Knock Down Rebuild Builders Tamarama — Demolition to Handover
NSW licensed builder for knockdown rebuilds in Tamarama 2026: licensed asbestos removal and demolition, an engineered slab for the site, BASIX and NSW statutory warranties.
Quick Answer
Knockdown rebuild in Tamarama. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs. Waverley Council approval by CDC or DA.
Demolish and Rebuild in Tamarama
A knockdown rebuild in Tamarama is a premium coastal project in Sydney's smallest beachside suburb — the enclave between Bondi and Bronte, with Federation cottages, inter-war heritage and contemporary cliff-top builds on tight 200 to 600m² blocks. A rebuild designs a modern coastal home in a genuinely exclusive pocket.
The direct coastal exposure makes salt-grade construction essential — corrosion-resistant fixings and marine-suitable detailing. Heritage Conservation Areas cover most streets, so a rebuild generally goes down the DA path, and the tight blocks mean careful design.
The sandstone ground, with substantial fall to Tamarama Beach, means rock excavation and retaining on the fall lots, all priced from a real geotech. The pre-war stock can carry asbestos and lead paint, so a licensed strip-out leads the demolition.
We rebuild under NSW contractor licence 487805C. Get our knockdown rebuild feasibility, with salt-grade detailing, rock and fall costed, before you commit.
Buildana manages the complete knockdown rebuild process in Tamarama — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.
Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.
- New home designed for your Tamarama block
- Waverley Council DA and CDC approvals managed
- Demolition and asbestos removal included
- M — engineered slab design included
- Typical blocks 200–600m² in Tamarama
- Single and two-storey designs available
- Statutory home warranties
- Free site assessment — near Bondi Junction (3 km) station

Reviewed by Oliver Alameri
Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years
An exclusive coastal enclave
Tamarama is Sydney's smallest beachside suburb, the enclave between Bondi and Bronte, with Federation cottages and contemporary cliff-top builds on tight 200 to 600m² blocks. A rebuild designs a modern coastal home in a genuinely exclusive pocket, where good design makes the difference on a compact block.
It is one of the most tightly held coastal addresses in Sydney.
Salt-grade, heritage and cliff fall
The direct coastal exposure makes salt-grade construction essential — corrosion-resistant fixings and marine-suitable detailing. Heritage Conservation Areas cover most streets, so a rebuild generally goes down the DA path.
The sandstone ground, with substantial fall to Tamarama Beach, means rock excavation and retaining on the fall lots, all priced from a real geotech. The pre-war stock can carry asbestos and lead paint, so a licensed strip-out leads the demolition.
Knockdown-rebuild builder in Tamarama — key facts
- Suburb
- Tamarama, NSW 2026
- Council / LGA
- Waverley Council (Waverley)
- Primary zoning
- R2 Low
- Typical lot size
- 200–600m²
- Soil class
- M
- Home era
- 1900s–1940s
- Typical price range
- To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
- Approval and build time
- Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
- Approval pathway
- CDC where eligible or DA for complex sites
Want a real number for YOUR block — not a generic estimate?
Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.
How It Works
From First Call to Final Key
Site visit covers everything that affects the build cost: vehicle access for trucks and crane, services (sewer depth, water connection, electrical service rating), soil exposure for borehole, neighbouring construction, and any obvious heritage or tree constraints. Real numbers, not estimates.
⏱Architectural design for your replacement home, structural engineering for Class M soil, BASIX certification, and all approval documentation. Lodged as CDC or DA depending on design.
⏱Demolition time for a standard Tamarama cottage depends on asbestos volume and whether the structure includes a brick chimney or solid-block walls. Asbestos work happens first under a controlled removal program before mechanical demo starts.
⏱New home built from engineered slab (Class M soil) to keys under a written contract, with milestone-based progress payments. Your project manager provides weekly updates.
⏱Walk through your finished home on your original Tamarama block. OC issued, all services live, NSW statutory warranties, appliance manuals, and maintenance schedule. Move in.
⏱Quality Promise
Tamarama knockdown rebuild done cleanly: licensed demolition, compliant slab, new home built to NCC 2025. Fixed-price contract.
Cost Guide
| Item | Estimated Range |
|---|---|
| Build rate (Rawlinsons Sydney, brick veneer, medium to high finish) | $2,820–$4,250/m² + GST |
| Single storey or double storey KDR (build only) | single storey $565k–$980k + GST, double storey $735k–$1.27M + GST |
| Architectural KDR | Priced per design and specification |
| Luxury KDR (high-spec finishes) | Priced on your selections |
Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.
Who you deal with
Oliver Alameri
Founder and Builder · Master of Property Development · NSW Licence 487805C
Estimate Your Build Cost
Use our free calculator to get an instant cost estimate for your project
Still got questions? Talk to Oliver directly.
30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.
Frequently Asked Questions
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
Fatima Al-Rashid
Liverpool, NSW
We Build Across Sydney
Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.
Last updated: 4 September 2026
Tamarama KDR — Start Here
Free KDR site assessment for Tamarama 2026. We'll assess your block and talk through demolition, approvals and the build.
Start Your ProjectMore in Tamarama
Other Buildana services in Tamarama
Costs, approval pathway and fixed-price contract detail for every other build type we deliver in Tamarama 2026. Waverley Council regulations and local controls are covered on each page.