Maroubra 2035 · Randwick City Council
Home Renovations Maroubra
In Maroubra, the first question isn't the tiles. It's whether you own a house or a unit.
A house renovation answers to Randwick City Council, and often needs no approval at all if the work stays inside. A unit renovation answers to the owners corporation first, and the rules for a kitchen differ from the rules for a bathroom. If you're close to the ocean, there's a third question: what the fittings are made of.
Short answer
What approvals do I need to renovate in Maroubra?
In a house, internal kitchen and bathroom work often needs no approval, but removing a structural wall, changing the outside or adding floor area needs a CDC or a DA with Randwick City Council. In a unit, a kitchen is a minor renovation needing owners corporation approval. A bathroom involving waterproofing is a major renovation, needing a special resolution at a general meeting.
Written and reviewed by Oliver Alameri
Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana
Fact-checked
Units: the owners corporation comes first
NSW strata law sorts renovations into three kinds. Cosmetic work, like painting inside or replacing built-in wardrobes, needs no approval. Minor renovations need approval by a vote at a strata meeting, and they include kitchen renovations, changes to internal walls and new hard flooring. Major renovations need a special resolution at a general meeting, and they include anything that changes the structure or the outside, or needs waterproofing.
So in a Maroubra unit, a kitchen is usually a minor renovation and a bathroom is a major one. If the work changes the structure, the owners corporation also needs 14 days' written notice before it starts. Read the by-laws before you design, because they can add to these lists and set working hours, lift protection and noise rules.
- Plans, dates and the trades' details for the owners corporation
- An acoustic certificate if you're laying hard flooring
- The vote before the strip-out, not after
In a unit, the vote comes before the demolition. Get the order wrong and you may have to put it back.
Houses: inside is usually yours, the structure isn't
Replacing a kitchen or bathroom inside a house usually needs no council approval. Opening up a kitchen by removing a load-bearing wall needs an engineer's design and a beam, and changing the outside or adding floor area needs a complying development certificate (CDC) or a development application (DA).
If the work fits the Housing Code, a private certifier can approve it, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). If it goes to Randwick City Council, a DA has a 40-day assessment period. The section 10.7 planning certificate shows the zoning, any heritage listing, and whether the lot sits in a mapped coastal area.
Renovating in Maroubra?
Tell me whether it's a house or a unit and which rooms you want to change. Oliver will respond within 4 working hours for a free initial conversation.
0476 300 300Close to the ocean, choose fittings for salt air
If the house is exposed to sea spray, specify for it. Marine-grade stainless or suitably coated fixings outside, window and door hardware rated for coastal exposure, and exhaust fans ducted outside rather than into the roof space, so moist air leaves the house.
Inside, the bathroom still needs licensed waterproofing to the standard the National Construction Code calls up. Salt air doesn't change that. It changes what you choose for anything metal.
What the published benchmarks say
Rawlinsons prices a bathroom fitted out in an addition at $36,850–$41,800 and a kitchen at $30,800–$34,650, including GST, Sydney, escalated to the ABS September 2026 index. Those are new rooms. A renovation adds strip-out and whatever is found behind the old finishes.
If the house was built or renovated before 1990, SafeWork NSW says it's likely to contain asbestos, so have suspect materials tested before demolition. Engineered stone benchtops can no longer be supplied or installed in Australia, so plan for natural stone, porcelain or another surface.

What I check first on a Maroubra renovation
Before the selections, these decide the approval path and the price.
- 01
House or unit, and for a unit, which renovation category applies
- 02
The strata by-laws on hours, lifts and flooring
- 03
Whether any wall coming out is structural
- 04
Asbestos testing, if the house predates 1990
- 05
Exposure to salt air, for fixings and fittings
- 06
Zoning, heritage and coastal mapping on the planning certificate
Renovating in Maroubra
Do I need strata approval to renovate my Maroubra unit's bathroom?
Yes. Bathroom work that involves waterproofing is a major renovation under NSW strata law, so it needs a special resolution at a general meeting of the owners corporation before work starts.
How much does a bathroom renovation cost in Maroubra?
The published benchmark for a new bathroom is $36,850–$41,800 including GST. Strip-out, asbestos, old plumbing and your selections move it from there, and in a unit, access and lift protection add to it.
Who handles the demolition and asbestos?
I organise the strip-out as part of the renovation, with a licensed removalist where testing finds asbestos. The builders in Maroubra page goes into what a strip-out tends to uncover.
Do you build extensions in Maroubra too?
Yes. If you need more space rather than new rooms, the Maroubra home extensions page covers ground floor and first floor additions.
Sources and references
Costs are from the Rawlinsons handbook with the local cost index applied; rules and timeframes are checked against the sources below.
- Randwick City Council
- Rawlinsons Australian Construction Handbook, Rawlhouse Publishing
- Environmental Planning and Assessment Act 1979 (NSW)
- State Environmental Planning Policy (Exempt and Complying Development Codes) 2008
- National Construction Code, ABCB
- Asbestos, SafeWork NSW
- Strata Schemes Management Act 2015 (NSW)
- Building or renovating a home, NSW Government
- Search heritage databases, NSW Environment and Heritage
- NSW Planning Portal Spatial Viewer (zoning, FSR and hazard maps)
- Strata renovation rules, NSW Government
- State Environmental Planning Policy (Resilience and Hazards) 2021
Start with what you own
Send the address, house or unit, and the rooms you want to change. Oliver will respond within 4 working hours for a free initial conversation.