Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

Bathroom Renovations Point Piper — Kitchens & Whole Homes Too

We renovate across Point Piper 2027, staging the work so you can stay in the home where practical, and checking Woollahra Municipal Council's approval triggers before we start.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Home renovation build costs in Point Piper: New bathroom $37k–$42k inc GST; new kitchen $31k–$35k inc GST (Rawlinsons Sydney). Internal kitchen and bathroom work often needs no approval; structural or external changes need a CDC or DA. Buildana manages design, Woollahra Municipal Council approvals (where required) and construction, with a fixed-price contract once design and scope are set.

Renovating Homes in Point Piper

A home renovation in Point Piper operates in Australia's most expensive postcode — grand Federation and inter-war mansions on 600 to 2,500m² blocks along Wolseley and Wunulla Roads, with HCAs on virtually every street and direct harbour frontage as the norm.

The work is uncompromising: conservation-grade fabric restoration, interiors rebuilt to international standard, and the harbour frontage engineered — rock anchoring is standard on the fall here, priced from the geotech.

The pre-war fabric takes licensed lead-paint and asbestos handling throughout.

We renovate under NSW contractor licence 487805C. Get our renovation scope, with heritage, rock and fall resolved, before you commit.

Buildana manages the complete home renovation process in Point Piper — from initial consultation and design through to approvals (where required) and construction to handover, with a fixed-price contract once design and scope are set. Your home, modernised.

Not sure whether to renovate or rebuild? Use our Renovation vs KDR Calculator or read the renovation vs knockdown rebuild comparison.

  • Rawlinsons Sydney rates: new bathroom $37k–$42k inc GST, new kitchen $31k–$35k inc GST
  • Woollahra Municipal Council approvals managed (where required)
  • Kitchen, bathroom, and full-home renovations
  • 1880s–1940s heritage mansions-era homes — renovation specialists
  • Asbestos assessment and licensed removal managed
  • Waterproofing by licensed contractors, as NSW requires
  • No engineered stone benchtops — banned in Australia since 1 July 2024
  • Staged renovation plans to minimise disruption
  • 6-year structural warranty on structural work
  • Free consultation — near Edgecliff (2 km, ferry from Double Bay) station
Point Piper renovation — kitchen, bathroom and full internal refit
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

No margin for less than exact

At Point Piper's values, the renovation is conservation-grade or it is a mistake — restored heritage fabric, interiors rebuilt to international standard, and the direct harbour frontage worked with engineering to match.

Rock anchoring on the fall is standard practice here, not an extra.

Engineering the frontage

The substantial fall and the sandstone mean anchoring, retaining and suspended structure are designed early and priced from the geotech. The pre-war hazards are licensed processes throughout.

All in the scope before you commit.

Home renovation builder in Point Piper — key facts

Suburb
Point Piper, NSW 2027
Council / LGA
Woollahra Municipal Council (Woollahra)
Primary zoning
R2 Low
Typical lot size
600–2,500m²
Soil class
M
Home era
1880s–1940s heritage mansions
Typical price range
New bathroom $37k–$42k inc GST; new kitchen $31k–$35k inc GST (Rawlinsons Sydney)
Approval and build time
Internal kitchen and bathroom work often needs no approval; structural or external changes need a CDC or DA
Approval pathway
Exempt development for cosmetic, CDC/DA for structural

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Structural engineering for any wall removal — steel beams to AS 4100
Load path verified back to footings before any structural change
Waterproofing to AS 3740 (internal wet areas) and AS 4654 (external)
Electrical rewire or partial upgrade to AS/NZS 3000 — older Point Piper circuits often need compliance uplift
Plumbing rough-in relocation with AS 3500 sign-off by licensed plumber
Wet area substrate verification — fibre cement or compressed sheet, not plasterboard
Glazing upgrade to NCC Part 3.12.2 where envelope is touched
Smoke alarms hardwired and interconnected per NSW Building Regulation

How It Works

From First Call to Final Key

We assess your Point Piper home — existing condition, renovation scope, structural requirements, and budget. You'll receive a clear overview of costs and timeline before committing.

⏱

Design phase includes floor plan modifications, 3D kitchen and bathroom renders, material palettes, and electrical layout. You approve every detail before construction begins.

⏱

For renovations that need DA or CDC, we lodge structural drawings, hydraulic if wet areas move, BASIX if envelope changes, and SEE if DA. For pure cosmetic work, no lodgement, no permit fees — straight to scheduling trades.

⏱

Renovation under a written contract, from demolition of existing fittings to final finish. Staged programme keeps parts of your home liveable. All trades coordinated by your project manager with weekly updates.

⏱

Handover includes a defect walk-through where we mark any final touch-ups, complete them promptly, and re-inspect. The end-state is genuinely finished — not handed over with a list to chase trades back for.

⏱

Quality Promise

We renovate Point Piper homes the way they should be renovated — scope locked, budget locked, program locked, then we start.

Fixed-price contract once design and scope are setNCC 2025 compliant (structural work)Woollahra Municipal Council compliance where requiredAsbestos assessment and licensed removalWeekly progress updates6-year structural warranty (structural work)

Cost Guide

ItemEstimated Range
Kitchen renovation$31k–$35k inc GST
Bathroom renovation$37k–$42k inc GST
Cosmetic (paint, floors, lighting)Depends on areas, finishes and selections
Structural reno (wall removal, open-plan)Depends on span, beam and engineering
Full home makeoverPriced on scope

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Start a Point Piper Home Renovation

Free renovation consultation for Point Piper 2027. We'll assess your home and talk through renovation options and any approvals needed, then provide a fixed-price contract once design and scope are set.

Start Your Project