Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Contemporary custom home, Sydney
Willoughby 2068 · Willoughby

Willoughby Home Builder — Custom Homes, KDR, Duplex

Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · Willoughby DA and CDC pathways

Willoughby (the namesake suburb) sits between Chatswood and Northbridge — High Street is the village heart, with cafés, the bowling club and Willoughby Park. Heritage Conservation Areas cover several streets. Soil M on the ridge. Bus to Chatswood for rail. Quieter, more village-like than Chatswood with strong school catchments.

Willoughby is assessed by Willoughby City Council. Zoning, flooding, bush fire and heritage are recorded lot by lot on the planning certificate, so that's where every Willoughby feasibility starts.

Council

Willoughby City

Postcode

2068

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

DA assessment period

40 days (statutory)

Duplex minimum lot

Check the LEP

Low and Mid-Rise areas

4 nominated

Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.

Builder perspective

Building in Willoughby: what gets checked first

Building in Willoughby starts with the same questions on every site: what the title and the planning certificate say about the lot, what Willoughby City Council will assess, and what a geotechnical report says about the ground. Willoughby City is the consent authority for a DA; a DA has a 40-day assessment period, and requests for more information or referrals add time. Granny flats come under Housing SEPP 2021: complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m²; otherwise the council assesses a DA. Flooding, bush fire and heritage are mapped lot by lot, so the planning certificate for the address is the first document to read. Buildana was founded in 2025 by Oliver Alameri, a licensed builder (licence 487805C) with 15+ years' experience, and Oliver is the person you deal with from the first call to handover. The conversation that saves the most money on a Willoughby project happens before design: planning controls, site checks and a cost range from published rates.

OA

Oliver Alameri — Founder & licensed builder

Licence 487805C · 15+ years' building experience

Talk to Oliver

Willoughby build context

What's known for Willoughby, and the document that confirms each lot-specific fact before a price.

Council

Willoughby City Council

Postcode

2068

Nearest station

Chatswood

Local landmark

Willoughby Park & High Street village

Zoning

Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer

Lot area and frontage

Title plan, or a detail survey

Site classification (AS 2870)

Geotechnical report for the lot

Age of the house

Built before 1990? Asbestos inspection before demolition

Duplex minimum lot

Lot size map in the council's LEP

Low and Mid-Rise area

Chatswood station and town centre (800m walk applies)

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

Why owners build with Buildana in Willoughby

What every Buildana job includes, written down.

  • NSW contractor licence 487805C. Every job runs on a written contract with an inclusions schedule, priced once plans, engineering and site checks are done.
  • Willoughby City controls are checked up front, so the design is drawn for the approval pathway it will actually take.
  • Oliver coordinates the surveyor, geotechnical and structural engineers, BASIX assessor and certifier, so the documents arrive in the right order.
  • Asbestos is identified before demolition, not discovered during it: pre-1990 houses are inspected and licensed removalists do the work.
  • Build rates come from the Rawlinsons construction handbook, escalated with the ABS house construction price index, not a guess.
  • Anchored on the amanah principle: keeping the word given. Local landmark: Willoughby Park & High Street village. Nearest station: Chatswood.

Willoughby build costs from published rates

Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a Willoughby lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.

Build typePublished rateBasis
Custom home, per m²$2,820–$4,250/m² + GSTRawlinsons individual house, brick veneer, medium to high finish.
Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²)single storey $565k–$980k + GST, double storey $735k–$1.27M + GSTAt $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra.
Duplex, attached four-bedroom pair$1.4M–$1.7M + GSTBoth dwellings, before site costs and subdivision.
Ground-floor addition, per m²$2,360–$2,840/m² + GSTRawlinsons ground floor addition, framed to brick veneer.
First-floor addition, per m²$3,790–$4,230/m² + GSTRawlinsons full first floor addition.
New bathroom in an addition$34k–$38k + GSTRawlinsons bathroom fit-out and services, each.
New kitchen in an addition$28k–$32k + GSTRawlinsons kitchen fit-out and services, each.
Granny flatFrom the catalogue price of the design you choose, plus site costsCatalogue designs carry their own published price.

Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.

Free Willoughby feasibility

Thinking about building in Willoughby? Start with the lot, not a sales pitch.

Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.

Written contract with an inclusions schedule Licence 487805C Willoughby City DA and CDC pathways explained

Buildana services in Willoughby

Six services across Willoughby, each priced for the lot once plans, engineering and site checks are done.

Knockdown Rebuild

Demolition, asbestos removal by licensed contractors, a slab engineered to the geotechnical report, then the new house, under one written contract.

Willoughby knockdown rebuild approach

Duplex

Subdividing the finished pair is a separate question from the build, so it's checked against the council's rules before design.

Willoughby duplex approach

Granny Flat

If the lot and design meet Housing SEPP Schedule 1 the granny flat can be complying development; if not, it goes to the council as a DA.

Willoughby granny flat approach

Custom Home

Brief-first design: drawn to your block and budget, then engineered and approved.

Willoughby custom home approach

Extension

Rear and second-storey additions, with the existing slab, frame and roof investigated before pricing.

Willoughby extension approach

Renovation

Older homes renovated with care: original materials kept where they're worth keeping, replaced where they aren't.

Willoughby renovation approach

Approval pathway in Willoughby

Council: Willoughby City Council.

For a Willoughby rebuild, the pathway is worth settling before drafting starts. A CDC suits a design that meets every code standard on a lot the codes apply to; a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). A DA through Willoughby City lets the design flex; a DA has a 40-day assessment period. Neither clock includes design, engineering or the time to answer requests for more information.

CDC pathway

Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.

DA pathway

Willoughby City merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.

Local duplex minimum

Check Willoughby City Council's local environmental plan and its lot size maps for the lot.

As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).

Low and Mid-Rise areas in Willoughby

St Leonards station, Artarmon station, Chatswood station and town centre, Northbridge Plaza shopping centre (Sailors Bay Road). Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). Chatswood station and town centre is on the list; whether a Willoughby lot is within an 800m walk of it is measured for each lot. Council rules compared

Granny flats

Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to Willoughby City as a DA.

Willoughby site considerations

Three things move a Willoughby budget before the house itself: the ground (confirmed by a geotechnical report), the slope (confirmed by a detail survey) and the service connections (confirmed by Sydney Water and the electricity network). Each is priced once that document is in hand, not allowed for by guesswork.

Soil & footings

A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.

Demolition & asbestos

A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.

Flood, bushfire & heritage

These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.

What to check for a Willoughby lot, and where

Willoughby build FAQs

The questions that come up most often on a first Willoughby site walk.

How long does a custom home build take in Willoughby?
The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a Willoughby timeline is set once the design and the approval pathway are known.
Can I build a duplex in Willoughby?
The local minimum lot size for a duplex is set in Willoughby City Council's local environmental plan; the lot size map for the address shows it. As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. Chatswood station and town centre is one of those areas. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
What's the granny flat pathway in Willoughby?
Secondary dwellings in Willoughby are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with Willoughby City. The title, overlays and current controls are checked with the certifier or Willoughby City before design.
What soil class is typical in Willoughby?
There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
What does it cost to knock down and rebuild in Willoughby?
For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
Do you do extensions and renovations in Willoughby?
Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.
How long does a DA take with Willoughby City?
NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through Willoughby City or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in Willoughby City's fees and charges.
What decides the site costs on a Willoughby block?
The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by Willoughby City's tree controls and an arborist, stormwater by Willoughby City's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.

Nearby Willoughby suburbs we build in

Other Willoughby suburbs, assessed by the same council: Willoughby City Council.

Ready to talk about your Willoughby build?

Oliver will respond within 4 working hours for a free initial conversation about your Willoughby site, the Willoughby City pathway and what it could cost to build.