Bathroom Renovations in Blacktown: What's Behind the Tiles

A new bathroom is two weeks of work you'll never see, then a week you will.

Tiles and tapware get all the attention. What decides whether a Blacktown bathroom lasts twenty years is the part behind them: the old wall linings, the pipes, the falls to the waste and the membrane under the floor. Get those right and the pretty part is easy.

Housing
1960s–1980s brick veneer
Bathroom fit-out
$23,500–$26,500 (Rawlinsons)
Time on site
About 3–5 weeks
Waterproofing
Licensed waterproofer

Short answer

How much does a bathroom renovation cost in Blacktown?

Rawlinsons' Sydney schedule puts a medium-standard bathroom, fixtures, tiling and plumbing included, at $23,500 to $26,500. Older Blacktown homes can add asbestos removal, new pipework or a relocated waste. Expect about three to five weeks on site. Like-for-like internal renovations are often exempt from approval, but the waterproofing should be applied by a licensed waterproofer and photographed before tiling.

Written and reviewed by

Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana

Fact-checked

What comes out of a 1970s bathroom

The tiles are the easy bit. Behind them, in a house built before about 1990, the wall lining is often fibre cement sheet that may contain asbestos. It gets tested before demolition. A positive result means licensed removal, sealed disposal and a clearance certificate before anyone else works in the room.

Under the floor, the original shower may have had nothing more than a mortar bed and hope. Galvanised supply lines rust shut over fifty years. Cast iron or earthenware waste pipes crack. Once the room is stripped, we see all of it.

Better now than in three years through the kitchen ceiling.

  • Wall linings tested for asbestos before demolition
  • Old galvanised pipes replaced with modern pipework
  • Waste pipes checked and replaced where cracked
  • Floor structure inspected once the tiles are up
Every bathroom leak I've fixed started with a membrane someone couldn't see.

Falls, membranes and the licence that matters

Water has to run to the waste, not the door. The floor bed gets screeded with a consistent fall, and for a step-free shower we either set the floor down or use a linear drain along one edge.

Then the membrane. The Australian Standard for wet-area waterproofing sets where it goes and how high it turns up the walls. We use a waterproofer licensed in NSW for that work, and we photograph the membrane before a single tile goes on.

An exhaust fan ducted outside the roof space finishes the job. Steam trapped in the ceiling is how mould gets started.

Wall-hung timber vanity with a stone top, round mirror and brushed tapware
Buildana bathroom, Smart Street, Fairfield Heights.

Want a real price for your bathroom?

Send me your Blacktown address and a couple of photos of the bathroom as it is. I'll tell you what's likely behind the tiles and what a proper renovation would cost.

0476 300 300

No obligation. We only use your details to respond to this enquiry.

How long, and in what order

Week one: strip-out and any asbestos work. Week two: plumbing and electrical rough-in, new linings, screed. Then membrane and cure, tiling, and fit-off of the vanity, toilet, tapware and screens. Three to five weeks is typical for a single bathroom, depending on what the strip-out reveals and whether anything moves.

Moving the toilet or shower changes the drainage, which can mean cutting the slab in a Blacktown house built on one. It's doable. It adds cost and time, so decide early.

Tradesman fixing new wall sheeting inside a room under renovation
New linings go up only after the plumbing inside the walls is finished.

Approval and budget

Replacing a bathroom within the same room, without structural changes, is usually exempt development. Knock out a wall, move into another room or add a bathroom where there wasn't one, and the project may need complying development or a Blacktown City Council DA.

The Rawlinsons figure of $23,500 to $26,500 covers a medium-standard fit-out in Sydney. Asbestos removal, replacement pipework and slab cutting sit outside it, which is why a site inspection comes before a fixed price.

Before you pick tiles

What I check in any Blacktown bathroom before quoting.

  1. 01

    When was the house built, and have the wall linings been tested?

  2. 02

    Are the water pipes galvanised steel or copper?

  3. 03

    Will the toilet, shower or vanity move?

  4. 04

    Is the floor a concrete slab or timber on bearers?

  5. 05

    Does the exhaust fan vent outside or into the roof?

  6. 06

    Who is the licensed waterproofer, and will the membrane be photographed?

Bathroom renovations in Blacktown

Does a Blacktown bathroom renovation need council approval?

Usually not, if it stays in the same room and nothing structural changes. Moving walls or adding a bathroom can need a CDC or DA.

How many weeks will my bathroom be out of action?

Three to five weeks for a single bathroom is typical, longer if asbestos, pipe replacement or relocated drainage are involved.

Is there asbestos in my Blacktown bathroom?

Possibly, if the house was built or renovated before about 1990. Wall linings and old vinyl should be tested before demolition.

Do you do other renovations in Blacktown?

Yes. Kitchens, laundries, whole-house renovations and additions, as well as granny flats and knockdown rebuilds across Blacktown City.

A bathroom that stays dry for decades.

A Blacktown bathroom renovation done properly behind the tiles, not just on them.