Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

Duplex Builders Mortlake — Dual Occupancy Design & Build

Two homes on one lot in Mortlake 2137, where the zoning, lot size and frontage allow. Build allowance: $1.4M–$1.7M + GST for an attached four-bedroom pair, before site costs.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300

Dual Occupancy Developments in Mortlake

A duplex in Mortlake works on the larger lots that clear the Canada Bay 600m2 minimum and sit off the heritage streets. This riverside suburb adjacent to Breakfast Point runs Federation cottages, inter-war heritage, post-war stock and contemporary on 400 to 800m2 blocks, and a Torrens-title duplex on a qualifying lot is a strong play with a ferry connection to Putney. Heritage Conservation Areas cover several streets, so the status check comes first.

The ground is Wianamatta Shale, so footings get stable bearing and a slab off geotech is routine on both dwellings. On a qualifying non-heritage lot a side-by-side works cleanly, and some smaller lots fall short of 600. Where older homes carry fibro a licensed asbestos strip-out comes first.

What I would check first on your Mortlake block: whether it clears the 600m2 minimum, the heritage status, and the frontage. Those set the dual-occ.

We build these under NSW contractor licence 487805C. Send me the block and I will tell you what dual-occupancy it carries.

Buildana manages the full duplex development process in Mortlake — from feasibility assessment and architectural design through to DA or CDC approval, and construction to dual handover, under a fixed-price contract once design and scope are set. One builder, one contract, two homes.

Read our Complete Duplex Building Guide or explore our duplex builders in Sydney service and completed projects.

  • Build cost $1.4M–$1.7M + GST for an attached four-bedroom pair, before site costs
  • City of Canada Bay Council DA and CDC approvals managed
  • R2 and R3 zones — established dual occ. provisions
  • Low and Mid-Rise Housing Policy: lots from 450m² and at least 12m wide
  • M–H — engineered dual-slab design included
  • Strata or Torrens title subdivision available
  • 6-year structural warranty per dwelling
  • Free feasibility check — near North Strathfield (2 km) / Mortlake ferry to Putney station
Fixed-price duplex in Mortlake near Mortlake ferry wharf
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

Feasibility against 600m2

This riverside suburb adjacent to Breakfast Point runs Federation, inter-war, post-war and contemporary stock on 400 to 800m2 blocks.

A Torrens-title duplex on a qualifying lot off the heritage streets is a strong play, with a ferry to Putney.

Stable ground, heritage check

The Wianamatta Shale gives footings stable bearing, so a slab off geotech is routine on both dwellings.

Heritage sits on several streets, so the status check comes first, with older fibro stripped under licence.

Duplex builder in Mortlake — key facts

Suburb
Mortlake, NSW 2137
Council / LGA
City of Canada Bay Council (City of Canada Bay)
Primary zoning
R2 Low
Typical lot size
400–800m²
Soil class
M–H
Home era
1900s–1960s
Typical price range
$1.4M–$1.7M + GST for an attached four-bedroom pair, before site costs
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26
Approval pathway
CDC for compliant dual-occupancy, else DA

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Quality Promise

Buildana delivers Mortlake duplexes as a single project — one contractor accountable from site check to subdivision.

Fixed-price contract once design and scope are setNCC 2025 and BASIX compliantFull City of Canada Bay Council complianceStrata or Torrens title subdivisionWeekly progress updates6-year structural warranty per dwelling

How It Works

From First Call to Final Key

A duplex is really a feasibility problem wearing a construction outfit. Before anything else, we verify your Mortlake block against City of Canada Bay Council's LEP — lot size, frontage, FSR, landscape area. If it doesn't stack up, you find out before design starts, not after paying for a full design.

⏱

Design runs dual from day one. Two dwellings, one coherent streetscape, party-wall acoustics and fire rating built into the structure rather than bolted on. The plan accommodates R2 Low zoning without looking like two mismatched houses sharing a fence.

⏱

Approval and construction get sequenced together. Slab pours are choreographed so the trades show up once, frame up both sides, and keep rolling. Two separate meters, two separate services, but one crew, one programme.

⏱

Handover is dual. Both dwellings walked at the same time, both OCs in the same issue, both titles subdivided before settlement. You leave the final inspection with the option to live in one and rent the other, or to sell both.

⏱

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Mortlake Dual Occupancy — Free Feasibility

Free duplex feasibility assessment for Mortlake 2137. We'll check your block against the planning rules and explain the approval pathway and build costs.

Start Your Project