Granny Flat Builders Caddens

Whether a Caddens backyard takes a granny flat comes down to 450m² and 12m.

Most granny flats in NSW are approved under the State's Housing SEPP, not under a council's own rules. In Caddens that means a certifier can approve one if the lot and design meet every standard. If they don't, the application goes to Penrith City Council as a DA.

Council
Penrith City Council
Lot size for complying development
At least 450m²
Largest granny flat
60m², or more if the local plan allows
60m², one bathroom, built (incl. GST)
$227k–$263k

Short answer

Can I build a granny flat in Caddens?

Usually, if the lot is big enough. For complying development the Housing SEPP needs at least 450m² of land and, on lots up to 900m², 12m of frontage at the building line. The granny flat can be up to 60m² and 8.5m high. If the lot or design misses a standard, it becomes a DA to Penrith City Council.

Written and reviewed by

Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana

Fact-checked

Certifier or council

A granny flat that meets every standard in Schedule 1 of the Housing SEPP can be approved as complying development by a registered certifier. Council doesn't assess it. The standards cover lot area and frontage, setbacks, height, the combined floor area of both homes, site coverage, landscaping and private open space.

If one standard isn't met, the application becomes a DA to Penrith City Council, assessed against Penrith LEP 2010 and Penrith DCP 2014. On timing, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise), while a DA has a 40-day assessment period. Either way the lot can't be subdivided: the granny flat stays with the house.

Meet every standard and a certifier approves it. Miss one and it's a Penrith DA.

The standards on a 450–600m² lot

For a lot of 450–600m², Schedule 1 sets a side setback of 0.9m and a rear setback of 3m for the granny flat. All buildings together can cover up to 50% of the site, at least 20% has to stay landscaped, and the house and granny flat together can't exceed 330m² of floor area.

There also has to be more than 24m² of private open space, at least 4m wide and next to a living area, which the two homes can share. On a lot with a big house already on it, the combined floor area limit can decide the size of the granny flat before the backyard does.

  • Lot of at least 450m²
  • 12m frontage at the building line on lots up to 900m²
  • Granny flat up to 60m² and 8.5m high

Thinking about a granny flat in Caddens?

Send the address and what you'd like out the back. Oliver will respond within 4 working hours for a free initial conversation.

0476 300 300

No obligation. We only use your details to respond to this enquiry.

What's under the backyard

The planning certificate shows the zoning and whether the lot is affected by flood or bushfire mapping. Some flood and bushfire categories rule out complying development altogether. The title shows any easements and any restrictions registered when the lot was created. Read both before choosing a design.

Then there's what you can't see. The sewer main and stormwater lines decide where the slab can sit, and a soil test sets how the slab is designed. Those are site costs, and they're only known once the lot has been checked.

Bedroom with a wide highlight window at Smart Street, built by Buildana
A bedroom at Smart Street, built by Buildana

What it costs, and what it rents for

On Rawlinsons' Sydney rates escalated to the ABS September 2026 index, a 60m² granny flat with one kitchen and one bathroom costs about $227k–$263k to build, including GST. Sewer connection, soil test, approval fees, paths and landscaping are extra.

On rent, the NSW Government rent figures I quote by council don't include Penrith, so I won't put a weekly rent for Caddens on this page. A local property manager can give you a current figure for your street.

What I check first in a Caddens backyard

These decide what fits before you pick a design.

  1. 01

    Lot area against 450m²

  2. 02

    Frontage measured at the building line

  3. 03

    Combined floor area of the house and the granny flat

  4. 04

    Flood and bushfire mapping on the planning certificate

  5. 05

    Easements and restrictions on the title

  6. 06

    Sewer, stormwater and machine access down the side

Granny flats in Caddens

Do I need Penrith council approval for a granny flat?

Not always. If the design meets the Housing SEPP standards, a registered certifier can issue a complying development certificate. If it doesn't, it's a DA to Penrith City Council.

My lot is under 450m². Can I still build one?

Not as complying development, which needs at least 450m². A DA may still be possible, and Penrith City Council would assess it under its own plans.

How big can a granny flat be in Caddens?

Up to 60m² under the Housing SEPP, or more where the local plan allows. The combined floor area of the house and the granny flat is capped as well.

Can the granny flat be sold separately?

No. A lot with a secondary dwelling can't be subdivided, so the granny flat is always sold with the house.

Do you build granny flats elsewhere in Penrith?

Yes. Buildana builds across Sydney. The Penrith granny flat page covers the wider council area.

Start with the backyard

Send the address and what the granny flat is for. Oliver will respond within 4 working hours for a free initial conversation.