract covers, step by step, including the part many owners forget: the house that's already on the lot.
Short answer
What does a design and build home builder do in Russell Lea?
One builder takes the home from brief to handover under one contract: survey, design, engineering, BASIX, approval by complying development or a Canada Bay DA, demolition of the existing house and construction. You deal with one licensed builder throughout. The price firms up as the design and site investigations are completed, not at the first meeting.
Written and reviewed by Oliver Alameri
Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana
Fact-checked
What one contract covers
With design and build, you don't hire a designer, then an engineer, then go looking for a builder to price someone else's drawings. One contract runs the whole job, and the builder who draws the house is the one who has to build it. That keeps the design honest about cost.
At Buildana that builder is Oliver Alameri, licensed in NSW (487805C), with 15+ years' building experience. You deal with him from the first site visit to handover.
- Survey and planning certificate
- Concept design, priced as it develops
- Engineering, BASIX and documentation
- Approval: complying development or a DA
- Demolition of the existing house
- Construction, inspections and handover
The builder who draws the house should be the one who has to build it.
The house that's already there
If the lot has a house on it, demolition is part of the approval, not a separate job to sort out later. It can be approved with the new home as complying development, or in the DA to Canada Bay.
Before anything comes down, older houses need an asbestos check. Asbestos has to be removed by a licensed removalist, and the services are disconnected before the house is demolished. Neighbours are told in writing before a complying development certificate is issued and before work starts.

Planning a new home in Russell Lea?
Send the address and what you want to build. Oliver will respond within 4 working hours for a free initial conversation.
0476 300 300Getting it approved in Canada Bay
If the lot is zoned R1, R2, R3, R4 or RU5, is at least 200m² and 6m wide, and the design meets every standard in the Housing Code, a certifier can approve it as complying development, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). Miss one standard and it's a DA.
Heritage items and conservation areas are listed in Schedule 5 of the Canada Bay Local Environmental Plan 2013. A heritage-affected lot means a DA. Once lodged, a DA has a 40-day assessment period. Either way, the house needs a BASIX certificate and must reach the 7-star NatHERS minimum that has applied to new homes since 1 October 2023.
Cost and build time
Rawlinsons gives $2,820–$3,040/m² for a medium-finish brick veneer individual house in Sydney, and $2,940–$3,170/m² in full brick, excluding GST, escalated to the ABS September 2026 index. Demolition, site works, services and landscaping are added once the lot has been inspected.
For timing, the ABS average build for a new NSW house was 2.99 quarters in 2025-26. Approval comes before that, and design before approval.
What I check first in Russell Lea
Before the first sketch, these set the brief.
- 01
Zoning and heritage status on the planning certificate
- 02
Lot area and width against the Housing Code
- 03
The existing house: asbestos, services and access for demolition
- 04
Fall across the lot and where stormwater drains
- 05
Your brief: rooms, levels and how you'll use the yard
- 06
Which approval route the design should aim for
Design and build in Russell Lea
What's the difference between design and build and design and construct?
Nothing that matters to you. Both mean one contract with one builder for the design, approval and construction.
Is design and build cheaper than using an architect?
Not automatically. Its advantage is that each design decision is priced as it's made, so the drawings don't outgrow the budget before a builder sees them.
Can you demolish my existing house?
Yes, as part of the same job. Demolition is approved with the new home, after an asbestos check and disconnection of the services.
How long does a new home take in Russell Lea?
Design and approval come first. For a complying development certificate, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. For construction, the ABS average build for a new NSW house was 2.99 quarters in 2025-26.
Who will I deal with?
Oliver Alameri, the licensed builder. Buildana was founded in 2025, the studio is in Fairfield, and Oliver builds across Sydney.
Sources and references
Costs are from the Rawlinsons handbook with the local cost index applied; rules and timeframes are checked against the sources below.
- City of Canada Bay
- Rawlinsons Australian Construction Handbook, Rawlhouse Publishing
- Environmental Planning and Assessment Act 1979 (NSW)
- State Environmental Planning Policy (Exempt and Complying Development Codes) 2008
- BASIX, NSW Planning Portal
- Asbestos, SafeWork NSW
- Building or renovating a home, NSW Government
- Search heritage databases, NSW Environment and Heritage
- Nationwide House Energy Rating Scheme (NatHERS)
- NSW Planning Portal Spatial Viewer (zoning, FSR and hazard maps)
One contract, start to finish
Tell Oliver about the lot and the home you want. Oliver will respond within 4 working hours for a free initial conversation.