Knockdown Rebuild Breakfast Point — Demolition, Approval, New Home
Breakfast Point 2137 rebuilds approved by CDC or a City of Canada Bay Council DA: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Then licensed asbestos removal, demolition and the build.
Quick Answer
Knockdown rebuild in Breakfast Point. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs. City of Canada Bay Council approval by CDC or DA.
Knockdown Rebuild Builder in Breakfast Point
Knockdown rebuild in Breakfast Point does not really apply, and I will be upfront about it. This is a master-planned waterfront community built from the 2000s on the former Mortlake Gasworks site — contemporary villas, townhouses and apartments, with no older detached stock to knock down and rebuild.
The homes are only a couple of decades old, and the suburb is a planned estate with community-title controls, so a knockdown rebuild is not the product here. Where a home no longer suits, a renovation within the estate's controls is the conversation instead.
If your real project is a rebuild, the detached stock that suits one sits in the neighbouring suburbs like Cabarita, Canada Bay and Concord. The ground is Wianamatta Shale, so any works are designed off a real geotech.
We build under NSW contractor licence 487805C. Tell me what you actually own and I will point you at the right product.
Buildana manages the complete knockdown rebuild process in Breakfast Point — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.
Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.
- New home designed for your Breakfast Point block
- City of Canada Bay Council DA and CDC approvals managed
- Demolition and asbestos removal included
- M–H — engineered slab design included
- Typical blocks 200–500m² in Breakfast Point
- Single and two-storey designs available
- Statutory home warranties
- Free site assessment — near North Strathfield (3 km) station

Reviewed by Oliver Alameri
Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years
A master-planned estate, not a teardown one
Breakfast Point is a master-planned waterfront community built from the 2000s on the former Mortlake Gasworks site, with contemporary villas, townhouses and apartments. There is no older detached stock to knock down, and the homes are only a couple of decades old, so a knockdown rebuild is not the product.
As a planned estate with community-title controls, the real conversation where a home no longer suits is a renovation within those controls.
Where a rebuild actually fits
If your goal is genuinely a knockdown rebuild, the detached stock that suits one sits in the neighbouring suburbs — Cabarita, Canada Bay and Concord have the older detached blocks a rebuild needs. I would rather point you there than pursue the wrong product here.
The ground is Wianamatta Shale, so any works are designed off a real geotech.
Knockdown-rebuild builder in Breakfast Point — key facts
- Suburb
- Breakfast Point, NSW 2137
- Council / LGA
- City of Canada Bay Council (City of Canada Bay)
- Primary zoning
- R3/R4 master-planned
- Typical lot size
- 200–500m²
- Soil class
- M–H
- Home era
- 2000s+ master-planned
- Typical price range
- To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
- Approval and build time
- Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
- Approval pathway
- CDC where eligible or DA for complex sites
Want a real number for YOUR block — not a generic estimate?
Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.
Cost Guide
| Item | Estimated Range |
|---|---|
| Demolish 2000s+ master-planned fibro → new double storey (build only) | $735k–$1.27M + GST |
| Demolish brick veneer → new single storey (build only) | $565k–$980k + GST |
| Demolition of the existing home | Depends on house size, construction and asbestos |
| Asbestos removal (if present) | Depends on the type and quantity found |
| Service disconnections & reinstatement | Depends on the services connected to the site |
Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.
How It Works
From First Call to Final Key
Free site inspection of your Breakfast Point property. We check lot dimensions, City of Canada Bay Council's planning controls, existing home condition, and potential asbestos.
⏱KDR is the chance to get the design right — the new build doesn't have to mimic the original layout. We start from your block's strengths (orientation, slope, views) and your family's brief, then design the home the original lot always deserved.
⏱Licensed demolition of existing 2000s+ master-planned-era dwelling. Asbestos removal by certified contractors (if present).
⏱Your new home goes up on the cleared site. Engineered slab sized for Class M–H soil, frame, roof, fit-out, kitchen, bathrooms, flooring, painting, driveway, and landscaping.
⏱Handover pack: OC, structural certificates, BASIX, appliance manuals and warranties, paint colour schedule, maintenance plan, and the keys. Statutory warranty periods are measured from completion, not simply the OC date — keep the documentation safe for any future sale.
⏱Who you deal with
Oliver Alameri
Founder and Builder · Master of Property Development · NSW Licence 487805C
Estimate Your Build Cost
Use our free calculator to get an instant cost estimate for your project
Still got questions? Talk to Oliver directly.
30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.
Frequently Asked Questions
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
Fatima Al-Rashid
Liverpool, NSW
We Build Across Sydney
Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.
Last updated: 4 September 2026
Explore Related Topics
Knockdown Rebuild in Breakfast Point
Free KDR site assessment for Breakfast Point 2137. We'll assess your block and talk through demolition, approvals and the build.
Start Your ProjectMore in Breakfast Point
Other Buildana services in Breakfast Point
Costs, approval pathway and fixed-price contract detail for every other build type we deliver in Breakfast Point 2137. City of Canada Bay Council regulations and local controls are covered on each page.