Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

Knock Down Rebuild Builders Artarmon — Demolition to Handover

NSW licensed builder for knockdown rebuilds in Artarmon 2064: licensed asbestos removal and demolition, an engineered slab for the site, BASIX and NSW statutory warranties.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Knockdown rebuild in Artarmon. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs. Willoughby City Council approval by CDC or DA.

Knockdown Rebuild Builder in Artarmon

A knockdown rebuild in Artarmon suits the Federation, inter-war and post-war stock on 450 to 700m² blocks, in a suburb that mixes a small commercial heart around the station with leafy residential back streets toward Chatswood. With its own station and R2 and R3 zoning, it is a well-connected rebuild suburb.

The two things to check are heritage and soil. Heritage Conservation Areas cover Hampden Road and parts of Cleland Road, so a block there goes down the DA path. The ground is Class M on the ridges but grades Class H to E in the Middle Harbour valleys, so the slab is designed off a real geotech.

On the R3 blocks over the 650m² duplex minimum, a duplex can be the stronger play, so I run both feasibilities where the block allows. The pre-war stock can carry asbestos and lead paint, so a licensed strip-out leads the demolition.

We rebuild under NSW contractor licence 487805C. Get our feasibility — rebuild or duplex — before you commit.

Buildana manages the complete knockdown rebuild process in Artarmon — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home designed for your Artarmon block
  • Willoughby City Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • M — engineered slab design included
  • Typical blocks 450–700m² in Artarmon
  • Single and two-storey designs available
  • Statutory home warranties
  • Free site assessment — near Artarmon station
KDR construction in Artarmon — R2 Low Density zoned
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

Well-connected, mixed stock

Artarmon mixes a small commercial heart around the station with a tight residential grid of Federation, inter-war and post-war stock on 450 to 700m² blocks. Its own station and the leafy back streets toward Chatswood make it a genuinely convenient rebuild suburb.

On the R3 blocks over the 650m² minimum, a duplex can be worth costing, so I run both the rebuild and the duplex.

Heritage and valley soil

Heritage Conservation Areas cover Hampden Road and parts of Cleland Road, so a block there goes down the DA path with a sympathetic design. The ground is Class M on the ridges but grades Class H to E in the Middle Harbour valleys, so the slab is designed off a real geotech.

The pre-war stock can carry asbestos and lead paint, so a licensed strip-out leads the demolition.

Knockdown-rebuild builder in Artarmon — key facts

Suburb
Artarmon, NSW 2064
Council / LGA
Willoughby City Council (Willoughby)
Primary zoning
R2 Low Density
Typical lot size
450–700m²
Soil class
M
Home era
1920s–1970s
Typical price range
To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

New home on the same land — keep the suburb, keep the schools, keep the street
No selling and rebuying in Artarmon — and no stamp duty on a new purchase
Single contract covers demolition and rebuild — one contractor, one timeline
Fixed-price inclusive of demolition, rubbish removal, asbestos — no surprise invoices
Energy performance designed to the applicable NCC and BASIX requirements
450–700m² block replanned for how you live now, not how 1970s Sydney lived
NSW statutory warranties on the new home — same as a greenfield build
Property value reset to new-build benchmark in the suburb

How It Works

From First Call to Final Key

Free site inspection of your Artarmon property. We check lot dimensions, Willoughby City Council's planning controls, existing home condition, and potential asbestos.

⏱

KDR is the chance to get the design right — the new build doesn't have to mimic the original layout. We start from your block's strengths (orientation, slope, views) and your family's brief, then design the home the original lot always deserved.

⏱

Licensed demolition of existing 1920s–1970s (Federation, inter-war, mid-century)-era dwelling. Asbestos removal by certified contractors (if present).

⏱

Your new home goes up on the cleared site. Engineered slab sized for Class M soil, frame, roof, fit-out, kitchen, bathrooms, flooring, painting, driveway, and landscaping.

⏱

Handover pack: OC, structural certificates, BASIX, appliance manuals and warranties, paint colour schedule, maintenance plan, and the keys. Statutory warranty periods are measured from completion, not simply the OC date — keep the documentation safe for any future sale.

⏱

Quality Promise

Every Buildana knockdown rebuild in Artarmon is delivered under a fixed-price contract — site assessment through to defect-free handover.

Fixed-price contract once the design and scope are setNCC 2025 and BASIX compliantFull Willoughby City Council complianceLicensed demolition and asbestos removalWeekly progress updatesStatutory home warranties

Cost Guide

ItemEstimated Range
Demolish 1920s–1970s (Federation, inter-war, mid-century) fibro → new double storey (build only)$735k–$1.27M + GST
Demolish brick veneer → new single storey (build only)$565k–$980k + GST
Demolition of the existing homeDepends on house size, construction and asbestos
Asbestos removal (if present)Depends on the type and quantity found
Service disconnections & reinstatementDepends on the services connected to the site

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Knockdown Rebuild in Artarmon

Free KDR site assessment for Artarmon 2064. We'll assess your block and talk through demolition, approvals and the build.

Start Your Project