Chiswick 2046 · City of Canada Bay
Design and Build Chiswick
Design and build puts one builder in charge. NSW law decides what that builder has to give you in writing.
A design and build home in Chiswick runs under one builder from the brief to the keys. That's simpler for you. But the protections that matter most don't come from a brochure. They come from the Home Building Act: a written contract, home building compensation cover and a cap on the deposit. Here's how they fit around the design.
Short answer
How does design and build work in Chiswick?
One licensed builder designs, gets approval for and builds the home. In NSW, residential building work over $5,000 needs a written contract, the deposit is capped at 10%, and work valued at $20,000 or more needs home building compensation cover before money is taken. Approval in Chiswick is complying development or a DA to the City of Canada Bay.
Written and reviewed by Oliver Alameri
Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana
Fact-checked
The order things happen in
It starts with a site visit, the title and the section 10.7 planning certificate. Then a survey, a brief and a concept design, priced as it develops so the design never runs ahead of the budget.
The building contract comes once the design is far enough along to price properly. Before that point, nothing about the price is final, and you shouldn't be asked to treat it as if it were. Approval documents, engineering and BASIX follow, then construction and handover.
- Site visit, title and planning certificate
- Survey, brief and concept design
- Written contract and HBC certificate
- Engineering, BASIX and approval
- Construction, inspections and handover
Nothing about the price is final until the design can carry it.
Your protections, in plain terms
Residential building work over $5,000 needs a written contract. For work valued at $20,000 or more including GST, the builder must have home building compensation cover in place before taking any money or starting work. You can check a certificate on Service NSW's HBC Check.
The deposit is capped at 10% of the contract price. You can also check a builder's licence on Verify NSW. Buildana's is NSW contractor licence 487805C, held by Oliver Alameri, who has 15+ years' building experience.
Planning a home in Chiswick?
Send the address and what you'd like to build. Oliver will respond within 4 working hours for a free initial conversation.
0476 300 300Approval in Canada Bay
The Housing Code applies to lots in the R1, R2, R3, R4 and RU5 zones that are at least 200m² and 6m wide, for one- and two-storey homes. A design that meets it can be approved by a registered certifier. One that needs a variation goes to the City of Canada Bay as a DA.
On timing, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise), while a DA has a 40-day assessment period. The planning certificate shows the zoning and whether the lot is a heritage item, in a heritage conservation area or flood affected. Each of those can change the approval path, so it's read before the concept design.
What the house costs
Rawlinsons gives $2,820–$3,040/m² for an individual house in Sydney at a medium finish in brick veneer and $3,940–$4,250/m² at a high finish, excluding GST, escalated to the ABS September 2026 index. Multiply by the floor area. Demolition of an existing house and site costs come on top.
For the build itself, the ABS average build for a new NSW house was 2.99 quarters in 2025-26. The contract sets the build period for your job.

What to have in hand before you sign
Ask for these on any design and build job in Chiswick.
- 01
A written contract covering design and construction
- 02
The builder's licence number, checked on Verify NSW
- 03
An HBC certificate before any money changes hands
- 04
A deposit no higher than 10%
- 05
The planning certificate and title for the lot
- 06
A design priced as it developed, not a guess
Design and build in Chiswick
What is home building compensation cover?
Insurance the Home Building Act requires for residential building work valued at $20,000 or more including GST. The builder must have it in place before taking any money or starting work, and you can check the certificate on Service NSW's HBC Check. icare NSW explains what it covers.
How much deposit can a builder ask for?
No more than 10% of the contract price for residential building work in NSW.
Does the Low and Mid-Rise policy affect a Chiswick lot?
In the City of Canada Bay, the NSW list names Concord town centre (Majors Bay Road), Concord West station, Drummoyne town centre, Five Dock town centre and North Strathfield station. The State's standards apply only within 800m walking distance of one of them. The planning certificate confirms whether they apply to your lot.
Which council approves a new home in Chiswick?
The City of Canada Bay, if it goes as a DA. A design that meets the Housing Code can be approved as complying development by a registered certifier.
Sources and references
Costs are from the Rawlinsons handbook with the local cost index applied; rules and timeframes are checked against the sources below.
- City of Canada Bay
- Rawlinsons Australian Construction Handbook, Rawlhouse Publishing
- Environmental Planning and Assessment Act 1979 (NSW)
- State Environmental Planning Policy (Exempt and Complying Development Codes) 2008
- BASIX, NSW Planning Portal
- Home Building Act 1989 (NSW)
- Search heritage databases, NSW Environment and Heritage
- NSW Planning Portal Spatial Viewer (zoning, FSR and hazard maps)
- HBCF: what am I covered for?, icare NSW
- Licence check, Verify NSW (Service NSW)
- Environmental Planning and Assessment Regulation 2021 (NSW)
- Low and Mid-Rise Housing areas, NSW Planning
One builder, everything in writing