Bexley 2207 · Bayside Council
Home Extensions Bexley
If the back of your Bexley house is an old lean-to or sunroom, the extension starts by taking it off.
A rear section added after the house was built can sit on shallow footings, at a different floor level, with sheeting that needs testing before anyone cuts it. Replacing it properly gives you a kitchen, living area or bedroom that's level with the house and built to current standards. Here's what to check, how Bayside Council or a certifier approves it, and what the published rates say.
Short answer
How do I plan a home extension in Bexley?
Get the section 10.7 planning certificate first. Bexley is in Bayside Council, and the certificate shows the lot's zoning, heritage status and hazards. If the house has an old rear section, have it tested for asbestos before demolition is priced. Then test the design against the State Housing Code: a certifier can approve a complying design, otherwise it's a DA to Bayside.
Written and reviewed by Oliver Alameri
Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana
Fact-checked
Taking off the old rear section
If the back of the house has a lean-to, an enclosed verandah or a rear laundry that was added later, you can usually tell: a step down at the back door, a roof at a flatter pitch than the main house, a floor that feels different underfoot.
Rebuilding that part with the extension lets the new rooms be designed as one piece, instead of being planned around a structure that was never meant to last. But it has to come off first, and that's where the early checks matter.
Fibre cement sheeting in older additions can contain asbestos. Have a licensed asbestos assessor sample anything that will be cut, drilled or removed, so demolition is priced on what's actually there. SafeWork NSW recommends using a licensed asbestos professional to remove any amount of bonded asbestos.
- Sample wall sheeting, eaves and wet-area linings before demolition is priced
- Find where stormwater and sewer lines run under the rear section
- Check the floor level of the main house at the back door
Meeting the original house
If the main house sits on a timber floor over a subfloor, the new rooms have to meet it at the same level. That can mean a suspended timber floor in the addition too, or a slab set at the right height, as the engineer designs it. If the house is on a slab, the new slab is set to match and either tied in or separated with a joint, as the engineer specifies.
A timber-floored house has one more trap. An addition built against it can cover the subfloor vents along that wall. The ventilation has to be kept, through the new subfloor or by venting elsewhere, or the old floor framing stays damp.
The roof junction is the other detail to settle on paper. The new roof either carries on the old pitch or meets it with a clean, properly flashed junction, and the gutters and downpipes have to take water from both.

Replacing the back of your Bexley house?
Send the address and a few photos of the rear. Oliver will respond within 4 working hours for a free initial conversation about what comes off and what goes on.
0476 300 300Approval with Bayside Council
Bexley and Bexley North are both in Bayside Council and share the 2207 postcode. A design that meets the State Housing Code can be approved by a private certifier as complying development. The code covers alterations and additions on lots in the R1, R2, R3, R4 and RU5 zones of at least 200m² and 6m wide.
If the lot is a heritage item or sits in a heritage conservation area, the certifier will tell you whether the code route is still open. If it isn't, or the design falls outside the code, it's a development application to Bayside Council. The planning certificate shows the heritage position, and NSW Environment and Heritage's heritage databases let you search the address yourself.
A CDC must be decided within 20 days where neighbours are notified (10 days otherwise). For a DA, a DA has a 40-day assessment period.
What the published rates say
Rawlinsons publishes Sydney rates for ground floor additions, excluding GST and escalated to the ABS September 2026 index: $2,620–$2,820/m² for a brick veneer addition of 50–75m², $2,630–$2,840/m² for one of 75–125m², and $2,360–$2,550/m² for a framed and clad addition of 75–125m².
A bathroom fitted out in the addition adds $37k–$42k and a kitchen $31k–$35k, both including GST. Demolishing the old rear section, any asbestos removal and stormwater changes sit outside those rates, and are priced once the house has been inspected.
If the yard is too small to build out, a full first floor addition is $3,930–$4,230/m² for 75–100m² on the same basis, with an engineer's check of the house below first.
Price the demolition on test results, not on a guess about what the old sheeting is.
What I check first on a Bexley extension
These shape the design and the price before the floor plan does.
- 01
Zoning and heritage status on the section 10.7 planning certificate
- 02
Asbestos sampling of the old rear section
- 03
The floor level and subfloor vents along the back wall
- 04
Where the stormwater and sewer lines run
- 05
Whether the design can meet the State Housing Code
- 06
Restrictions or easements on the title
Bexley extension questions
Is Bexley North in the same council as Bexley?
Yes. Both suburbs are in Bayside Council and share the 2207 postcode, so an extension in either goes to Bayside as a DA, or to a private certifier as a complying development certificate.
Can we live in the house while the back is rebuilt?
For much of the job, often yes, because the work is at the rear. Expect a stretch without the kitchen or laundry if those are being replaced, and plan around the day the new roof is joined to the old one.
Do I need an asbestos test before an extension?
If anything older will be cut, drilled or removed, yes. A licensed asbestos assessor samples it, and the result decides how demolition is done and priced. SafeWork NSW recommends a licensed professional for removing any amount of bonded asbestos.
What paperwork protects me?
Three things. Residential building work over $5,000 needs a written contract. Once the job is valued at $20,000 or more including GST, the builder must have home building compensation cover in place before taking a deposit or starting, and Service NSW's HBC Check lets you confirm it. And no deposit can be more than 10%.
Do you renovate kitchens and bathrooms in Bexley too?
Yes. If the house needs a better kitchen or bathroom rather than more space, that's a renovation. We build across Sydney from our studio in Fairfield.
Sources and references
Costs are from the Rawlinsons handbook with the local cost index applied; rules and timeframes are checked against the sources below.
- Bayside Council
- Rawlinsons Australian Construction Handbook, Rawlhouse Publishing
- Environmental Planning and Assessment Act 1979 (NSW)
- State Environmental Planning Policy (Exempt and Complying Development Codes) 2008
- Asbestos, SafeWork NSW
- Home Building Act 1989 (NSW)
- Search heritage databases, NSW Environment and Heritage
- NSW Planning Portal Spatial Viewer (zoning, FSR and hazard maps)
- Environmental Planning and Assessment Regulation 2021 (NSW)
- HBCF: what am I covered for?, icare NSW
Start with the back door
Tell us what's at the rear of the house and what you need from the new space. Oliver will respond within 4 working hours for a free initial conversation.