
Drummoyne 2047 · City of Canada Bay
Design and Build Drummoyne
Design and build starts with one honest question: does this house need replacing, or extending?
People who search for design and build in Drummoyne also search for extensions. That's the real decision. A design and build contract can cover either one, from the first sketch to the keys. Which is right depends on the house, the lot and what the City of Canada Bay's controls allow.
Short answer
What does design and build mean for a Drummoyne home?
One builder takes the job from brief to handover under one contract: survey, design, engineering, BASIX, approval and construction. In Drummoyne that can be a new home or a major extension. Approval is complying development where the design meets the code, or a DA to the City of Canada Bay. The price firms up as the design develops.
Written and reviewed by Oliver Alameri
Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana
Fact-checked
Extend, or start again
An extension keeps what's good about the house you have. A new home fixes what an extension can't: a poor layout, failing structure, or rooms that face the wrong way. The question is how much of the existing house you'd really keep.
If the honest answer is the front rooms and little else, a new home is often the cleaner job. If the house is sound and the problem is space, an extension or a second storey is usually better value. I look at both before recommending either.
Check the planning certificate early. If it shows the lot is a heritage item or in a heritage conservation area, the approval path changes and so does what council will accept, including whether the house can come down.
Count what you'd really keep. That answers most of it.
Near Drummoyne town centre
Drummoyne town centre is one of the NSW Government's Low and Mid-Rise Housing areas. Stage 1 of the reforms, from 1 July 2024, permits dual occupancies in the R2 zone across NSW. Stage 2, from 28 February 2025, set standards for residential land within 800m walking distance of the listed areas.
Inside that distance, a dual occupancy needs a lot of 450m² and 12m wide, with a floor space ratio of 0.65:1 and a height of 9.5m. Outside it, Canada Bay Local Environmental Plan 2013 applies. If you're replacing the house anyway and the lot is close to the town centre, it's worth knowing whether it could take two homes before the design starts.
Weighing up a Drummoyne home?
Send the address and what isn't working in the house now. Oliver will respond within 4 working hours for a free initial conversation.
0476 300 300What one design and build contract covers
Survey, planning certificate, concept design, engineering, BASIX and approval documents, then construction and handover. The builder who draws the house is the one who has to build it, which keeps the design honest about cost.
At Buildana that's Oliver Alameri, NSW contractor licence 487805C, with 15+ years' building experience. Nobody can fix a price from a first conversation. It firms up as the design, selections and site investigations are completed.
- Survey and planning certificate
- Concept design, priced as it develops
- Engineering, BASIX and approval
- Construction, inspections and handover

Approval and build rates
The Housing Code applies to lots in the R1, R2, R3, R4 and RU5 zones that are at least 200m² and 6m wide, for one- and two-storey homes. A design that needs a variation goes to the City of Canada Bay as a DA. On timing, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise), while a DA has a 40-day assessment period.
Rawlinsons gives $3,940–$4,250/m² for a high-finish brick veneer house in Sydney and $5,200–$5,600/m² for a prestige full brick home with partial air-conditioning, excluding GST, escalated to the ABS September 2026 index. Demolition and site costs come on top. For the build itself, the ABS average build for a new NSW house was 2.99 quarters in 2025-26.
What I check first in Drummoyne
These decide between a new home, an extension, or two homes.
- 01
Heritage listing or conservation area on the certificate
- 02
The condition of the existing structure
- 03
Walking distance to Drummoyne town centre
- 04
Lot area, width and fall
- 05
Easements, sewer location and restrictions on the title
- 06
Whether the design can meet the Housing Code
Design and build in Drummoyne
Is design and build the same as design and construct?
Yes. Both mean one builder is responsible for the design, the approvals and the construction under one contract.
Do you do extensions in Drummoyne as well as new homes?
Yes. Ground floor extensions and second storeys are design and build jobs too. The Drummoyne home extension page covers them.
Is my lot close enough to Drummoyne town centre?
The State's standards apply within 800m walking distance of Drummoyne town centre, measured along paths. NSW Planning publishes an indicative map, and the planning certificate confirms whether the standards apply and whether an exclusion such as heritage takes the lot out.
Which council approves a new home in Drummoyne?
The City of Canada Bay, if it goes as a DA. A design that meets the Housing Code can be approved by a registered certifier as complying development.
Sources and references
Costs are from the Rawlinsons handbook with the local cost index applied; rules and timeframes are checked against the sources below.
- City of Canada Bay
- Rawlinsons Australian Construction Handbook, Rawlhouse Publishing
- Environmental Planning and Assessment Act 1979 (NSW)
- State Environmental Planning Policy (Exempt and Complying Development Codes) 2008
- BASIX, NSW Planning Portal
- Search heritage databases, NSW Environment and Heritage
- NSW Planning Portal Spatial Viewer (zoning, FSR and hazard maps)
- Low and Mid-Rise Housing areas, NSW Planning
- Environmental Planning and Assessment Regulation 2021 (NSW)
Replace or extend: start with the house
Send the address and a few photos of the house. Oliver will respond within 4 working hours for a free initial conversation.