Strathfield South 2136 · Strathfield Council
Custom Home Builders Strathfield South
Strathfield rewrote its house rules this year. A new Strathfield South home gets designed to the new set.
Strathfield Council adopted a new General Residential Development Control Plan in 2026, and it applies to applications lodged from 1 September. Add the flood study for the Cooks River and Coxs Creek, and a state biosecurity order on moving soil near Enfield, and the early decisions on a Strathfield South home are as much about the site as the floor plan.
Short answer
What rules apply to a new home in Strathfield South?
Strathfield Council's General Residential DCP 2026 applies to development applications lodged on or after 1 September 2026, alongside the Strathfield LEP 2012. It covers site analysis, earthworks, the building envelope, parking, landscaping, solar access and privacy. The planning certificate shows heritage and flood status, and whether the state's Housing Code can be used instead of a DA.
Written and reviewed by Oliver Alameri
Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana
Fact-checked
A new DCP from 1 September 2026
Strathfield Council has adopted a new General Residential Development Control Plan. It applies to relevant development applications lodged on or after 1 September 2026, and it covers dwelling houses, secondary dwellings, dual occupancies, multi dwelling housing, terraces and manor homes in one document.
For a single new home, the parts that shape the design are the building envelope (setbacks, height, building scale and articulation), earthworks and cut and fill, access and parking, private open space, landscaping and tree planting, fencing, solar access, visual privacy and acoustic amenity, dwelling layout, and materials and finishes. There are separate controls for corner sites and lots next to open space.
If your DA went in before 1 September, the new DCP's savings and transitional section says which version applies. If you're starting now, there's no reason to design to the old rules. I work from the new plan from the first sketch.
- Site analysis
- Earthworks: cut and fill
- Building envelope: setbacks, height, scale and articulation
- Access, parking and circulation
- Private open space, landscaping and tree planting
- Solar access, privacy, and materials and finishes
Design to the rules that will assess the DA, not the ones your neighbour built under.
The site analysis comes first
Under the new DCP, every proposal involving physical works needs a Site Analysis Plan. Alterations only address the items relevant to them. A new dwelling has to address every item on the list.
That plan shows the subdivision pattern and the footprints of the buildings on the adjoining lots, the topography and slope of the site, overland flow, and the other features the DCP lists. It's not paperwork for its own sake. It's what tells you where the house can sit without overshadowing the neighbours, where water will want to go in a storm, and which trees, levels and views you're designing around.
So I start with a detail survey and the planning certificate, then draw the site analysis before the floor plan. A design that starts there rarely has to be pulled apart at the DA stage.

Building in Strathfield South?
Send the address and a few lines on the home you want. Oliver will respond within 4 working hours for a free initial conversation.
0476 300 300Cooks River and Coxs Creek flood mapping
Strathfield Council's Cooks River and Coxs Creek Flood Study was prepared by WMAwater for the council and the state's environment department. It was started after flooding of roads and residential areas in August 1986, February 1990 and March 1991. It defines flood levels, depths, velocities and extents on both sides of the two channels within the council area, maps flood hazard, and tests the capacity of council's pipe network and the overland flow when it's exceeded.
The study also looks at the effect of heavier rainfall from climate change. Both channels are concrete lined, except where the Cooks River enters Strathfield Golf Course.
Whether that touches your Strathfield South lot is on the planning certificate. If the lot is flood affected, the habitable floor level, the driveway grade and where the stormwater goes all follow from it. The site analysis has to show overland flow anyway, so I'd rather know early than design a slab and lift it later.
Fire ants and moving soil near Enfield
Fire ants have been found at the Enfield Intermodal Logistics Centre. The NSW Department of Primary Industries and Regional Development published the Biosecurity (Fire Ant – Enfield Intermodal) Control Order 2026 on 26 October 2026. It sets up a control zone around the infested premises and puts conditions on moving high-risk materials such as soil, turf, mulch and potted plants.
That's directly relevant to a new house. Building one means excavating, carting away spoil and bringing in turf, mulch and plants at the end. Heavy vehicles and earthmoving equipment moving out of the control zone into the NSW protection zone must be cleaned so they're free of soil, growing media, mulch, compost and manure.
The department publishes the control zone map and a plain English guide to the order. If your lot is inside the zone, I plan the excavation, spoil disposal and landscaping supply around the order's conditions, and I build them into the program from the start.
Finish level and the published rates
Rawlinsons publishes rates for a one-off Sydney house at several finish levels. A medium-finish brick veneer house is $2,820–$3,040/m² and a medium-finish full-brick house is $2,940–$3,170/m². A high-finish brick veneer house is $3,940–$4,250/m². A prestige full-brick house with partial air-conditioning is $5,200–$5,600/m². All exclude GST and are escalated to the ABS September 2026 index.
If you've been searching for luxury home builders, those last two rows are where that sits. What moves a house between them is written in the specification: facade materials, window frames and glass, joinery, stone, tapware, flooring, lighting, heating and cooling. I agree the level with you before design so the drawings and the budget stay matched.
Every new home needs a BASIX certificate, and since 1 October 2023 that means a 7-star NatHERS minimum. On time, the ABS average build for a new NSW house was 2.99 quarters in 2025-26. Demolition, any asbestos removal from the existing house, excavation and landscaping sit on top of the rates and are priced from the site.

Housing Code or a DA
If the lot is zoned R1, R2, R3, R4 or RU5, is at least 200m² and 6m wide, isn't excluded by the mapping on its planning certificate, and the design meets every standard in the State's Housing Code, a certifier can approve a one- or two-storey home as complying development, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise).
Otherwise it's a DA to Strathfield Council, assessed against the LEP and the new DCP, and a DA has a 40-day assessment period. Strathfield lists its heritage items and heritage conservation areas in Schedule 5 of the LEP, and its heritage controls cover development in the vicinity of an item or conservation area as well as on one. The section 10.7 planning certificate tells you which, if any, apply.

What I check first in Strathfield South
Before the floor plan, these shape the house and the program.
- 01
Zoning, heritage and flood status on the planning certificate
- 02
A detail survey and the DCP's site analysis items
- 03
Overland flow paths and the habitable floor level
- 04
Whether the lot is inside the Enfield fire ant control zone
- 05
The finish level, agreed and written down
- 06
Asbestos in the existing house before demolition
Custom homes in Strathfield South
Which council covers Strathfield South?
Strathfield Council. Its local plans are the Strathfield LEP 2012 and, for DAs lodged from 1 September 2026, the General Residential DCP 2026. The planning certificate for your lot confirms the zoning and any heritage or flood status.
My DA was lodged before 1 September 2026. Which DCP applies?
The new DCP applies to relevant applications lodged on or after 1 September 2026, and its savings and transitional section deals with earlier ones. If you're redesigning and relodging, plan for the new DCP.
Does the fire ant order affect building a house?
It can. If the lot is inside the Enfield Intermodal control zone, moving soil, turf, mulch and plants has conditions, and trucks and earthmoving equipment leaving the zone must be clean of soil. Check the department's map for your address.
What does a custom home cost in Strathfield South?
Rawlinsons gives $2,820–$3,040/m² for a medium-finish brick veneer house and $5,200–$5,600/m² at prestige level, Sydney, excluding GST. Your design, the lot and your selections move it from there. I don't give a fixed price from a first conversation.
Do you also build in Strathfield?
Yes. Buildana builds across Sydney from a studio in Fairfield. Oliver Alameri is the licensed builder, NSW contractor licence 487805C. The Strathfield custom homes page covers the rest of the council area.
Sources and references
Costs are from the Rawlinsons handbook with the local cost index applied; rules and timeframes are checked against the sources below.
- Rawlinsons Australian Construction Handbook, Rawlhouse Publishing
- Environmental Planning and Assessment Act 1979 (NSW)
- State Environmental Planning Policy (Exempt and Complying Development Codes) 2008
- State Environmental Planning Policy (Housing) 2021
- BASIX, NSW Planning Portal
- Asbestos, SafeWork NSW
- Search heritage databases, NSW Environment and Heritage
- Nationwide House Energy Rating Scheme (NatHERS)
- NSW Planning Portal Spatial Viewer (zoning, FSR and hazard maps)
- Strathfield Council
Start with the site, then the house
Tell me the address and what you'd like to build. Oliver will respond within 4 working hours for a free initial conversation.