Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

Duplex Builders Longueville — Licensed Dual Occupancy Builders

NSW licensed duplex builder in Longueville 2066: design, Lane Cove Council approvals, construction, and coordination of Torrens or strata subdivision where the lot qualifies.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Building a duplex in Longueville costs $1.4M–$1.7M + GST for an attached four-bedroom pair, before site costs; demolition, Lane Cove Council contributions, subdivision and land are extra. Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Buildana manages feasibility, approvals, construction and subdivision, with a fixed-price contract once design and scope are set.

Longueville Dual Occ. — Feasibility to Handover

A duplex in Longueville is rarely the play, because near-total heritage coverage and a premium harbour market favour a single home. This harbour-fall peninsula on Tambourine Bay and Woodford Bay runs Federation mansions and inter-war heritage on 600 to 1,400m2 blocks with substantial fall to the water, and Heritage Conservation Areas cover most streets, so a dual-occupancy is constrained or precluded on contributory lots. A single premium residence usually returns more than splitting a block.

The sandstone-dominant soil and harbour fall mean deep rock and engineered retaining, so a duplex spreads a high site cost across two footprints. I would rather give you the honest read than push the wrong product. Where the existing home carries fibro a licensed asbestos strip-out comes first.

What I would check first on your Longueville block: the heritage status, whether a single premium home is the clear best use, and the deep rock and harbour-fall retaining. That decides the direction.

We build these under NSW contractor licence 487805C. Send me the address and I will tell you honestly what the block suits.

Buildana manages the full duplex development process in Longueville — from feasibility assessment and architectural design through to DA or CDC approval, and construction to dual handover, under a fixed-price contract once design and scope are set. One builder, one contract, two homes.

Read our Complete Duplex Building Guide or explore our duplex builders in Sydney service and completed projects.

  • Build cost $1.4M–$1.7M + GST for an attached four-bedroom pair, before site costs
  • Lane Cove Council DA and CDC approvals managed
  • R2 and R3 zones — established dual occ. provisions
  • Low and Mid-Rise Housing Policy: lots from 450m² and at least 12m wide
  • M — engineered dual-slab design included
  • Strata or Torrens title subdivision available
  • 6-year structural warranty per dwelling
  • Free feasibility check — near Wollstonecraft (4 km, ferry) station
Side-by-side duplex construction in Longueville — R2 Low Density
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

Heritage and premium harbour

This harbour-fall peninsula runs Federation mansions and inter-war heritage on 600 to 1,400m2 blocks with substantial harbour fall.

Conservation Areas cover most streets, so a dual-occupancy is constrained or precluded.

Deep rock and retaining

The sandstone-dominant soil and harbour fall mean deep rock and engineered retaining across both dwellings.

A duplex spreads a high site cost across two footprints, with older fibro stripped under licence first.

Duplex builder in Longueville — key facts

Suburb
Longueville, NSW 2066
Council / LGA
Lane Cove Council (Lane Cove)
Primary zoning
R2 Low Density
Typical lot size
600–1,400m²
Soil class
M
Home era
1880s–1940s heritage
Typical price range
$1.4M–$1.7M + GST for an attached four-bedroom pair, before site costs
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26
Approval pathway
CDC for compliant dual-occupancy, else DA

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Feasibility first — a yes/no before you spend real money on design
Design and engineering run as a single dual-package, not two separate jobs
Lane Cove Council DA or CDC lodged once for both dwellings
Dual slab poured in a single site mobilisation — no second set-up
Trade crews sized for dual build — roofers, plasterers, tilers don't bottleneck
Dual handover together — both titles ready to settle or lease

How It Works

From First Call to Final Key

Free feasibility check on your Longueville block. We measure frontage width, confirm zoning (R2 Low Density), check minimum lot size against 550m² requirement, and review Lane Cove Council's DCP controls.

⏱

Two dwellings, one site — design is mostly about geometry. Frontage split, party wall position, garage stacking, private courtyard size, and the streetscape elevation a certifier will actually approve.

⏱

DA through Lane Cove Council or CDC. Under the EP&A Regulation, a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise).

⏱

Both dwellings go up together — as a guide, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26.

⏱

Two homes, two titles, two OCs, two warranty packs. We hand over a clean documentation set per dwelling: certifier reports, BASIX certs, structural sign-offs, appliance warranties, maintenance schedules.

⏱

Quality Promise

Every Buildana duplex in Longueville is built under a fixed-price contract — feasibility through to dual handover and subdivision.

Fixed-price contract once design and scope are setNCC 2025 and BASIX compliantFull Lane Cove Council complianceStrata or Torrens title subdivisionWeekly progress updates6-year structural warranty per dwelling

Cost Guide

ItemEstimated Range
Vacant R2/R3 block in Longueville (build)$1.4M–$1.7M + GST for an attached four-bedroom pair
KDR duplex (demolish 1880s–1940s heritage home + build both)Build cost plus demolition, asbestos and service disconnections
Torrens title, to sell or refinance one sideDepends on survey, council and service authority requirements
Corner block / dual-frontage designPriced per site

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Longueville Dual Occupancy — Free Feasibility

Free duplex feasibility assessment for Longueville 2066. We'll check your block against the planning rules and explain the approval pathway and build costs.

Start Your Project