
Caddens 2747 · Penrith City Council
Custom Home Builders Caddens
In Caddens, the title and Penrith's plan decide the house before the floor plan does.
Caddens is in the City of Penrith. Whether you're holding a vacant lot or replacing the house on it, the order of work is the same: read the title, read the planning certificate, then design a home that fits the block and gets through approval the quickest way it can.
Short answer
How do I build a custom home in Caddens?
Start with the title search and the section 10.7 planning certificate. Together they show any restrictions on the lot, its zoning and any hazards. If the design meets the Housing Code, a certifier can approve it as complying development. If it doesn't, it's a DA to Penrith City Council under Penrith LEP 2010 and DCP 2014.
Written and reviewed by Oliver Alameri
Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana
Fact-checked
Two ways to get a Caddens home approved
The State's Housing Code lets a certifier approve a new one- or two-storey house as complying development, without a DA. It applies to lots in the R1, R2, R3, R4 and RU5 zones that are at least 200m² and 6m wide, and the design has to meet every standard: setbacks, height, site coverage and landscaping among them.
Miss one standard and the house goes to Penrith City Council as a development application. Council assesses it against Penrith Local Environmental Plan 2010 and Penrith Development Control Plan 2014. On timing, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise), while a DA has a 40-day assessment period.
Design to the code where you can. Go to council where the design is worth it.
Read the title before you brief a designer
Where a lot was created by subdivision, the developer often registered restrictions on the title under section 88B of the Conveyancing Act. They can cover facade materials, fencing, house size or what goes in the front yard, and they bind you as well as council's rules. A certifier will check them, so the design should too.
The planning certificate shows the zoning and whether the lot is affected by flood or bushfire mapping. I read both before drawing anything, because they change setbacks, floor levels and materials.
- Title search, including any 88B instrument
- Section 10.7 planning certificate: zoning and hazards
- Sewer and stormwater locations, and any easements
Have a lot in Caddens?
Send the address and what you'd like to build. Oliver will respond within 4 working hours for a free initial conversation.
0476 300 300What the published rates say
Rawlinsons gives $2,820–$3,040/m² for an individual house at a medium finish in brick veneer, $2,940–$3,170/m² in full brick, and $3,940–$4,250/m² for a high-finish brick veneer house. They are Sydney rates excluding GST, escalated to the ABS September 2026 index. Multiply by the floor area you want.
Site works, services, driveway, fencing and landscaping sit on top, and so does demolition if there's a house to remove. Those depend on the lot, so I price them after seeing it, not from a first conversation.

Design and construct, one contract
Design and construct means one contract for the design, the engineering, the approval and the build. The plan is drawn for your lot, its width, its fall and which way the back faces, rather than taken from a catalogue and squeezed to fit.
Every new home in NSW needs a BASIX certificate, and since 1 October 2023 that means a NatHERS rating of at least 7 stars. Orientation and window placement do a lot of that work for free when they're designed in from the start.
What I check first on a Caddens lot
These decide what the house can be before anyone draws a room.
- 01
Restrictions on the title and any estate guidelines
- 02
Zoning, flood and bushfire mapping on the planning certificate
- 03
Lot width and area against the Housing Code
- 04
Which way the back of the lot faces
- 05
Fall across the block and where stormwater can go
- 06
Sewer main location and easements
Building a home in Caddens
Which council approves homes in Caddens?
Penrith City Council, if the house goes as a DA. If it meets the Housing Code, a registered certifier can approve it as complying development instead.
Do title restrictions apply on top of council's rules?
Yes. Restrictions registered on the title apply as well as Penrith's plans and the Housing Code. A design that council would accept can still breach a restriction on the title, so check both.
Should I extend instead of building new?
Sometimes. If the house is sound and the layout mostly works, an extension or first floor addition can make sense. If it doesn't, building new lets the plan fit the lot. Our Caddens extensions page covers that side.
Do you build elsewhere around Penrith and Camden?
Yes. Buildana builds across Sydney from a studio in Fairfield. The Penrith and Camden custom home pages cover those councils' rules.
Can I check your licence?
Yes. Buildana's NSW contractor licence is 487805C, and you can look it up on Service NSW's licence check before signing anything.
Sources and references
Costs are from the Rawlinsons handbook with the local cost index applied; rules and timeframes are checked against the sources below.
- Rawlinsons Australian Construction Handbook, Rawlhouse Publishing
- Environmental Planning and Assessment Act 1979 (NSW)
- State Environmental Planning Policy (Exempt and Complying Development Codes) 2008
- BASIX, NSW Planning Portal
- Building on bush fire prone land, NSW RFS
- Nationwide House Energy Rating Scheme (NatHERS)
- NSW Planning Portal Spatial Viewer (zoning, FSR and hazard maps)
- Penrith City Council
- Environmental Planning and Assessment Regulation 2021 (NSW)
- Licence check, Verify NSW (Service NSW)
Start with the address
Send the address and what you want from the house. Oliver will respond within 4 working hours for a free initial conversation.