Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

Home Extensions & Additions Asquith — Live In, Build On

We extend homes across Asquith 2077, often while owners stay in place, working to Hornsby Shire Council's rules and keeping the house weathertight during the build.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300

Asquith Home Extensions — Fixed Price

A home extension in Asquith grows the family home on generous land — 1960s-1990s brick on 700 to 1,200m² blocks where the rear wing fits without the yard noticing and the station-precinct R3 gets the zoning check.

The bush-edge lots get the BAL assessment, the sandstone is read before the dig, and the junctions are engineered.

The wing beats the cost of upsizing on the upper North Shore fringe.

We build these under NSW contractor licence 487805C. Get our extension scope, with zoning and BAL checked, before you commit.

Buildana manages the complete home extension process in Asquith — from design consultation and structural engineering through to DA or CDC approval, and construction to handover, with a fixed-price contract once design and scope are set. Extend your home without the stress.

Read our Home Extension Cost Guide 2026 or explore extension approval pathways in NSW.

  • Rawlinsons Sydney rates: ground floor $2,360–$2,840/m² + GST, first floor $3,790–$4,230/m² + GST
  • Hornsby Shire Council DA and CDC approvals managed
  • Ground floor, rear and second-storey additions
  • Hawkesbury Sandstone bedrock — structural engineering included
  • 1900s–1940s Federation heritage (Beecroft/Cheltenham/Pennant Hills/Wahroonga boundary) + 1960s–1990s brick (Cherrybrook/Asquith/Mount Colah/Mount Kuring-gai) + 2010s+ R3/R4 redevelopment around Hornsby/Asquith/Waitara stations-era homes assessed for extension suitability
  • Connect new to existing — clean, matched finish
  • 6-year structural warranty
  • Free design consultation — near Asquith station
Asquith home extension — matched connection to existing dwelling
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

Room the block gives up freely

Asquith's 700 to 1,200m² blocks hold a full family wing without touching the yard — second living, bedrooms, a suite — with the brick taking the additions confidently once engineered.

Near the station, the R3 value gets the check first.

Bush and rock handled

BAL ratings apply on the bush-edge lots, and the sandstone is read before the dig.

Both the BAL materials and the rock read are in the fixed price up front.

Home extension builder in Asquith — key facts

Suburb
Asquith, NSW 2077
Council / LGA
Hornsby Shire Council (Hornsby Shire)
Primary zoning
R2
Typical lot size
700–1,200m² typical (Hornsby/Asquith/Pennant Hills/Beecroft/Wahroonga boundary/Cherrybrook); 1–5ha acreage (Galston/Berrilee/Arcadia/Forest Glen/Glenorie/Berowra Heights bushland fringe)
Soil class
Hawkesbury Sandstone bedrock
Home era
1900s–1940s Federation heritage
Typical price range
Ground floor $2,360–$2,840/m² + GST; first floor $3,790–$4,230/m² + GST (Rawlinsons Sydney)
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period
Approval pathway
CDC for most rear extensions, DA for second-storey

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Asquith Extension — Free Consultation

Free design consultation for Asquith 2077. We'll assess your home and talk through extension options and the approval pathway, then provide a fixed-price contract once design and scope are set.

Start Your Project