Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Custom home alfresco and landscaping
North Turramurra 2074 · Ku-ring-gai

North Turramurra Home Builder — Custom Homes, KDR, Duplex

Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · Ku-ring-gai DA and CDC pathways

North Turramurra borders Ku-ring-gai Chase National Park — the Bobbin Head Road and Golf Course corridor sets the streetscape. No train station — bus only. The setting buys you privacy; the trade-off is BAL ratings and longer build timelines through bushfire-compliant detailing.

North Turramurra (2074) is in Ku-ring-gai. Before a design or a price, Buildana checks the title, the planning certificate and the site, so the advice fits the lot.

Council

Ku-ring-gai

Postcode

2074

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

DA assessment period

40 days (statutory)

Duplex minimum lot

Check the LEP

Low and Mid-Rise areas

8 nominated

Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.

Builder perspective

Building in North Turramurra: what gets checked first

Every North Turramurra feasibility begins with paperwork: the title plan, the planning certificate for the address and, before any slab design, a geotechnical report. Approval runs through Ku-ring-gai or a certifier: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise), and a DA has a 40-day assessment period. New house versus a large renovation is a cost question: Rawlinsons rates for a new Sydney house run $2,820–$4,250/m² + GST, an addition has its own rates, and the condition of the existing house decides which makes sense. Site costs are the part of a budget no desktop estimate can settle: soil, slope, trees, stormwater and services are each confirmed by the engineer, surveyor, arborist or authority responsible. Buildana is a Fairfield-based builder holding NSW contractor licence 487805C, and Oliver Alameri, with 15+ years' building experience, runs every job himself. If you're sitting on a North Turramurra block, or about to buy one, send the address and Oliver will tell you what's realistic on it and which checks come next.

OA

Oliver Alameri — Founder & licensed builder

Licence 487805C · 15+ years' building experience

Talk to Oliver

North Turramurra build context

What's known for North Turramurra, and the document that confirms each lot-specific fact before a price.

Council

Ku-ring-gai Council

Postcode

2074

Nearest station

Turramurra

Local landmark

North Turramurra Golf Course & Ku-ring-gai Chase NP

Zoning

Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer

Lot area and frontage

Title plan, or a detail survey

Site classification (AS 2870)

Geotechnical report for the lot

Age of the house

Built before 1990? Asbestos inspection before demolition

Duplex minimum lot

Lot size map in the council's LEP

Low and Mid-Rise area

Turramurra station and town centre (800m walk applies)

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

Why owners build with Buildana in North Turramurra

What every Buildana job includes, written down.

  • Licence 487805C, home building compensation cover where the law requires it, and a written contract with an inclusions schedule.
  • Ku-ring-gai rules are read before design: a CDC where the design meets every code standard, a DA where it needs merit assessment.
  • One point of contact: Oliver sequences the survey, geotechnical report, engineering and BASIX so each informs the next.
  • If the house was built before 1990, an asbestos inspection comes before demolition, and removal is by a SafeWork NSW licensed contractor.
  • Changes to the scope are agreed in writing before the work is done, as NSW home building law requires.
  • Anchored on the amanah principle: keeping the word given. Local landmark: North Turramurra Golf Course & Ku-ring-gai Chase NP. Nearest station: Turramurra.

North Turramurra build costs from published rates

Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a North Turramurra lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.

Build typePublished rateBasis
Custom home, per m²$2,820–$4,250/m² + GSTRawlinsons individual house, brick veneer, medium to high finish.
Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²)single storey $565k–$980k + GST, double storey $735k–$1.27M + GSTAt $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra.
Duplex, attached four-bedroom pair$1.4M–$1.7M + GSTBoth dwellings, before site costs and subdivision.
Ground-floor addition, per m²$2,360–$2,840/m² + GSTRawlinsons ground floor addition, framed to brick veneer.
First-floor addition, per m²$3,790–$4,230/m² + GSTRawlinsons full first floor addition.
New bathroom in an addition$34k–$38k + GSTRawlinsons bathroom fit-out and services, each.
New kitchen in an addition$28k–$32k + GSTRawlinsons kitchen fit-out and services, each.
Granny flatFrom the catalogue price of the design you choose, plus site costsCatalogue designs carry their own published price.

Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.

Free North Turramurra feasibility

Thinking about building in North Turramurra? Start with the lot, not a sales pitch.

Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.

Written contract with an inclusions schedule Licence 487805C Ku-ring-gai DA and CDC pathways explained

Buildana services in North Turramurra

Six services across Ku-ring-gai, each priced for the lot once plans, engineering and site checks are done.

Knockdown Rebuild

The new house is costed from published Rawlinsons rates; demolition and site costs are confirmed for the lot before the contract.

North Turramurra knockdown rebuild approach

Duplex

Two homes on one lot with separate services, fire separation and sound insulation designed to the National Construction Code.

North Turramurra duplex approach

Granny Flat

A granny flat built as a proper home: its own kitchen, bathroom, BASIX certificate and statutory warranty.

North Turramurra granny flat approach

Custom Home

Architect-led design sized to the block, the streetscape and the brief, not a catalogue plan.

North Turramurra custom home approach

Extension

Extensions that tie into the existing roof line, brickwork and slab so the addition reads as part of the house.

North Turramurra extension approach

Renovation

Structural changes, waterproofing and finishes in one contract with a licensed builder.

North Turramurra renovation approach

Approval pathway in North Turramurra

Council: Ku-ring-gai Council.

The approval question on a North Turramurra build is whether the design complies with every clause of the Codes SEPP, or needs merit assessment by Ku-ring-gai. Complying development: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). Development application: a DA has a 40-day assessment period. Application fees are in Ku-ring-gai's fees and charges, and contributions depend on its contributions plans.

CDC pathway

Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.

DA pathway

Ku-ring-gai merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.

Local duplex minimum

Check Ku-ring-gai Council's local environmental plan and its lot size maps for the lot.

As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).

Low and Mid-Rise areas in Ku-ring-gai

Gordon station and town centre, Killara station, Lindfield station and town centre, Pymble station, Roseville station, St Ives Shopping Village shopping centre, Turramurra station and town centre, Wahroonga station. Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). Turramurra station and town centre is on the list; whether a North Turramurra lot is within an 800m walk of it is measured for each lot. Council rules compared

Granny flats

Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to Ku-ring-gai as a DA.

North Turramurra site considerations

Site costs in North Turramurra come from the lot, not the suburb. The footings depend on the site classification, which a geotechnical engineer sets under AS 2870 and the structural engineer designs to. Demolition depends on the existing house: if it was built before 1990, a licensed asbestos assessor confirms what's there before a licensed removalist takes it out.

Soil & footings

A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.

Demolition & asbestos

A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.

Flood, bushfire & heritage

These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.

What to check for a North Turramurra lot, and where

North Turramurra build FAQs

The questions that come up most often on a first North Turramurra site walk.

What decides the site costs on a North Turramurra block?
The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by Ku-ring-gai's tree controls and an arborist, stormwater by Ku-ring-gai's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.
How long does a custom home build take in North Turramurra?
The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a North Turramurra timeline is set once the design and the approval pathway are known.
Can I build a duplex in North Turramurra?
The local minimum lot size for a duplex is set in Ku-ring-gai Council's local environmental plan; the lot size map for the address shows it. As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. Turramurra station and town centre is one of those areas. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
What's the granny flat pathway in North Turramurra?
Secondary dwellings in North Turramurra are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with Ku-ring-gai. The title, overlays and current controls are checked with the certifier or Ku-ring-gai before design.
What soil class is typical in North Turramurra?
There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
What does it cost to knock down and rebuild in North Turramurra?
For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
Do you do extensions and renovations in North Turramurra?
Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.
How long does a DA take with Ku-ring-gai?
NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through Ku-ring-gai or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in Ku-ring-gai's fees and charges.

Nearby Ku-ring-gai suburbs we build in

Other Ku-ring-gai suburbs, assessed by the same council: Ku-ring-gai Council.

Ready to talk about your North Turramurra build?

Oliver will respond within 4 working hours for a free initial conversation about your North Turramurra site, the Ku-ring-gai pathway and what it could cost to build.