Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

Bathroom, Kitchen & Home Renovations Campbelltown

Renovations in Campbelltown 2560. Rawlinsons Sydney benchmarks: new bathroom $37k–$42k inc GST, new kitchen $31k–$35k inc GST; strip-out and existing services move it from there.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Home renovation build costs in Campbelltown: New bathroom $37k–$42k inc GST; new kitchen $31k–$35k inc GST (Rawlinsons Sydney). Internal kitchen and bathroom work often needs no approval; structural or external changes need a CDC or DA. Buildana manages design, Campbelltown City Council approvals (where required) and construction, with a fixed-price contract once design and scope are set.

Campbelltown Home Renovations

A home renovation in Campbelltown reads the layers — the R3/R4 station precinct where land value gets checked first, and the wider 1970s-90s brick streets where the renovation logic is classic and the hospital keeps demand steady.

The scope on the established streets: opened plans, renewed wet areas, extensions on the 500 to 750m² blocks. The era's fabric gets the asbestos check where the older stock carries it.

The shale is read before structural work.

We renovate under NSW contractor licence 487805C. Get our renovation scope, with the zoning checked, before you commit.

Buildana manages the complete home renovation process in Campbelltown — from initial consultation and design through to approvals (where required) and construction to handover, with a fixed-price contract once design and scope are set. Your home, modernised.

Not sure whether to renovate or rebuild? Use our Renovation vs KDR Calculator or read the renovation vs knockdown rebuild comparison.

  • Rawlinsons Sydney rates: new bathroom $37k–$42k inc GST, new kitchen $31k–$35k inc GST
  • Campbelltown City Council approvals managed (where required)
  • Kitchen, bathroom, and full-home renovations
  • 1970s–1990s brick veneer predominant (Ambarvale/Bradbury/Rosemeadow/Ruse/St Helens Park) + 1980s–2000s premium (Glen Alpine/Macarthur) + 2010s+ Macarthur Heights/Eagle Vale Stage 2-era homes — renovation specialists
  • Asbestos assessment and licensed removal managed
  • Waterproofing by licensed contractors, as NSW requires
  • No engineered stone benchtops — banned in Australia since 1 July 2024
  • Staged renovation plans to minimise disruption
  • 6-year structural warranty on structural work
  • Free consultation — near Campbelltown station
Buildana home renovation in Campbelltown near Queen Street + Campbelltown Mall + Campbelltown Hospital
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

Precinct first, then the streets

Near Campbelltown's station and CBD, the R3/R4 value is checked before any renovation dollar. On the wider brick streets, the 1970s-90s stock renovates on classic logic — with the hospital and Queen Street keeping demand for finished homes steady.

The honest read drives the spend.

Era and shale handled

The older fabric gets the asbestos check where it applies, and the shale is read by geotech before structural work.

All priced into the scope upfront.

Home renovation builder in Campbelltown — key facts

Suburb
Campbelltown, NSW 2560
Council / LGA
Campbelltown City Council (City of Campbelltown)
Primary zoning
R2
Typical lot size
500–800m² typical (Campbelltown/Glen Alpine/Bradbury/Ruse/St Helens Park); 350–550m² master-planned (Macarthur Heights/Eagle Vale); 1ha+ acreage (Wedderburn/Appin/Menangle Park)
Soil class
M
Home era
1970s–1990s brick veneer predominant
Typical price range
New bathroom $37k–$42k inc GST; new kitchen $31k–$35k inc GST (Rawlinsons Sydney)
Approval and build time
Internal kitchen and bathroom work often needs no approval; structural or external changes need a CDC or DA
Approval pathway
Exempt development for cosmetic, CDC/DA for structural

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Cost Guide

ItemEstimated Range
Cosmetic only (paint, floors, fittings)Depends on areas, finishes and selections
Wet area renovation — bathroom$37k–$42k inc GST
Wet area renovation — kitchen$31k–$35k inc GST
Wet area + structural (wall removal)Depends on span, beam and engineering
Full renovation + electrical/plumbing upgradeDepends on the condition of existing wiring and plumbing
Heritage-sensitive full renovationPriced per site

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

Structural engineering for any wall removal — steel beams to AS 4100
Load path verified back to footings before any structural change
Waterproofing to AS 3740 (internal wet areas) and AS 4654 (external)
Electrical rewire or partial upgrade to AS/NZS 3000 — older Campbelltown circuits often need compliance uplift
Plumbing rough-in relocation with AS 3500 sign-off by licensed plumber
Wet area substrate verification — fibre cement or compressed sheet, not plasterboard
Glazing upgrade to NCC Part 3.12.2 where envelope is touched
Smoke alarms hardwired and interconnected per NSW Building Regulation

How It Works

From First Call to Final Key

A Campbelltown renovation starts with what's worth keeping. Character floorboards, structural brickwork, original joinery — if it earns its place, it stays. Everything else gets a hard look.

⏱

Design is pragmatic. Removing the right wall to open a kitchen, upgrading the bathroom to function properly, fixing the laundry that was an afterthought in 1975. Structural engineer signs off before anything load-bearing moves.

⏱

Construction runs in stages so you can live in the house for parts of it. Wet areas and kitchens get a clear programme, so you know in advance when you'll be without a kitchen and when it's back.

⏱

Handover is clean. New work tied into old work with matched finishes, defects fixed before you move back into the finished zones, warranty on all new work.

⏱

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Start a Campbelltown Home Renovation

Free renovation consultation for Campbelltown 2560. We'll assess your home and talk through renovation options and any approvals needed, then provide a fixed-price contract once design and scope are set.

Start Your Project