Knock Down Rebuild Builders Dolls Point — Demolition to Handover
NSW licensed builder for knockdown rebuilds in Dolls Point 2219: licensed asbestos removal and demolition, an engineered slab for the site, BASIX and NSW statutory warranties.
Quick Answer
Knockdown rebuild in Dolls Point. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs. Bayside Council approval by CDC or DA.
Demolish and Rebuild in Dolls Point
A knockdown rebuild in Dolls Point is a premium bayside play — a small beachside enclave on Botany Bay between Ramsgate Beach and Sandringham, with inter-war and post-war stock on 500 to 800m² blocks and a direct beachfront premium. A rebuild designs a modern bayside home around the beach setting.
On the beachfront and near-beach blocks, coastal salt-grade specs apply — corrosion-resistant fixings and marine-suitable detailing. The Botany Sands soil shapes the footing design off a real geotech, and the R3 along the foreshore opens options on some blocks.
The older stock carries asbestos, so a licensed strip-out leads the demolition.
We rebuild under NSW contractor licence 487805C. Get our feasibility, with the salt-grade specs and sands designed for, before you commit.
Buildana manages the complete knockdown rebuild process in Dolls Point — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.
Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.
- New home designed for your Dolls Point block
- Bayside Council DA and CDC approvals managed
- Demolition and asbestos removal included
- M — engineered slab design included
- Typical blocks 500–800m² in Dolls Point
- Single and two-storey designs available
- Statutory home warranties
- Free site assessment — near Bus to Kogarah (T4, 4 km) station

Reviewed by Oliver Alameri
Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years
A premium bayside enclave
Dolls Point is the small beachside enclave on Botany Bay between Ramsgate Beach and Sandringham, on 500 to 800m² blocks with a direct beachfront premium. A rebuild designs a modern bayside home around the beach setting, which the original inter-war home rarely used well.
The calm-water bayside position makes it a genuinely family-friendly premium pocket.
Salt-grade specs and the sands
On the beachfront and near-beach blocks, coastal salt-grade specs apply — corrosion-resistant fixings and marine-suitable detailing that lasts. The Botany Sands soil shapes the footing design off a real geotech.
The older stock carries asbestos, so a licensed strip-out leads the demolition. The R3 along the foreshore opens options on some blocks, which I check.
Knockdown-rebuild builder in Dolls Point — key facts
- Suburb
- Dolls Point, NSW 2219
- Council / LGA
- Bayside Council (Bayside)
- Primary zoning
- R2 Low
- Typical lot size
- 500–800m²
- Soil class
- M
- Home era
- 1930s–1970s
- Typical price range
- To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
- Approval and build time
- Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
- Approval pathway
- CDC where eligible or DA for complex sites
Want a real number for YOUR block — not a generic estimate?
Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.
How It Works
From First Call to Final Key
Everything that has to be right before we touch the ground. KDR feasibility is two questions: what can the block legally support, and is it cheaper to build new than fix old. We answer both in writing, with costs worked out for your block rather than a generic per-square-metre guess. New home designed for your Dolls Point block — maximising FSR, orientation, and streetscape. Working drawings, engineering, and BASIX prepared. CDC or DA lodged with Bayside Council.
⏱The Dolls Point construction phase. Fixed price, programmed, supervised. Full demolition management: asbestos survey report, licensed removal where required, structural demolition, site clearing, temporary fencing, and dust/noise management. Bayside Council demolition permit obtained beforehand. Build sequence: site prep, slab pour, frame stand, roof, brickwork, lock-up, plumbing and electrical rough-in, plaster, internal fit-out, kitchen install, tiling, flooring, painting, external works, final clean. Each stage signed off before payment release.
⏱The job isn't done when the site's clean; it's done when you have keys, certificates and warranties. Defect-free handover inspection, OC issued, keys in hand. Permanent services reconnected, landscaping complete, NSW statutory warranties, and full maintenance guide provided.
⏱Quality Promise
Buildana handles Dolls Point KDR end-to-end — old house out, new house in, one contract, one contractor, one defined timeline.
Cost Guide
| Item | Estimated Range |
|---|---|
| New single storey house (build only) | $565k–$980k + GST |
| New double storey house (build only) | $735k–$1.27M + GST |
| Premium rebuild | Priced per design and specification |
| Demolition (1930s–1970s Dolls Point home) | Depends on house size, construction and asbestos |
| Asbestos removal (if present) | Depends on the type and quantity found |
| Service disconnections & reinstatement | Depends on the services connected to the site |
Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.
Who you deal with
Oliver Alameri
Founder and Builder · Master of Property Development · NSW Licence 487805C
Estimate Your Build Cost
Use our free calculator to get an instant cost estimate for your project
Still got questions? Talk to Oliver directly.
30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.
Frequently Asked Questions
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
Fatima Al-Rashid
Liverpool, NSW
We Build Across Sydney
Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.
Last updated: 4 September 2026
Explore Related Topics
Demolish and Rebuild in Dolls Point
Free KDR site assessment for Dolls Point 2219. We'll assess your block and talk through demolition, approvals and the build.
Start Your ProjectMore in Dolls Point
Other Buildana services in Dolls Point
Costs, approval pathway and fixed-price contract detail for every other build type we deliver in Dolls Point 2219. Bayside Council regulations and local controls are covered on each page.