
Naremburn Home Builder — Custom Homes, KDR, Duplex
Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · Willoughby DA and CDC pathways
The Gore Hill Freeway and Pacific Highway frame the suburb. Heritage Conservation Areas cover most of the inner streets — Council scrutiny is heavy on any external change. North Sydney LGA on the southern boundary at Cammeray and Crows Nest.
Naremburn is assessed by Willoughby City Council. Zoning, flooding, bush fire and heritage are recorded lot by lot on the planning certificate, so that's where every Naremburn feasibility starts.
Council
Willoughby City
Postcode
2065
Build rate (Rawlinsons)
$2,820–$4,250/m² + GST
DA assessment period
40 days (statutory)
Duplex minimum lot
Check the LEP
Low and Mid-Rise areas
4 nominated
Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.
Builder perspective
Building in Naremburn: what gets checked first
Building in Naremburn starts with the same questions on every site: what the title and the planning certificate say about the lot, what Willoughby City Council will assess, and what a geotechnical report says about the ground. Willoughby City assesses a development application on its merits, and a DA has a 40-day assessment period; a design that meets every code standard can go the complying development route instead. Granny flats come under Housing SEPP 2021: complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m²; otherwise the council assesses a DA. Site costs are the part of a budget no desktop estimate can settle: soil, slope, trees, stormwater and services are each confirmed by the engineer, surveyor, arborist or authority responsible. Buildana's price comes after the plans, engineering and site checks, as a written contract with an inclusions schedule, so the number reflects the actual lot. Send through a Naremburn address and Oliver will read the title, zoning and planning certificate before any design conversation starts.
Oliver Alameri — Founder & licensed builder
Licence 487805C · 15+ years' building experience
Naremburn build context
What's known for Naremburn, and the document that confirms each lot-specific fact before a price.
Council
Willoughby City Council
Postcode
2065
Nearest station
St Leonards
Local landmark
Naremburn village & Flat Rock Gully
Zoning
Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer
Lot area and frontage
Title plan, or a detail survey
Site classification (AS 2870)
Geotechnical report for the lot
Age of the house
Built before 1990? Asbestos inspection before demolition
Duplex minimum lot
Lot size map in the council's LEP
Low and Mid-Rise area
St Leonards station (800m walk applies)
Build rate (Rawlinsons)
$2,820–$4,250/m² + GST
Why owners build with Buildana in Naremburn
What every Buildana job includes, written down.
- NSW contractor licence 487805C. Every job runs on a written contract with an inclusions schedule, priced once plans, engineering and site checks are done.
- Willoughby City controls are checked up front, so the design is drawn for the approval pathway it will actually take.
- Oliver coordinates the surveyor, geotechnical and structural engineers, BASIX assessor and certifier, so the documents arrive in the right order.
- Asbestos is identified before demolition, not discovered during it: pre-1990 houses are inspected and licensed removalists do the work.
- Build rates come from the Rawlinsons construction handbook, escalated with the ABS house construction price index, not a guess.
- Anchored on the amanah principle: keeping the word given. Local landmark: Naremburn village & Flat Rock Gully. Nearest station: St Leonards.
Naremburn build costs from published rates
Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a Naremburn lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.
| Build type | Published rate | Basis |
|---|---|---|
| Custom home, per m² | $2,820–$4,250/m² + GST | Rawlinsons individual house, brick veneer, medium to high finish. |
| Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²) | single storey $565k–$980k + GST, double storey $735k–$1.27M + GST | At $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra. |
| Duplex, attached four-bedroom pair | $1.4M–$1.7M + GST | Both dwellings, before site costs and subdivision. |
| Ground-floor addition, per m² | $2,360–$2,840/m² + GST | Rawlinsons ground floor addition, framed to brick veneer. |
| First-floor addition, per m² | $3,790–$4,230/m² + GST | Rawlinsons full first floor addition. |
| New bathroom in an addition | $34k–$38k + GST | Rawlinsons bathroom fit-out and services, each. |
| New kitchen in an addition | $28k–$32k + GST | Rawlinsons kitchen fit-out and services, each. |
| Granny flat | From the catalogue price of the design you choose, plus site costs | Catalogue designs carry their own published price. |
Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.
Free Naremburn feasibility
Thinking about building in Naremburn? Start with the lot, not a sales pitch.
Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.
Buildana services in Naremburn
Six services across Willoughby, each priced for the lot once plans, engineering and site checks are done.
Knockdown Rebuild
Knockdown rebuild in the right order: asbestos inspection, demolition, geotechnical report, slab design, then the build.
Naremburn knockdown rebuild approachDuplex
Duplex feasibility starts with zone, area, frontage and slope, read from the title and the planning certificate.
Naremburn duplex approachGranny Flat
Secondary dwellings under Housing SEPP 2021: complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m².
Naremburn granny flat approachCustom Home
Custom plans tailored to the land, orientation and budget, priced once the drawings and engineering are done.
Naremburn custom home approachExtension
A first-floor addition needs the original footings checked by an engineer, and that happens before the design is finalised.
Naremburn extension approachRenovation
Renovations scoped properly: waterproofing, electrical compliance and smoke alarms to current standards.
Naremburn renovation approachApproval pathway in Naremburn
Council: Willoughby City Council.
Willoughby City administers local planning controls for Naremburn, including setbacks, character provisions and heritage overlays. A certifier assesses a proposed rebuild or dual occupancy against the Codes SEPP and site exclusions before confirming CDC eligibility. Where complying development is unavailable, a DA may be required. Secondary dwellings are assessed under Housing SEPP 2021 and applicable complying-development standards; lot size and zoning alone do not guarantee approval.
CDC pathway
Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.
DA pathway
Willoughby City merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.
Local duplex minimum
Check Willoughby City Council's local environmental plan and its lot size maps for the lot.
As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).
Low and Mid-Rise areas in Willoughby
St Leonards station, Artarmon station, Chatswood station and town centre, Northbridge Plaza shopping centre (Sailors Bay Road). Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). St Leonards station is on the list; whether a Naremburn lot is within an 800m walk of it is measured for each lot. Council rules compared
Granny flats
Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to Willoughby City as a DA.
Naremburn site considerations
The planning certificate for a Naremburn address says whether the lot is flood affected, bush fire prone or in a heritage area. Each brings its own consultant (flood engineer, bush fire assessor, heritage advisor) and its own cost, confirmed before the contract.
Soil & footings
A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.
Demolition & asbestos
A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.
Flood, bushfire & heritage
These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.
What to check for a Naremburn lot, and where
- Zoning, height, floor space ratio and lot size. The zone decides what can be built; the height, floor space ratio and lot size maps set the numbers for the lot. NSW Planning Portal Spatial Viewer
- Setbacks, landscaping, parking and design. These sit in the council's development control plan, which a DA is assessed against. Development control plan, Willoughby City Council
- Flooding. Whether the lot is flood affected, and which floor level or design controls follow. The lot's planning certificate records it too. Flood information, Willoughby City Council
- Bush fire prone land. Whether the lot is mapped bush fire prone, which brings a bush fire assessment and construction standards. NSW Rural Fire Service
- Heritage. Heritage items and conservation areas, listed in Schedule 5 of the council's local environmental plan. NSW heritage databases
- Low and Mid-Rise exclusions. Lots inside a nominated area can still be excluded, for example by hazards or heritage. NSW Planning, Low and Mid-Rise exclusions
- Development contributions. Section 7.11 or 7.12 contributions depend on the council's plan, the location and the proposal. Contributions plans, Willoughby City Council
- Application fees and timing. Each council publishes its application fees in its fees and charges, and tracks its own applications online. Fees and charges, Willoughby City Council
Built by Buildana
Smart Street and The Boulevarde
Buildana builds across Willoughby: single and double-storey homes, knockdown rebuilds, duplexes where the lot meets Willoughby City's minimums or the state's Low and Mid-Rise standards, and granny flats under the Housing SEPP. It starts with your Naremburn site: title, zone, slope, frontage and soil. Then design, then a written price.

Smart Street
A two-storey duplex designed and built by Buildana, pairing a rendered upper floor with dark vertical cladding.

The Boulevarde
An attached two-storey duplex Buildana delivered from start to finish, with tall arched windows and timber-toned joinery.
Projects and case studies
See Smart Street and The Boulevarde, built by Buildana, and studies of other completed Sydney homes.
Read case studiesWilloughby hub
Builder hub for Willoughby: every suburb, every service, council pathway notes.
Open Willoughby hubFree Naremburn site check
Send your Naremburn address: Oliver checks title, zone, slope, frontage and soil before you spend a dollar.
Book a site checkNaremburn build FAQs
The questions that come up most often on a first Naremburn site walk.
- How long does a DA take with Willoughby City?
- NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through Willoughby City or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in Willoughby City's fees and charges.
- What decides the site costs on a Naremburn block?
- The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by Willoughby City's tree controls and an arborist, stormwater by Willoughby City's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.
- How long does a custom home build take in Naremburn?
- The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a Naremburn timeline is set once the design and the approval pathway are known.
- Can I build a duplex in Naremburn?
- The local minimum lot size for a duplex is set in Willoughby City Council's local environmental plan; the lot size map for the address shows it. As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. St Leonards station is one of those areas. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
- What's the granny flat pathway in Naremburn?
- Secondary dwellings in Naremburn are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with Willoughby City. The title, overlays and current controls are checked with the certifier or Willoughby City before design.
- What soil class is typical in Naremburn?
- There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
- What does it cost to knock down and rebuild in Naremburn?
- For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
- Do you do extensions and renovations in Naremburn?
- Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.
Nearby Willoughby suburbs we build in
Other Willoughby suburbs, assessed by the same council: Willoughby City Council.
Ready to talk about your Naremburn build?
Oliver will respond within 4 working hours for a free initial conversation about your Naremburn site, the Willoughby City pathway and what it could cost to build.