Knockdown Rebuild Chifley — Demolition, Approval, New Home
Chifley 2036 rebuilds approved by CDC or a Randwick City Council DA: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Then licensed asbestos removal, demolition and the build.
Quick Answer
Knockdown rebuild in Chifley. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs. Randwick City Council approval by CDC or DA.
Chifley KDR — Single Contract, New Home
A knockdown rebuild in Chifley is an affordable-entry play in the Randwick LGA — quiet inland streets of 1950s to 1970s post-war fibro and brick on 500 to 700m² blocks. With limited heritage stock and lower prices than the coastal suburbs, a rebuild resets a dated home into a modern one without the heritage complexity.
The ground is sandstone, so excavation can hit rock, priced from a real geotech. The post-war fibro stock usually carries asbestos, so a licensed strip-out and clearance certificate lead the demolition.
Chifley is a straightforward rebuild suburb — good-sized blocks, minimal heritage overlay, affordable land for the eastern suburbs.
We rebuild under NSW contractor licence 487805C. Get our knockdown rebuild feasibility before you commit.
Buildana manages the complete knockdown rebuild process in Chifley — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.
Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.
- New home designed for your Chifley block
- Randwick City Council DA and CDC approvals managed
- Demolition and asbestos removal included
- M — engineered slab design included
- Typical blocks 500–700m² in Chifley
- Single and two-storey designs available
- Statutory home warranties
- Free site assessment — near Light Rail Kingsford (3 km) station

Reviewed by Oliver Alameri
Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years
Affordable entry, minimal heritage
Chifley is a quiet inland suburb in the southern Randwick LGA, with 1950s to 1970s post-war fibro and brick on 500 to 700m² blocks. With limited heritage stock and lower prices than the coastal suburbs, it is a straightforward rebuild suburb.
A knockdown resets a dated post-war home into a modern one, and the affordable land for the eastern suburbs helps the numbers.
Sandstone and asbestos
The ground is sandstone, so excavation can hit rock, priced from a real geotech. The post-war fibro stock usually carries asbestos, so a licensed strip-out and clearance certificate lead the demolition.
Both are priced into the feasibility so it reflects your block and home.
Knockdown-rebuild builder in Chifley — key facts
- Suburb
- Chifley, NSW 2036
- Council / LGA
- Randwick City Council (Randwick)
- Primary zoning
- R2 Low
- Typical lot size
- 500–700m²
- Soil class
- M
- Home era
- 1950s–1970s
- Typical price range
- To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
- Approval and build time
- Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
- Approval pathway
- CDC where eligible or DA for complex sites
Want a real number for YOUR block — not a generic estimate?
Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.
How It Works
From First Call to Final Key
On-site assessment covers block measurements, soil conditions (Class M), tree preservation checks, service locations, and asbestos identification on your 1950s–1970s-era home. Clear feasibility report before you commit.
⏱Approval pathway gets locked at design stage based on FSR, height, setbacks, and any overlays. Most Chifley KDRs go CDC for speed; we use DA when the design wants to push past complying development limits.
⏱Existing home demolished by licensed contractors. Asbestos removed and disposed of to EPA standards.
⏱Construction starts the week demolition finishes — no idle site, no momentum lost. Slab pour comes first, frame stand soon after.
⏱Final inspection, Occupation Certificate, NSW statutory warranties, keys, and maintenance guide. Services reconnected.
⏱Quality Promise
Our Chifley knockdown rebuilds sequence demolition, slab, frame, lockup, handover. Fixed price locked before demolition starts.
Cost Guide
| Item | Estimated Range |
|---|---|
| Demolish 1950s–1970s fibro → new double storey (build only) | $735k–$1.27M + GST |
| Demolish brick veneer → new single storey (build only) | $565k–$980k + GST |
| Demolition of the existing home | Depends on house size, construction and asbestos |
| Asbestos removal (if present) | Depends on the type and quantity found |
| Service disconnections & reinstatement | Depends on the services connected to the site |
Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.
Who you deal with
Oliver Alameri
Founder and Builder · Master of Property Development · NSW Licence 487805C
Estimate Your Build Cost
Use our free calculator to get an instant cost estimate for your project
Still got questions? Talk to Oliver directly.
30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.
Frequently Asked Questions
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
Fatima Al-Rashid
Liverpool, NSW
We Build Across Sydney
Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.
Last updated: 4 September 2026
Book a Chifley Knockdown Rebuild Assessment
Free KDR site assessment for Chifley 2036. We'll assess your block and talk through demolition, approvals and the build.