Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Premium custom home, brick and render
Strathfield South 2136 · Strathfield

Strathfield South Home Builder — Custom Homes, KDR, Duplex

Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · Strathfield DA and CDC pathways

Cooks River alluvial on the southern fringe brings flood planning controls.

Strathfield South is assessed by Strathfield Council. Zoning, flooding, bush fire and heritage are recorded lot by lot on the planning certificate, so that's where every Strathfield South feasibility starts.

Council

Strathfield Municipal

Postcode

2136

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

DA assessment period

40 days (statutory)

Duplex minimum lot

Check the LEP

Low and Mid-Rise areas

2 nominated

Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.

Builder perspective

Building in Strathfield South: what gets checked first

Building in Strathfield South starts with the same questions on every site: what the title and the planning certificate say about the lot, what Strathfield Council will assess, and what a geotechnical report says about the ground. Strathfield Municipal assesses a development application on its merits, and a DA has a 40-day assessment period; a design that meets every code standard can go the complying development route instead. Granny flats come under Housing SEPP 2021: complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m²; otherwise the council assesses a DA. The footing system comes from the geotechnical report: the engineer classifies the site under AS 2870 and the slab is designed to that class. Buildana's price comes after the plans, engineering and site checks, as a written contract with an inclusions schedule, so the number reflects the actual lot. Send through a Strathfield South address and Oliver will read the title, zoning and planning certificate before any design conversation starts.

OA

Oliver Alameri — Founder & licensed builder

Licence 487805C · 15+ years' building experience

Talk to Oliver

Strathfield South build context

What's known for Strathfield South, and the document that confirms each lot-specific fact before a price.

Council

Strathfield Council

Postcode

2136

Nearest station

Strathfield

Local landmark

Strathfield South shops + Cooks River foreshore

Zoning

Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer

Lot area and frontage

Title plan, or a detail survey

Site classification (AS 2870)

Geotechnical report for the lot

Age of the house

Built before 1990? Asbestos inspection before demolition

Duplex minimum lot

Lot size map in the council's LEP

Low and Mid-Rise area

Walking distance to a nominated area, measured for the lot

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

Why owners build with Buildana in Strathfield South

What every Buildana job includes, written down.

  • NSW contractor licence 487805C. Every job runs on a written contract with an inclusions schedule, priced once plans, engineering and site checks are done.
  • Strathfield Municipal controls are checked up front, so the design is drawn for the approval pathway it will actually take.
  • Oliver coordinates the surveyor, geotechnical and structural engineers, BASIX assessor and certifier, so the documents arrive in the right order.
  • Asbestos is identified before demolition, not discovered during it: pre-1990 houses are inspected and licensed removalists do the work.
  • Build rates come from the Rawlinsons construction handbook, escalated with the ABS house construction price index, not a guess.
  • Anchored on the amanah principle: keeping the word given. Local landmark: Strathfield South shops + Cooks River foreshore. Nearest station: Strathfield.

Strathfield South build costs from published rates

Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a Strathfield South lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.

Build typePublished rateBasis
Custom home, per m²$2,820–$4,250/m² + GSTRawlinsons individual house, brick veneer, medium to high finish.
Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²)single storey $565k–$980k + GST, double storey $735k–$1.27M + GSTAt $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra.
Duplex, attached four-bedroom pair$1.4M–$1.7M + GSTBoth dwellings, before site costs and subdivision.
Ground-floor addition, per m²$2,360–$2,840/m² + GSTRawlinsons ground floor addition, framed to brick veneer.
First-floor addition, per m²$3,790–$4,230/m² + GSTRawlinsons full first floor addition.
New bathroom in an addition$34k–$38k + GSTRawlinsons bathroom fit-out and services, each.
New kitchen in an addition$28k–$32k + GSTRawlinsons kitchen fit-out and services, each.
Granny flatFrom the catalogue price of the design you choose, plus site costsCatalogue designs carry their own published price.

Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.

Free Strathfield South feasibility

Thinking about building in Strathfield South? Start with the lot, not a sales pitch.

Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.

Written contract with an inclusions schedule Licence 487805C Strathfield Municipal DA and CDC pathways explained

Buildana services in Strathfield South

Six services across Strathfield, each priced for the lot once plans, engineering and site checks are done.

Knockdown Rebuild

Knockdown rebuild in the right order: asbestos inspection, demolition, geotechnical report, slab design, then the build.

Strathfield South knockdown rebuild approach

Duplex

Duplex feasibility starts with zone, area, frontage and slope, read from the title and the planning certificate.

Strathfield South duplex approach

Granny Flat

Secondary dwellings under Housing SEPP 2021: complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m².

Strathfield South granny flat approach

Custom Home

Custom plans tailored to the land, orientation and budget, priced once the drawings and engineering are done.

Strathfield South custom home approach

Extension

A first-floor addition needs the original footings checked by an engineer, and that happens before the design is finalised.

Strathfield South extension approach

Renovation

Renovations scoped properly: waterproofing, electrical compliance and smoke alarms to current standards.

Strathfield South renovation approach

Approval pathway in Strathfield South

Council: Strathfield Council.

Strathfield Municipal administers local planning controls for Strathfield South, including setbacks, character provisions and heritage overlays. A certifier assesses a proposed rebuild or dual occupancy against the Codes SEPP and site exclusions before confirming CDC eligibility. Where complying development is unavailable, a DA may be required. Secondary dwellings are assessed under Housing SEPP 2021 and applicable complying-development standards; lot size and zoning alone do not guarantee approval.

CDC pathway

Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.

DA pathway

Strathfield Municipal merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.

Local duplex minimum

Check Strathfield Council's local environmental plan and its lot size maps for the lot.

As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).

Low and Mid-Rise areas in Strathfield

Flemington station, Homebush station. Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). Council rules compared

Granny flats

Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to Strathfield Municipal as a DA.

Strathfield South site considerations

The planning certificate for a Strathfield South address says whether the lot is flood affected, bush fire prone or in a heritage area. Each brings its own consultant (flood engineer, bush fire assessor, heritage advisor) and its own cost, confirmed before the contract.

Soil & footings

A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.

Demolition & asbestos

A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.

Flood, bushfire & heritage

These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.

What to check for a Strathfield South lot, and where

Strathfield South build FAQs

The questions that come up most often on a first Strathfield South site walk.

How long does a DA take with Strathfield Municipal?
NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through Strathfield Municipal or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in Strathfield Municipal's fees and charges.
What decides the site costs on a Strathfield South block?
The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by Strathfield Municipal's tree controls and an arborist, stormwater by Strathfield Municipal's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.
How long does a custom home build take in Strathfield South?
The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a Strathfield South timeline is set once the design and the approval pathway are known.
Can I build a duplex in Strathfield South?
The local minimum lot size for a duplex is set in Strathfield Council's local environmental plan; the lot size map for the address shows it. As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
What's the granny flat pathway in Strathfield South?
Secondary dwellings in Strathfield South are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with Strathfield Municipal. The title, overlays and current controls are checked with the certifier or Strathfield Municipal before design.
What soil class is typical in Strathfield South?
There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
What does it cost to knock down and rebuild in Strathfield South?
For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
Do you do extensions and renovations in Strathfield South?
Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.

Nearby Strathfield suburbs we build in

Other Strathfield suburbs, assessed by the same council: Strathfield Council.

Ready to talk about your Strathfield South build?

Oliver will respond within 4 working hours for a free initial conversation about your Strathfield South site, the Strathfield Municipal pathway and what it could cost to build.