Knockdown Rebuild Middle Dural — Demo to Handover in 12 Months
Middle Dural 2158 KDR with tight programme: demolition (3–4 weeks), new home (24–40 weeks). CDC fast-track or The Hills Shire Council DA. Weekly progress updates.
Quick Answer
A knockdown rebuild in Middle Dural costs $450,000–$1,200,000+. Standard single-storey from $450K, two-storey from $650K. Buildana manages demolition, The Hills Shire Council approvals, and construction under one fixed-price contract.
Demolish and Rebuild in Middle Dural
A knockdown rebuild in Middle Dural is a premium acreage project — two to ten-plus hectare RU2 holdings with equestrian and orchard heritage on Hawkesbury Sandstone. A rebuild delivers a substantial rural-residential home on a serious semi-rural holding.
The acreage path applies in full: RU2 rural provisions, significant bushfire-prone overlays shaping the design to its BAL rating, on-site wastewater, and sandstone that can mean serious rock, priced from a real geotech bore.
There is no rail out here — the holdings, the privacy and the semi-rural character are the point. I plan the rebuild as acreage from the start, because a suburban approach goes wrong fast on land like this.
We rebuild fixed-price, licence HBL 487805C. Get our acreage feasibility before you commit.
Buildana manages the complete knockdown rebuild process in Middle Dural — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.
Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.
- New home in Middle Dural from $450K
- The Hills Shire Council DA and CDC approvals managed
- Demolition and asbestos removal included
- M — engineered slab design included
- Typical blocks 2–10ha+ (acreage) in Middle Dural
- Single and two-storey designs available
- 6-year structural warranty
- Free site assessment — near No rail (rural) station

Reviewed by Oliver Alameri
Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010
Serious holdings, planned as acreage
Middle Dural's two to ten-plus hectare RU2 holdings carry equestrian and orchard heritage and a premium semi-rural character. A rebuild delivers a substantial home that suits the holding, with the full rural planning path — provisions, access, setbacks — applying.
I plan it as acreage from the start rather than forcing a suburban template onto rural land.
Bushfire, wastewater and rock
The bushfire-prone overlays are significant, so the design meets its BAL rating from the RFS assessment. On-site wastewater is designed for the holding, and the Hawkesbury Sandstone can mean serious rock, priced from a real geotech bore.
All of it is in the feasibility and the fixed price before we start.
Knockdown-rebuild builder in Middle Dural — key facts
- Suburb
- Middle Dural, NSW 2158
- Council / LGA
- The Hills Shire Council (The Hills)
- Primary zoning
- R2 Low
- Typical lot size
- 2–10ha+ (acreage)
- Soil class
- M
- Median house price
- $3M–$8M+ (acreage)
- Home era
- Mixed rural
- Typical price range
- $450,000 – $1,200,000+
- Typical timeline
- 14–22 months including demolition
- Approval pathway
- CDC where eligible or DA for complex sites
Want a real number for YOUR block — not a generic estimate?
Free site assessment, fixed-price contract, line-itemised quote within 48 hours. No high-pressure sales — just a real builder talking real numbers.
Cost Guide
| Item | Estimated Range |
|---|---|
| Entry-level single storey KDR | $530,000 – $720,000 |
| Mid-range double storey KDR | $790,000 – $1,100,000 |
| Architectural KDR | $1,100,000 – $1,650,000 |
| Luxury KDR (high-spec finishes) | $1,650,000+ |
Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.
How It Works
From First Call to Final Key
Free site inspection of your Middle Dural property. We check lot dimensions, The Hills Shire Council's planning controls, existing home condition, and potential asbestos. Written assessment with budget estimate within 5 business days.
⏱KDR is the chance to get the design right — the new build doesn't have to mimic the original layout. We start from your block's strengths (orientation, slope, views) and your family's brief, then design the home the original lot always deserved.
⏱Licensed demolition of existing Mixed rural-era dwelling. Asbestos removal by certified contractors (if present). Site cleared, levelled, and ready for new slab. Typically 1–2 weeks.
⏱Your new home goes up on the cleared site. Engineered slab sized for Class M soil, frame, roof, fit-out, kitchen, bathrooms, flooring, painting, driveway, and landscaping. Quality inspections at every stage.
⏱Handover pack: OC, structural certificates, BASIX, appliance manuals and warranties, paint colour schedule, maintenance plan, and the keys. Six-year structural warranty kicks in from OC date — keep the documentation safe for any future sale.
⏱Our Team
Oliver Alameri
Founder / Director / Builder · MPropDev · PhD Student
Ahmad Alameri
Accounts Manager
Claire Wendell
Project Manager
Estimate Your Build Cost
Use our free calculator to get an instant cost estimate for your project
Still got questions? Talk to Oliver directly.
30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.
Frequently Asked Questions
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
Fatima Al-Rashid
Liverpool, NSW
We Build Across Sydney
Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.
Book a Middle Dural Knockdown Rebuild Assessment
Free KDR site assessment for Middle Dural 2158. We'll assess your block, estimate cost, and provide a fixed-price budget.
Start Your ProjectMore in Middle Dural